Jump to content

Tower at PNC Plaza

Coordinates: 40°26′25″N 80°00′01″W / 40.44025°N 80.00017°W / 40.44025; -80.00017
From Wikipedia, the free encyclopedia
Tower at PNC Plaza
Tower at PNC Plaza seen from Forbes Avenue
Map
General information
StatusCompleted
TypeOffice
Location300 Fifth Ave., Pittsburgh, Pennsylvania
Coordinates40°26′25″N 80°00′01″W / 40.44025°N 80.00017°W / 40.44025; -80.00017
Construction started2011
Completed2015
OpeningOctober 2, 2015
Cost$400 million
OwnerPNC Financial Services Group
ManagementPNC Realty Services
Height
Roof544 ft (166 m)
Top floor424 ft (129 m)
Technical details
Floor count33
Floor area800,000 sq ft (74,322 m2)
Design and construction
Architect(s)Gensler
DeveloperPNC Financial Services Group
Main contractorPJ Dick
References
[1]

The Tower at PNC Plaza is a 33-story skyscraper in Pittsburgh, Pennsylvania. It is the corporate headquarters of the PNC Financial Services and has approximately 800,000 square feet (74,000 m2), standing 33 stories (545 feet) tall.[2][3] Nearby buildings totaling 37,000 square feet (3,400 m2), were purchased by PNC and deconstructed to make space for the Tower at PNC Plaza.[4][5] It is located at the intersection of Fifth Avenue and Wood Street, where PNC and its predecessors have been based since 1858.

The project was estimated to cost $400 million when announced in 2011 (or $542 million today).[6]

Construction began in spring of 2012 and was completed in October 2015. The tower is one of the greenest high-rises ever built, and even exceeds the current criteria for a LEED Platinum certified building. The Tower features sustainable attributes such as an operable double-skin facade, an onsite grey water reuse system, locally sourced building materials, fixtures and furniture made from recycled materials, and other green strategies to substantially reduce the environmental impact of the building. Some of these features enable the Tower's heating and cooling systems to operate in a "net-zero-energy state" up to 30% of the year.[7] This is accomplished by its innovative solar chimney, which creates a stack effect through the core of the building to ventilate excess heat without the need for mechanical ventilation. The Tower's sloped roof acts as a solar collector and is positioned facing south.

The tower's "topping off" ceremony was held Tuesday, June 24, 2014, with William Demchak, PNC chairman, president and CEO, and Gary Saulson, director of corporate real estate hosting it on site.[8] The tower officially opened on October 2, 2015.[9]

Tower at PNC LEED certification outside the front entrance.
Progress on the tower site in June 2012.

Planning

[edit]

In 2009, PNC approached Gensler with an idea for its new headquarters in Pittsburgh, PA.[10]

Gensler project team members toured several buildings for energy efficient and sustainable design inspiration such as Manitoba Hydro's headquarters in Winnipeg, Manitoba, the Bullitt Center in Seattle, WA, KfW Bank in Frankfurt, Germany, and the Department of Public Works in San Francisco, CA.[10]

The Tower was designed with three core pillars reflecting company values in mind: Community Builder, Workplace Innovator, and Energy Responder.[11]

Community Builder

[edit]

PNC emphasized providing support for Pittsburgh's existing infrastructure, promoting downtown business growth, and augmenting the skyline.[11]

Approximately 2,500 temporary jobs were created in the construction phase of the project. Additionally, 20% of the construction budget went to women and minority-owned contractors.[11]

Workplace Innovator

[edit]

Building interior and workspace design was informed by proprietary research and PNC-specific observations.[11] A key design goal was to make innovative use of building space to promote collaboration and productivity.[10] Two-story neighborhoods throughout the building connect paired office floors and feature varying programs and furnishings to foster different work experiences and encourage employees to move around the building.[12]

Energy Responder

[edit]

The Tower design was motivated by minimizing resource use and maximizing renewable energy opportunities.[11]

Design

[edit]

Gensler worked closely with the Buro Happold engineering team to implement innovative design features in The Tower. Digital design, modeling tools, and full-scale mockups led to building performance successes.[13]

Double-skin façade

[edit]

Heintges provided curtain wall and building envelope consulting services for the project.[14] The Tower features the country's only fully automated double-skin façade that is a part of a solar assisted natural ventilation system.[12] Nearly 250,000 ft2[14] of façade encloses more than 90% of the building.[13] The façade is a window system with laminated glass on the exterior and an insulated glazing unit on the interior with a 30" gap in between them, the cavity provides insulation and helps regulate interior building temperature.[15]

Fresh air enters the cavity through small, automatically programmed,[15] vertical windows called "poppers"[10] on the exterior façade. The interior façade features automated louvers called "floppers"[10] for natural ventilation,[11] there is added individual control features to enhance employee comfort. Employees can open wood-framed sliding glass doors that are part of the interior skin and step out onto the "porch" for fresh air.[16]

The double-skin façade reduces heating and cooling as well as humidifying and de-humidifying energy loads with great reductions in the spring and fall months when the building achieves close to net-zero performance.[11] However, The Tower does have built in temperature and humidity controls to enhance and maintain human comfort year round. Buro Happold analysis shows that these controls still allow for natural ventilation for approximately 42% of working hours.[16]

Solar Chimney

[edit]

The Tower features the largest solar chimney in a modern US building office, it is a 5,000 ft2 glass box angled southwards toward the sun[13] with two vertical shafts within the building.[17]

Prior to constructing the solar chimney, Buro Happold design engineers erected a mockup solar chimney cap on a nearby PNC building rooftop to estimate how much thermal energy the chimney could store. Then, a larger mockup was built to test how the solar chimney would work with a double-skin façade and natural ventilation system.[16]

The chimney works in tandem with the double-skin façade where fresh air is drawn in through the exterior façade into the void space, naturally warms, rises, and exits at the roof skylight without using fan energy.[11] On colder days, the skylight box preheats air before drawing it into the building.[17]

Other Features

[edit]

Workplace Amenities

[edit]

The Tower features several different collaborative environments such as neighborhoods, "living rooms," outdoor terraces, observation decks, a cafeteria with seating for 250+ employees, and an indoor park on the 28th floor of the building.[11]

The indoor park is a five-story-tall sky garden featuring native, seasonal plantings. The temperature is allowed to fluctuate and mirror the outdoor temperatures though there are temperature control features which may be used for special events.[16]

Active Systems

[edit]

A dual-wheel energy recovery system provides humidification or dehumidification and heating or cooling for air before it enters the building,[11] it works in tandem with the double-skin façade. The system was designed to be more efficient by using exhaust air for heating or cooling and humidifying and dehumidifying the air entering the building.[13]

The building features high efficiency condensing boilers and chillers as well as an efficient dual-temperature chilled-water system.[13]

Lighting

[edit]

The building tower is shifted from the podium and the street grid for maximum solar exposure this orientation allows for natural light to reach more than 90% of work areas.[13] Automated controls for blinds activate based on the amount of light entering the building and the amount of glare present.[11] Artificial lighting systems automatically adjust based on natural lighting conditions at employee workstations.[18]

Water Recycling

[edit]

The building will reclaim and treat stormwater in addition to gray and black-water for irrigation, toilet flushing, and cooling tower use producing an estimated 77% reduction in potable water use.[16][13][10]

Black-water sewage treatment and a building-wide recycling program reduce the consumption burden effluent loads on the municipal water systems.[19]

The Beacon

[edit]

The tower features a 30' sculptural installation designed by ESI Design[10] in the lobby. The Beacon visualizes the building's performance using real-time data[11] such as energy use, water consumption,[10] recycling, composting, natural ventilation, and daylighting.[20]

Sustainability & LEED

[edit]

PNC has more newly constructed LEED certified green buildings than any company in the world[15] and was looking to expand its roster by building the Tower at PNC Plaza, the "Greenest Office Tower in the World."[18][11]

Paladino and Company served as the sustainability and green building consultant for the project. Paladino provided LEED New Construction certification services for the project which achieved LEED Platinum certification in fall 2015 by surpassing the requirements.[11][10]

The building design is such that the tower achieves a 50% reduction in energy use overall.[11]

The tower as seen in June 2015, prior to its completion.

References

[edit]
  1. ^ "The Tower at PNC Plaza". Skyscraper Center. CTBUH. Retrieved 2017-07-14.
  2. ^ Tascarella, Patty (June 18, 2014). "PNC Financial Services Group Inc. marking milestone in construction of new headquarters in downtown Pittsburgh, Tower at PNC Plaza expected to be completed in fall 2015". Pittsburgh Business Times. Archived from the original on 2014-07-16.
  3. ^ "The Tower at PNC Plaza". PNC Financial Services Group, Inc. Retrieved May 23, 2011.
  4. ^ "PNC Unveils Plans For New Downtown Pittsburgh Skyscraper". WPXI News. May 24, 2011. Retrieved 2022-03-22.
  5. ^ Belko, Mark (May 23, 2011). "PNC to build new 'eco-friendly' headquarters Downtown". Pittsburgh Post-Gazette. Retrieved May 23, 2011.
  6. ^ Belko, Mark (May 24, 2011). "PNC planning 2012 start on new headquarters tower Downtown". Pittsburgh Post-Gazette.
  7. ^ Welch, Chris (December 22, 2012). "PNC Bank building a 'breathing' skyscraper for its new Pittsburgh headquarters". The Verge.
  8. ^ "PNC Bank building a 'breathing' skyscraper for its new Pittsburgh headquarters". Pittsburgh Business Times. June 18, 2014. Retrieved 2022-03-23.
  9. ^ Belko, Mark (October 1, 2015). "PNC shows off tower, its crown jewel". Pittsburgh Post-Gazette. Retrieved 2015-10-02.
  10. ^ a b c d e f g h i "Building Design and Construction APP January 2016 Page 26". editiondigital.net. Retrieved 2022-12-15.
  11. ^ a b c d e f g h i j k l m n o "The Tower at PNC Plaza". Paladino. 2017-08-03. Archived from the original on Dec 15, 2022. Retrieved 2022-12-15.
  12. ^ a b "The Tower at PNC Plaza | Projects". Gensler. Retrieved 2022-12-15.
  13. ^ a b c d e f g "A Leed Platinum Tower That's the Greenest in the World". Docslib. Retrieved 2022-12-15.
  14. ^ a b "The Tower at PNC Plaza |". Retrieved 2022-12-15.
  15. ^ a b c "The Building That Breathes" (PDF). Vitro Architectural Glass. August 2019.
  16. ^ a b c d e "Continuing Education: Natural Ventilation and Office Towers | 2015-12-01 | Architectural Record". www.architecturalrecord.com. Retrieved 2022-12-15.
  17. ^ a b "The Tower at PNC Plaza". Buro Happold. Retrieved 2022-12-15.
  18. ^ a b content_admin (2016-04-04). "PNC: Building the Greenest Office Tower in the World". Pittsburgh Earth Day. Retrieved 2022-12-15.
  19. ^ Rosenblum, Charles. "PNC's new office tower is green — but just how green?". Pittsburgh City Paper. Retrieved 2022-12-15.
  20. ^ "The Beacon at The Tower at PNC Plaza | NBBJ". www.nbbj.com. Retrieved 2022-12-15.
[edit]
Preceded by Pittsburgh Skyscrapers by Height
545 feet
33 floors
Succeeded by
Preceded by Pittsburgh Skyscrapers by Year of Completion
2015
Succeeded by