Jump to content

Nallurhalli metro station

Coordinates: 12°58′36″N 77°43′29″E / 12.976528°N 77.724763°E / 12.976528; 77.724763
From Wikipedia, the free encyclopedia

Nallurhalli
Namma Metro station
Nallurhalli metro station
General information
LocationVijaynagar, KIADB Export Promotion Industrial Area, Whitefield, Bengaluru, Karnataka 560066
Coordinates12°58′36″N 77°43′29″E / 12.976528°N 77.724763°E / 12.976528; 77.724763
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Purple Line
PlatformsSide platform
Platform-1 → Whitefield (Kadugodi)
Platform-2 → Challaghatta
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
ParkingCar parking Two Wheelers
AccessibleYes Disabled access
ArchitectITD - ITD Cementation India JV
Other information
StatusStaffed
Station codeVDHP
History
Opened26 March 2023; 20 months ago (2023-03-26)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Sri Sathya Sai Hospital Purple Line Kundalahalli
towards Challaghatta
Location
Map

Nallurhalli is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. This station is located near the GE Healthcare centre, CWC CFS Container Services, Flipkart ITPL Hub and many more.[1][2][3]

The Whitefield - Krishnarajapura trial runs were successfully conducted from 25 October for a month.[4] This metro station was inaugurated on March 25 2023 by Prime Minister Narendra Modi and was opened to the public on March 26 2023.[5][6][7][8][9]

Station layout

[edit]
Nallurhalli track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side Platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Whitefield (Kadugodi)
Next Station: Sri Sathya Sai Hospital
Platform 2 Westbound Towards ← Challaghatta
Next Station: Kundalahalli
Side Platform | Doors will open on the left Disabled access
L2

Entry/Exit

[edit]

There are 2 Entry/Exit points - A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A - Towards GE HealthCare side
  • Entry/Exit point B - Towards Prasad Tech Park side

See also

[edit]

References

[edit]
  1. ^ Rustagi, Abha (5 May 2022). "Baiyappanahalli-Whitefield Line to be functional from Dec 2022". Metro Rail News. Retrieved 21 June 2022.
  2. ^ "Baiyappanahalli-Whitefield Metro stretch to have 13 stops". The New Indian Express. 14 September 2017. Retrieved 28 November 2022.
  3. ^ "Namma Metro: Why upcoming Whitefield stretch is a game changer for Bengaluru?". TimesNow. 5 March 2023. Retrieved 5 March 2023.
  4. ^ "Baiyappanahalli-Whitefield metro line trial from October 25". Deccan Herald. 5 October 2022. Retrieved 6 October 2022.
  5. ^ "Metro finally comes to Whitefield, take a ride on March 26 from 7 am!". Deccan Herald. 26 March 2023. Retrieved 26 March 2023.
  6. ^ "Bengaluru Metro: Much awaited metro line between Whitefield to KR Puram to be operational by March". TimesNow. 25 November 2022. Retrieved 28 November 2022.
  7. ^ Bureau, The Hindu (3 February 2023). "Namma Metro train between K.R. Puram and Whitefield to run at frequency of 10 minutes". The Hindu. ISSN 0971-751X. Retrieved 3 February 2023. {{cite news}}: |last= has generic name (help)
  8. ^ "ಮಾರ್ಚ್ 25ಕ್ಕೆ ವೈಟ್‌ಫೀಲ್ಡ್-ಕೆಆರ್ ಪುರಂ ಮೆಟ್ರೋ ಸೇವೆ ಲೋಕಾರ್ಪಣೆ?". Kannadaprabha (in Kannada). Retrieved 14 March 2023.
  9. ^ "BMRCL to zoom metro from KR Puram to Whiefield in 22 minutes". The New Indian Express. Archived from the original on 2 March 2023. Retrieved 2 March 2023.
[edit]