User:MSG17/8+8
Appearance
Eight vertical (north-south) HSR corridors and constituent lines
Coastal corridor (沿海通道) - 200–350 km/h - ? km
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Coastal corridor |
Extensions of Hangzhou–Fuzhou–Shenzhen High-Speed Railway; north from Hangzhou to Dalian/Dandong, and south from Shenzhen to Fangchenggang. | 200-350 | 1700 | 1998 | 2022 |
Beijing–Shenyang (Jingshen High-Speed Railway) |
HSR from Beijing to Shenyang via Chengde, Fuxin and Chaoyang (Line operational from Chengde to Shenyang; final section from Beijing to Chengde expect to be completed by 2020.) |
350 | 684 | 2014-02-28[1] | 2018-12-29 (Chengde South–Shenyang section) 2020 (Xinghuo–Chengde South section) |
Harbin–Dalian (Hada HSR) |
HSR from Harbin to Dalian via Shenyang & Changchun | 350 | 904 | 2007-08-23 | 2012-12-01[2] |
Panjin–Yingkou (Panying HSR) |
Connects Yingkou on Harbin–Dalian HSR with Panjin on Qinhuangdao-Shenyang HSR | 350 | 89 | 2009-05-31 | 2013-09-12[3] |
Beijing–Shanghai corridor - 350 km/h - 1,433 km
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Beijing–Shanghai (Jinghu corridor) |
HSR Corridor of East China | 350 | 1433 | 2008-01-08 | 2012-10-16 |
Beijing–Shanghai (Jinghu HSR) |
HSR from Beijing to Shanghai via Tianjin, Jinan, Xuzhou, Bengbu and Nanjing | 350 | 1302 | 2008-04-18 | 2011-06-30[4] |
Hefei–Bengbu (Hebeng HSR) |
Spur off Jinghu HSR from Bengbu to Hefei | 350 | 131 | 2008-01-08 | 2012-10-16[5] |
Beijing–Guangzhou–Shenzhen–Hong Kong High-Speed Railway - 350 km/h - 2,229 km
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Beijing–Guangzhou–Shenzhen–Hong Kong (Jingguangshengang HSR) |
HSR Corridor connecting North with South Central China | 350 | 2229 | 2005-09-01 | 2018-09-23 |
Beijing–Shijiazhuang (Jingshi HSR) |
HSR from Beijing to Shijiazhuang | 350 | 281 | 2008-10-08 | 2012-12-26[6] |
Shijiazhuang–Wuhan (Shiwu HSR) |
HSR from Shijiazhuang to Zhengzhou | 350 | 838 | 2008-10-15 | 2012-12-26[6] |
HSR from Zhengzhou to Wuhan | 2012-09-28[7] | ||||
Wuhan–Guangzhou (Wuguang HSR) |
HSR from Wuhan to Guangzhou via Changsha | 350 | 968 | 2005-09-01 | 2009-12-26 2010-01-30[8] |
Guangzhou–Shenzhen (Guangshengang XRL) |
Mainland section of the Express Rail Link. HSR from Guangzhou to Shenzhen North Railway Station. | 350 | 116 | 2008-08-20 | 2011-12-26[9] |
Mainland section of the Express Rail Link. HSR from Shenzhen North to the border of Hong Kong. | 2015-12-30[10] | ||||
Shenzhen–Hong Kong (Guangshengang XRL) |
Hong Kong section of the Express Rail Link. HSR from the border of Shenzhen to Hong Kong. | 200 | 26 | 2010 | 2018-09-23[11][12] |
Hangzhou–Fuzhou–Shenzhen High-Speed Railway - 350–250 km/h - 1,495 km
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Hangzhou–Fuzhou–Shenzhen (Hangfushen PDL) |
PDL from Hangzhou to Shenzhen, with plans for a rail bridge across the Hangzhou Bay by 2020.[13] | 250- 350 |
1450 | 2005-08-01 | 2013-12-28 |
Hangzhou–Ningbo (Hangyong PDL) |
HSR from Hangzhou to Ningbo | 350 | 152 | 2009-04 | 2013-07-01[14] |
Ningbo–Taizhou–Wenzhou (Yongtaiwen PFL) |
Mixed passenger & freight HSR line along the coast of Zhejiang Province from Ningbo to Wenzhou via Taizhou. | 250 | 268 | 2005-10-27 | 2009-09-28 |
Wenzhou–Fuzhou (Wenfu PFL) |
Mixed passenger & freight HSR line from Wenzhou to Fuzhou. | 250 | 298 | 2005-01-08 | 2009-09-28 |
Fuzhou–Xiamen (Fuxia PFL) |
Mixed passenger & freight HSR line along the coast of Fujian Province from Fuzhou to Xiamen via Putian & Quanzhou. | 250 | 275 | 2005-10-01 | 2010-04-26 |
Xiamen–Shenzhen (Xiashen PFL) |
Mixed passenger & freight HSR line along the coast of Fujian and Guangdong from Xiamen to Shenzhen via Zhangzhou, Shantou & Huizhou. | 250 | 502 | 2007-11-23 | 2013-12-28[15] |
Eight horizontal (east-west) HSR corridors and constituent lines
Qingdao–Taiyuan High-Speed Railway - 250 km/h - 873 km
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Qingdao–Taiyuan (Qingtai PDL) |
PDL of North China consisting of three segments connecting Taiyuan, Shijiazhuang, Jinan and Qingdao. | 250- 350 |
817 | 2005-06-01 | 2018-12-26 |
Qingdao–Jinan Passenger Railway (Jiaoji PDL) |
PDL connecting Qingdao and Jinan | 250 | 364 | 2007-01-28 | 2008-12-20 |
Jinan–Shijiazhuang (Shijiazhuang–Jinan High-Speed Railway) |
PDL connecting Shijiazhuang & Jinan via Dezhou | 250 | 319 | 2014-03-16[16] | 2017-12-28 |
Shijiazhuang–Taiyuan (Shijiazhuang–Taiyuan High-Speed Railway) |
PDL connecting Shijiazhuang & Taiyuan. | 250 | 190 | 2005-06-11 | 2009-04-01 |
Xuzhou–Lanzhou High-Speed Railway - 350 km/h - 1,363 km
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Xuzhou–Lanzhou (Xulan High-Speed Railway) |
HSR Corridor across the Yellow River Valley of central China, consisting of four segments connecting Xuzhou, Zhengzhou, Xian, Baoji and Lanzhou. | 350 | 1363 | 2005-06-01 | 2017-07-09 |
Xuzhou–Zhengzhou (Zhengzhou–Xuzhou High-Speed Railway) |
HSR connecting Xuzhou & Zhengzhou | 350 | 357 | 2012-12-26[17] | 2016-09-10 |
Zhengzhou–Xi'an (Zhengzhou–Xi'an High-Speed Railway) |
HSR connecting Zhengzhou & Xian | 350 | 455 | 2005-09-01 | 2010-02-06 |
Xi'an–Baoji (Xi'an–Baoji High-Speed Railway) |
HSR connecting Xi'an & Baoji | 350 | 148 | 2009-11-22 | 2013-12-28[18] |
Baoji–Lanzhou (Baoji–Lanzhou High-Speed Railway) |
HSR connecting Baoji & Lanzhou | 350 | 403 | 2012-10[19][20][21] | 2017-07-09[22] |
Shanghai–Wuhan–Chengdu High-Speed Railway - 350–200 km/h - 2,078 km
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Shanghai–Wuhan–Chengdu (Huhanrong PDL) |
PDL through the Yangtze Valley, consisting of the Shanghai-Nanjing section of the Beijing–Shanghai HSR, and 7 mixed-use HSR segments connecting Nanjing, Hefei, Wuhan, Yichang, Lichuan, Chongqing, Suining & Chengdu. | 350- 200 |
2078 | 2003-12-01 | 2014-7-1 |
Shanghai–Nanjing |
shares track with Shanghai-Nanjing section of Beijing-Shanghai HSR | 350 | 301 | 2008-07-01 | 2010-07-01 |
Nanjing–Hefei (Hening PFL) |
Mixed passenger & freight HSR connecting Nanjing & Hefei | 350 | 166 | 2005-06-11 | 2008-04-19 |
Hefei–Wuhan (Hewu PFL) |
Mixed passenger & freight HSR connecting Hefei & Wuhan | 350 | 351 | 2005-08-01 | 2009-04-01 |
Hankou (Wuhan)–Yichang (Hanyi R.R.) |
Mixed passenger & freight HSR connecting Wuhan & Yichang | 250 | 293 | 2008-09-17 | 2012-07-01 |
Yichang–Wanzhou (Yichang–Lichuan section of Yiwan R.R.) |
Mixed passenger & freight HSR connecting Yichang & Lichuan[23] | 200 | 377 | 2003-12-01 | 2014-7-1 |
Lichuan–Chongqing (Yuli R.R.) |
Mixed passenger & freight HSR connecting Lichuan & Chongqing | 200 | 264 | 2008-12-29 | 2013-12-28[18] |
Chongqing–Suining (Suiyu R.R.) |
Mixed passenger & freight HSR connecting Chongqing & Suining | 200 | 132 | 2009-01-18 | 2012-12-31 |
Dazhou–Chengdu (Suining–Chengdu section of Dacheng R.R.) |
Mixed passenger & freight HSR connecting Suining & Chengdu. | 200 | 148 | 2005-05 | 2009-06-30 |
Shanghai–Kunming High-Speed Railway - 350 km/h - 2,066 km
Line [corridor map] |
Route Description | Designed Speed (km/h) |
Length (km) |
Construction Start Date |
Open Date |
---|---|---|---|---|---|
Shanghai–Kunming (Hukun HSR) |
HSR Corridor connecting East, Central and Southwest China. It consists of three sections connecting Shanghai, Hangzhou, Changsha and Kunming. | 350 | 2066 | 2008-12-28 | 2016-12-28 |
Shanghai–Hangzhou (Shanghai–Hangzhou High-Speed Railway) |
HSR connecting Shanghai Hongqiao & Hangzhou East. | 350 | 150 | 2009-02-26 | 2010-10-26 |
Hangzhou–Changsha (Hangzhou–Changsha High-Speed Railway) |
HSR from Hangzhou to Nanchang | 350 | 582 | 2010-07-01 | 2014-12-10[24][25] |
HSR from Nanchang to Changsha | 344 | 2009-02-26 | 2014-09-16[26] | ||
Changsha–Kunming (Changsha–Kunming High-Speed Railway) |
HSR from Changsha to Guiyang | 350 | 702 | 2010-03-26 | 2015-6-18[27] |
HSR from Guiyang to Kunming | 473 | 2016-12-28[28] |
- ^ "Work starts on Beijing-Shenyang high-speed railway". People's Daily Online. 2014-03-03. Retrieved 2014-04-17.
- ^ "World's fastest railway in frigid regions starts operation". English.news.cn. 2012-12-01. Retrieved 2012-12-01.
- ^ "盘锦至营口高速铁路运营 大连到北京6小时". 人民网. 2013-09-12. Retrieved 2013-09-18.
- ^ Zha, Minjie (2011-06-23). "Beijing-Shanghai high speed rail to be launched June 30". Shanghai Daily. Retrieved 2011-06-25.
- ^ "China launches new high-speed railway". People's Daily Online. 2012-10-17. Retrieved 2012-11-02.
- ^ a b "Beijing - Guangzhou high speed line completed". Railway Gazette. 2012-12-26. Retrieved 2012-12-28.
- ^ "New high-speed railway spurs debate over prices". People's Daily Online. 2012-09-27. Retrieved 2012-09-27.
- ^ "Guangzhou south railway station to open on Jan. 30". Newsgd.com. 2010-01-05. Retrieved 2013-10-08.
- ^ Lu, Yanan; Zeng, Yong (2011-12-26). "Guangzhou-Shenzhen high-speed railway opens". People's Daily Online. Retrieved 2011-12-26.
- ^ "Asia's largest underground railway station opens for business". SmartRail World. 2016-01-05. Retrieved 2016-01-29.
- ^ "Guangzhou-Shenzhen-Hong Kong Express Rail Link Opens To Public". Headlines Today. Retrieved 23 September 2018.
- ^ "Luggage and ticket confusion as Hong Kong's high-speed rail service to mainland China opens". South China Morning Post. 2018-09-23. Retrieved 2018-09-23.
- ^ "Railway Bridge to Cross Hangzhou Bay". HighBeam Business. Archived from the original on 2012-08-09.
- ^ "New high-speed railways open to promote intercity development". Xinhua. 2013-07-01. Retrieved 2013-07-02.
- ^ "Xiamen-Shenzhen High Speed Railway opens to traffic". China Daily. 2013-12-28. Retrieved 2013-12-29.
- ^ "石家庄至济南铁路客运专线正式开工建设". 央广网新闻. 2014-03-17. Retrieved 2013-07-09.
- ^ "郑徐高铁"超计划"动工 郑州将成"米"型高铁枢纽". 中国新闻网. 2012-12-26. Retrieved 2012-12-31.
- ^ a b "China's railways mileage tops 100,000 km". People's Daily. 2013-12-28. Retrieved 2013-12-29.
- ^ 宝鸡至兰州铁路客运专线建设项目启动, Xinhua, 2012-10-21
- ^ 宝鸡至兰州客运专线陕西段工程开工建设, 2012-10-21
- ^ 宝鸡至兰州的客运专线昨天在榆中奠基, 2012-10-27
- ^ "China's Baoji-Lanzhou high speed rail now in operation". CGTN. 2017-07-09. Retrieved 2017-07-09.
- ^ "Yiwan Railway: a project with 253 bridges and 159 tunnels". Xinhua. 2010-12-23. Archived from the original on 2011-01-03. Retrieved 2010-12-23.
- ^ "杭长铁路客运专线浙江段电气化接触网全线贯通". Xinhua. 2014-05-29. Archived from the original on 2014-09-04. Retrieved 2014-09-04.
- ^ (Chinese) "沪昆高铁南昌至杭州段正式开通运营" Xinhua Archived 2016-01-19 at the Wayback Machine 2014-12-10
- ^ "Nanchang-Changsha high speed railway starts operation". People's Daily Online. 2014-09-16. Retrieved 2014-09-16.
- ^ "沪昆高铁长怀段12月16日通车 邵阳北站各项准备工作完成". 人民网. 2015-06-18. Retrieved 2015-06-18.
- ^ "Shanghai-Kunming line section starts operation". China.org.cn. Retrieved December 28, 2016.