Jump to content

Ragigudda metro station

Coordinates: 12°55′02″N 77°35′18″E / 12.91711°N 77.58837°E / 12.91711; 77.58837
From Wikipedia, the free encyclopedia

Ragigudda
Namma Metro station
Final stages of this metro station under Namma Metro
General information
Location45th Cross, Marenahalli, 5th Block, Jayanagar, Bengaluru, Karnataka 560041
Coordinates12°55′02″N 77°35′18″E / 12.91711°N 77.58837°E / 12.91711; 77.58837
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusFinal Stages before Operations
Station code(TBC)
History
Opening25 January 2025; 58 days' time (25 January 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Rashtreeya Vidyalaya Road
Terminus
Yellow Line
(Operational around January 2025)
Jayadeva Hospital
towards Bommasandra
Location
Map

Ragigudda is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. Located in between Jayanagar 9th Block & J.P. Nagar 2nd Phase, this metro station is named after the Ragigudda Anjaneya Temple.

As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[1] due to lots of trial runs along with more trainsets which are needed for commencement of operations.[2][3][4][5][6]

History

[edit]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Ragigudda metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[7] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

[edit]

Station Layout (TBC)

Ragigudda track layout (TBC)
P1
P2
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra
Next Station: Jayadeva Hospital
Change at the next station for Pink Line
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Change at the next station for Green Line
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

[edit]

See also

[edit]

References

[edit]
  1. ^ "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
  2. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  3. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  4. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  5. ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
  6. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
  7. ^ "HCC-URC JV Lowest Bidder for Bangalore Metro's RV Rd - HSR Layout". The Metro Rail Guy. 16 May 2017. Retrieved 23 October 2024.
[edit]