Jump to content

F3 (Istanbul funicular)

Coordinates: 41°03′42″N 28°35′34″E / 41.0618°N 28.5928°E / 41.0618; 28.5928
From Wikipedia, the free encyclopedia
(Redirected from F3 (Istanbul Metro))
F3 Vadistanbul–Seyrantepe
Overview
StatusOperating
OwnerVadistanbul[1][failed verification]
LocaleIstanbul, Turkey
Termini
Stations2
Service
TypeFunicular
SystemIstanbul Metro
Route numberF3
Operator(s)Vadistanbul[citation needed]
History
Opened29 October 2017; 7 years ago (2017-10-29)
Technical
Line length0.75 km (0.47 mi)
Number of tracks1
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

Line F3
Vadistanbul
Seyrantepe Line M2

The F3, also known as the Vadistanbul Monorail (Turkish: Vadistanbul Havaray, meaning Vadistanbul Air-rail) and officially referred to as the F3 Vadistanbul-Seyrantepe funicular line (Turkish: F3 Vadistanbul-Seyrantepe füniküler hattı), is a 750 m (2,460 ft) long funicular railway in Sarıyer, Istanbul.[2] The line is one of four funicular railways in Turkey, all of them in Istanbul, and is the only one that operates above ground. Due to the fact that the F3 runs along a concrete viaduct, it has been advertised as a Monorail even though it is technically a funicular railway. The route runs between Vadistanbul and Seyrantepe, where connection to the M2 line is available.[citation needed]

The F3 was opened on 29 October 2017.[citation needed]

Overview

[edit]
Seyrantepe entrance

The F3 route runs in southern Sarıyer, just west of Maslak. The large majority of the route is elevated with a concrete viaduct and consists of two stations. The northwest terminus of the F3, Vadistanbul station, is located within a glass Spheroid structure that connects to the 2nd floor of the Vadistanbul Shopping Center.[3] The southeast terminus, Seyrantepe station, is located underground on the northern side of the O-2 expressway. A tunnel underneath the expressway connects to the M2 station.[4] The route is mostly single track, except for a short 147 m (482 ft) long double-track section in the middle allowing trains to pass one another. The total construction cost of the line was 15 million.[4]

Line

[edit]
No Station District Transfer Type Notes
1 Seyrantepe Sarıyer Line M2 (Seyrantepe)
İETT Bus: 27SE, 41SM, 41ST, 62H, 65A
Viaduct Rams Park
2 Vadistanbul İETT Bus: 41Y, 47L, 50D, 62H Vadistanbul Shopping Center

References

[edit]
  1. ^ "Vadistanbul Mall".
  2. ^ "Vadistanbul havaray hattı Mart 2017 de hizmete giriyor". rayhaber.com (in Turkish). 6 December 2016. Retrieved 4 January 2018.
  3. ^ "Vadistanbul Havaray projesi geliyor!". emlakkulisi.com (in Turkish). 21 August 2015. Retrieved 4 January 2018.
  4. ^ a b "Vadistanbul Havaray hattı açılıyor!". emlakkulisi.com (in Turkish). 14 September 2017. Retrieved 4 January 2018.


41°03′42″N 28°35′34″E / 41.0618°N 28.5928°E / 41.0618; 28.5928