Jump to content

Manjunathanagara metro station

Coordinates: 13°03′01″N 77°29′40″E / 13.05022°N 77.49444°E / 13.05022; 77.49444
From Wikipedia, the free encyclopedia

Manjunatha Nagar
Namma Metro station
General information
LocationArch No 45, Gomatha Complex Bagalgunte, next to Bagalgunte, Bengaluru, Karnataka 560073
Coordinates13°03′01″N 77°29′40″E / 13.05022°N 77.49444°E / 13.05022; 77.49444
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
Accessible(TBC)
Other information
StatusFinal Stages before Operations
Station code(TBC)
History
OpeningOctober 2024; 31 days' time (October 2024)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Chikkabidarakallu
towards Madavara
Green Line
(extension by October 2024)
Nagasandra
Location
Map

Manjunatha Nagar is an upcoming elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway (NH-75) leading towards the city of Nelamangala in Karnataka.

As per latest updates, the Madavara - Nagasandra stretch trial run was conducted on August 6 2024 and with successful trial run, this metro station is slated to be operational around end of September 2024 or beginning of October 2024.[1][2]

Station layout

[edit]

Station Layout (TBC)

Manjunath Nagar track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Nagasandra
Platform 1
Northbound
Towards ← Madavara
Next Station: Chikkabidarakallu
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

[edit]

See also

[edit]

References

[edit]
  1. ^ Sridhar Vivan (5 August 2024). "Green line trial runs kick off in August". Bangalore Mirror. Retrieved 7 August 2024.
  2. ^ Ghoshal, Sudeshna (6 August 2024). "Bengaluru metro update: New trains on Green line for THESE stations in Bangalore; trial run today". Mint. Retrieved 7 August 2024.
[edit]