Jump to content

Shibchar railway station

Coordinates: 23°23′11″N 90°07′48″E / 23.386328°N 90.130117°E / 23.386328; 90.130117
From Wikipedia, the free encyclopedia
Shibchar Railway Station

শিবচর রেলওয়ে স্টেশন
General information
LocationShibchar Upazila, Madaripur District
Bangladesh
Coordinates23°23′11″N 90°07′48″E / 23.386328°N 90.130117°E / 23.386328; 90.130117
Owned byBangladesh Railway
Line(s)Dhaka–Jessore line
Platforms2
Tracks3
Construction
Structure typeStandard (on ground station)
ParkingYes
Bicycle facilitiesYes
AccessibleYes
Other information
StatusOpened
Station codeSHBCR
Zone(s) East Zone
Division(s) Dhaka
History
Opened10 October 2023 (2023-10-10)
Services
Preceding station Bangladesh Railway Following station
Padma
towards Kamalapur
Dhaka–Jessore Bhanga Junction
Route map
Map
Location
Map

Shibchar railway station is a railway station located in Shibchar upazila of Madaripur district. This is the only station in Madaripur district. This railway station is on the Dhaka–Jessore line. This station was formally opened on 10 October 2023.[1][2][3][4]

History

[edit]

Ministry of Railways decided to build the new 172 km railway line to connect Jashore with Dhaka via Padma Bridge. It was a link project of Padma Bridge. Under this project 14 new stations were built and 6 stations were repaired. In 2023, the government decided to open this railway line partially from Dhaka to Bhanga. Shibchar railway station was open for the public to that time.[5][6]

References

[edit]
  1. ^ "ভাঙ্গা থেকে মাওয়া ট্রেন আগামী বছরেই | Deshebideshe". 2020-02-25. Archived from the original on 25 February 2020. Retrieved 2024-12-04.
  2. ^ "Shibchar Railway Station Map/Atlas BR/Bangladesh Zone - Railway Enquiry". indiarailinfo.com. Retrieved 2024-12-04.
  3. ^ "অপেক্ষার পালা শেষ, এবার ট্রেনে পদ্মা পাড়ি". Bangla Tribune (in Bengali). Retrieved 2024-12-04.
  4. ^ প্রতিবেদক, নিজস্ব (2022-10-24). "২০২৩ সালের জুনে ঢাকা থেকে ভাঙ্গা পর্যন্ত ট্রেন চলবে: রেলমন্ত্রী". Prothomalo (in Bengali). Retrieved 2024-12-04.
  5. ^ "পদ্মা সেতুতে রেল সংযোগ প্রকল্প তত্ত্বাবধানে সেনাবাহিনী". DailyInqilabOnline. Retrieved 2024-12-04.
  6. ^ "Work on Tk 25,960 cr Dhaka-Faridpur railway starts soon". 2022-11-09. Archived from the original on 9 November 2022. Retrieved 2024-12-04.