Stockport railway station
General information | |||||
---|---|---|---|---|---|
Location | Stockport, Metropolitan Borough of Stockport England | ||||
Grid reference | SJ892898 | ||||
Managed by | Avanti West Coast | ||||
Platforms | 6 (Numbered 0-3, 3a, 4) | ||||
Other information | |||||
Station code | SPT | ||||
Classification | DfT category B | ||||
History | |||||
Original company | Manchester and Birmingham Railway | ||||
Pre-grouping | London and North Western Railway | ||||
Post-grouping | London, Midland and Scottish Railway | ||||
Key dates | |||||
15 February 1843 | Opened as Edgeley | ||||
? | Renamed Stockport Edgeley | ||||
6 May 1968 | Renamed Stockport | ||||
Passengers | |||||
2018/19 | 4.437 million | ||||
Interchange | 0.764 million | ||||
2019/20 | 4.305 million | ||||
Interchange | 0.774 million | ||||
2020/21 | 0.913 million | ||||
Interchange | 0.128 million | ||||
2021/22 | 2.786 million | ||||
Interchange | 0.456 million | ||||
2022/23 | 3.143 million | ||||
Interchange | 0.364 million | ||||
| |||||
|
Stockport railway station serves the large market and industrial town of Stockport in Greater Manchester, England. It is located 6 miles south-east of Manchester Piccadilly, on a spur of the West Coast Main Line to London Euston.
History
[edit]The Manchester and Birmingham Railway opened in stages from Manchester and reached Stockport in 1840. The 5+1⁄2-mile (9 km) line ran from a temporary station in Manchester to another in Stockport at the north end of the uncompleted Stockport Viaduct. The temporary station, which was later renamed Heaton Norris, was Stockport's only station for more than two years.[1] After the viaduct was completed, the M&BR built a station at its southern end as an experiment. The decision was prompted by complaints that the first station was a long way from the industrial parts of town and even farther from the residential districts on the south side. The second station opened on 15 February 1843 as Edgeley. By 1844, it was the town's principal station. Heaton Norris, at the north end of the viaduct, closed in 1959.[1]
The station was operated by the London and North Western Railway and became part of the London Midland and Scottish Railway in 1923. In 1948, British Railways ran the system.
Most lines into the station were electrified at 25 kV AC, using overhead wires, under the British Railways 1955 Modernisation Plan; however, not all of the local lines were electrified.
Facilities
[edit]The station is positioned at high level above the valley of the River Mersey and with lifts that link a pedestrian underpass to central Stockport and Edgeley.
The station is staffed, has a ticket office and ticket machines, customer service points, shops, toilets, waiting rooms, lifts from the station subway and step-free access to the platforms.[2][3]
In 2009, the station was identified as one of the ten worst category B interchange stations for mystery shopper assessment of fabric and environment and received a share of £50m funding for improvements.[4]
Services
[edit]Current passenger routes
[edit]Trains running north-west serve Manchester Piccadilly; some continue on to Manchester Oxford Road and beyond to Liverpool Lime Street via Warrington Central. There are no longer regular services from here to Bolton and points north (passengers should change at Piccadilly or Manchester Oxford Road).
South-east from Stockport, express services run to Sheffield and onwards to Cleethorpes, Nottingham and Norwich with local services running to Hazel Grove and Buxton.
The two southbound West Coast Main Line routes run via Cheadle Hulme. One continues via Macclesfield and Stoke-on-Trent to Birmingham New Street and London; the other via Wilmslow and Crewe for through services to London and Birmingham and via Shrewsbury and the Welsh Marches line to Cardiff, Carmarthen, Pembroke Dock and Milford Haven. Trains to Birmingham via Stoke-on-Trent continue to destinations in the south of England such as Bournemouth via Reading, and Bristol Temple Meads.
The Mid-Cheshire Line runs hourly westbound through Altrincham, Knutsford, Northwich to Chester.
The Stockport to Stalybridge Line, via Guide Bridge, no longer has a regular passenger service. It was reduced from an hourly shuttle service to a once a week, one direction only skeleton service in the early 1990s. It now has two services a week, one in each direction on Saturday mornings.
The main concourse opened in September 2004 in a development that included a new platform (platform 0) that only became fully operational at the beginning of March 2008. A pedestrian subway leads to the island platforms, which have a buffet and newsagent.
The Monday–Saturday off-peak service pattern in trains per hour (tph) is:
- 3 tph to Manchester Piccadilly
- 3 tph to London Euston:
- 1 tph calling at Macclesfield, Stoke-on-Trent, Rugby and Milton Keynes Central
- 1 tph calling at Stoke-on-Trent and Nuneaton
- 1 tph calling at Wilmslow, Crewe and Stafford[5]
- 2 tph to Manchester Piccadilly
- 1 tph to Bournemouth via Macclesfield, Birmingham New Street and Reading
- 1 tph to Bristol Temple Meads via Macclesfield and Birmingham New Street
- 2tpd extend from Bristol T.M. to Paignton via Exeter St Davids.[6]
- 1 tph to Liverpool Lime Street via Warrington Central
- 1 tph to Norwich via Sheffield and Nottingham[7]
- 1 tph to Cleethorpes
- 1 tph to Liverpool Lime Street via Warrington Central[8]
- 1 tph to Manchester Piccadilly
- 1 tph to Carmarthen/Milford Haven via Shrewsbury and Cardiff Central[9]
- 6 tph to Manchester Piccadilly
- 1 tph to Alderley Edge
- 1 tph to Crewe[10]
- 1 tph to Hazel Grove
- 1 tph to Buxton
- 1 tph to Chester
- 1 tph to Stoke-on-Trent[11]
- 1 train per week on Saturday to Stalybridge, via Reddish South, Denton and Guide Bridge.[12]
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Avanti West Coast | ||||
Transport for Wales Rail | ||||
CrossCountry | ||||
East Midlands Railway | ||||
Limited service |
||||
Limited service |
||||
Limited service |
||||
TransPennine Express | ||||
Limited service |
||||
Northern Trains | ||||
Northern Trains | ||||
Northern Trains | ||||
Northern Trains | ||||
Northern Trains Limited service | ||||
Terminus | Northern Trains Saturdays only | |||
Previous services | ||||
CrossCountry Peak Hours Only Monday-Saturday Only |
Platform use
[edit]Platform 0 — Typically services to Hazel Grove, Buxton, Sheffield, Norwich, Nottingham and Cleethorpes (opened in 2003).
Platform 1 — southbound services to Macclesfield, Crewe, Stoke-on-Trent and Alderley Edge. It is also signalled for use by trains in the Manchester direction.
Platform 2 — southbound platform for services to Stoke-on-Trent, Chester, Crewe, Alderley Edge, services to South Wales, London, Bristol, Bournemouth, Paignton and Plymouth.
Platform 3 — mainly used by Fast services to Manchester Piccadilly along with services to Manchester Airport, Liverpool Lime Street, Blackpool North, Preston, Salford Crescent, Bolton, Wigan, Southport and Barrow-in-Furness.
Platform 3a — used by the weekly parliamentary train from / to Stalybridge.
Platform 4 — mainly used by stopping services to Manchester Piccadilly along with services to Manchester Airport, Liverpool Lime Street, Blackpool North, Preston, Salford Crescent, Bolton, Wigan, Southport and Barrow-in-Furness.
Non-stopping trains
[edit]It has been claimed that Stockport viaduct was built on condition that all passenger trains using it were required to stop at Stockport station.[13][14][15] Local MP Andrew Gwynne commissioned research into the issue and reported "Sadly no such Act of Parliament exists, although it is common currency in the town that it does. I made enquiries with the House of Commons Library and the Parliamentary Archives back at the time some intercity trains stopped using Stockport. It appears it is purely an urban myth."[16]
Interchange with other transport modes
[edit]Taxi
[edit]Passengers can board taxis from the taxi rank located immediately outside the station entrance.[17]
Bus
[edit]The bus stops immediately outside the station were previously served by the Metroshuttle free bus service. This service was withdrawn in 2019,[18] and as of 2020 the bus stops were only used by the infrequent service number 312[19] and occasionally by rail replacement buses.
The station is a short walk from the former Stockport bus station, where most services could be accessed until its closure in August 2021.[20] Transport for Greater Manchester's Stockport Interchange, constructed on the site of the demolished bus station,[21] opened for passengers on 17 March 2024.[22] A bridge to improve the walking route between the two facilities was built as part of the development.[23]
Passengers can also use the bus stops on the nearby Wellington Road which are well-served by services, especially the 192 between Manchester Piccadilly and Hazel Grove, that are mostly operated by Stagecoach Manchester.
Tram
[edit]Stockport Interchange | |||||
---|---|---|---|---|---|
Metrolink station | |||||
General information | |||||
Location | Stockport, Stockport England | ||||
Coordinates | 53°24′18″N 2°09′46″W / 53.405°N 2.1628°W | ||||
Other information | |||||
Status | Proposed station | ||||
|
An extension to the Metrolink line from East Didsbury to Stockport was planned in 2004 and the Greater Manchester Passenger Transport Executive applied for powers to build it. The project came to a halt when the Big Bang extension was stopped due to the loss of potential funding.[24] As a result, there is currently no tram interchange at Stockport station.
The proposed extension would have reused some of the former railway alignment, but some of it was built on or filled in after closure. This made re-opening more difficult and the proposed line would have included new infrastructure and street running sections to take it into Stockport. The line would have terminated at Stockport bus station.[24]
See also
[edit]References
[edit]- ^ a b Holt, Geoffrey O (1978). A Regional History of the Railways of Great Britain. Vol. 10: North West. David & Charles. pp. 117–119. ISBN 0715375210.
- ^ National Rail Enquiries - Station facilities for Stockport Accessed 2014-06-03
- ^ Stockport Station Plan Accessed 2014-06-03
- ^ "£50m revamp for 'worst stations'". BBC News. 17 November 2009. Retrieved 17 November 2009.
- ^ Table 65 National Rail timetable, May 2023
- ^ "Train Timetables | Scotland, North East & Manchester to the South West and South Coast | Sunday 10 December 2023 – Saturday 01 June 2024" (PDF). CrossCountry Trains. Retrieved 19 December 2023.
- ^ Table 53 National Rail timetable, May 2023
- ^ Table 21 National Rail timetable, May 2023
- ^ Table 131 National Rail timetable, December 2022
- ^ "N18 - Manchester to Crewe via Stockport and via Manchester Airport | Train times | 10 December 2023 to 1 June 2024" (PDF). Northern Trains. Retrieved 19 December 2023.
- ^ "N19 - Manchester to Stoke-on-Trent via Macclesfield | Train times | 10 December 2023 to 1 June 2024" (PDF). Northern Trains. Retrieved 19 December 2023.
- ^ "Timetable | 097 Manchester to Guide Bridge, Glossop and Hadfield (including Stockport to Stalybridge)" (PDF). Network Rail.
- ^ Andrew Macfarlane, ed. (1989). "Manchester–Buxton". Peaks and Plains by Rail. Railway Development Society. Norwich: Jarrold Colour Publications. p. 19. ISBN 0-7117-0429-5.
- ^ "Concern over proposed train cuts". BBC News. 5 December 2007. Retrieved 9 March 2008.
- ^ "Register your viaduct vote online for trains to stop". Stockport Express News Website. Manchester Evening News. 26 March 2008. Archived from the original on 25 March 2008. Retrieved 26 March 2008.
- ^ Gwynne, Andrew (17 November 202). "Rail services to London via Stockport to be retained – MP". Archived from the original on 15 January 2013. Retrieved 23 March 2014.
- ^ "National Rail Enquiries - Station facilities for Stockport". www.nationalrail.co.uk. Retrieved 9 June 2021.
- ^ "Stockport Metroshuttle is axed". www.keybuses.com. 17 January 2019. Retrieved 9 June 2021.
- ^ "Stockport - Handforth Dean via Cheadle timetable" (PDF). Diamond Buses. 2020.
- ^ Davies, Ethan (20 August 2021). "Stockport bus station closes this weekend to make way for new £120m interchange". Manchester Evening News. Retrieved 6 February 2024.
- ^ Slater, Chris (1 February 2024). "Incredible footage shows Stockport's skyline changing before our eyes". Manchester Evening News. Retrieved 6 February 2024.
- ^ Slater, Chris (16 February 2024). "Opening date for Stockport's new £135m transport interchange and rooftop park confirmed". Manchester Evening News. Retrieved 17 March 2024.
- ^ "Stockport interchange". Transport for Greater Manchester. Retrieved 9 June 2021.
- ^ a b "Metrolink, East Didsbury to Stockport". Light Rail Transit Association. Archived from the original on 29 December 2015. Retrieved 27 January 2016.
Further reading
[edit]- Mitchell, Vic; Smith, Keith (2014). Crewe to Manchester. Middleton Press. figs. 78-88. ISBN 9781908174574. OCLC 892047119.
External links
[edit]- Train times and station information for Stockport railway station from National Rail
- Railway stations in the Metropolitan Borough of Stockport
- DfT Category B stations
- Former London and North Western Railway stations
- Railway stations in Great Britain opened in 1843
- Railway stations served by CrossCountry
- Railway stations served by East Midlands Railway
- Railway stations served by Northern
- Railway stations served by TransPennine Express
- Railway stations served by Transport for Wales Rail
- Railway stations served by Avanti West Coast
- 1843 establishments in England
- Proposed Manchester Metrolink tram stops
- Stations on the West Coast Main Line
- Transport in Stockport