Jump to content

Shanghai Metro AC05

From Wikipedia, the free encyclopedia
Shanghai Metro 04A01
AC05
04A01 depating from West Yan'an Road station in 2024
Stock typeClass A EMU
In service31 December 2005-present
ManufacturerSiemens Mobility and CSR Zhuzhou Locomotive
Built atVienna, Austria
Zhuzhou, China
Constructed2004-2007
Entered service31 December 2005
Number built168
Number in service168
FormationTc-Mp-M+M-Mp-Tc
Fleet numbers040011-041681
Capacity310 per car
OperatorsShentong Metro Group
DepotsPuhuitang Depot
North Jiangyang Road Depot
Shilong Road Yard
Lines served 3   4 
Specifications
Car body constructionAluminum alloy
Train length139.98 m (459 ft 3 in)
Car length23.54 m (77 ft 3 in)
Width3 m (9 ft 10 in)
Height3.8 m (12 ft 6 in)
DoorsElectric doors
Maximum speed80 km/h (50 mph)
Traction systemSiemens Mobility G1500 D1100/400 M5-1 IGBT-VVVF
Traction motorsSiemens Mobility 1TB2010-1GA02 3-phases AC induction motors
AccelerationMaximum 3.6 km/(h⋅s) (2.237 mph/s)
Deceleration3.6 km/(h⋅s) (2.237 mph/s) (service)
4.7 km/(h⋅s) (2.920 mph/s) (emergency)
Electric system(s)1,500 V DC
Current collector(s)Single-arm Pantograph
BogiesSiemens Mobility SF2100[1]
Track gauge4 ft 8+12 in (1,435 mm)

 The 04A01 train (formerly known as AC05) is a current rolling stock used on Line 4 of Shanghai Metro. They are developed by Siemens Mobility and built by CSR Zhuzhou Locomotive. AC05s entered service on 31 December 2005.

Between July 2006 and September 2009, eight AC05 trains were temporarily assigned to Line 2 service, due to the shortage of AC02 trains, the delayed delivery of AC08 trains and the opening of Line 2 extension.[2] In 2014, AC05 trains renamed 04A01 trains.[3]

Overview

[edit]

The AC05 trains have livery in purple and white, with the number "4" on every car, to help passengers distinguish the AC03 trains at Line 3 section.

In March 2002, Siemens Mobility and CSR Zhuzhou Locomotive awarded the contract to build AC05 trains for the Pearl line Phase 2 project. The first train built by CSR Zhuzhou Locomotive was completed on 18 December 2004.[4][5]

Signalling upgrade

[edit]

Between 2023 and 2025, all 04A01s were modified by Shentong Metro. Trains' signalling system were upgraded from ATO to DTO (TACS) and every car's indicators were increased from two to four. 04A01s' have also received new LCD screen displays. The LED display's color was changed from orange to red.[6]

See also

[edit]

References

[edit]
  1. ^ "First Class Bogies" (PDF). Siemens Mobility. Archived from the original (PDF) on 2019-07-22.
  2. ^ 地铁万象 (2020-06-12). "二十年,Ta载着你有过多少故事?上海地铁2号线20周年生日特刊" (in Chinese).
  3. ^ 申通南车(上海)轨道交通车辆维修有限公司 (2015-04-27). "轨道交通4号线04A01(原AC05)型28列电动列车大修项目列车牵引、辅逆箱体大修项目单一来源公示". Archived from the original on 2017-01-07. Retrieved 2017-01-07.
  4. ^ 新华网 (2004-12-18). "上海明珠线二期工程首列国产地铁车辆竣工下线". 搜狐新闻.
  5. ^ Siemens Transportation Systems (2012-06-21). "Shanghai-Metro Production in Vienna".
  6. ^ 中国城市轨道交通协会 (2023-09-13). ""城轨信号系统升级改造技术交流会"PPT分享——上海申通地铁集团有限公司副总工程师张郁《上海地铁信号系统更新改造策略研究》". Archived from the original on 2024-05-12. Retrieved 2024-05-12.