Line 4 (Changchun Rail Transit)
Appearance
Line 4 | |
---|---|
Overview | |
Status | Operational |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini | |
Stations | 21 |
Service | |
Type | Light rapid transit |
System | Changchun Rail Transit |
Services | 1 |
Operator(s) | Changchun Rail Transit Corporation |
Depot(s) | Tiangong Road Depot |
Rolling stock | Changchun Light Rail 3000 Stock/4000 Stock |
History | |
Opened | 30 June 2011 |
Technical | |
Line length | 20.8 km (12.9 mi)[1] |
Number of tracks | 2 |
Character | elevated and underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead line, 750 V DC |
Operating speed | 70 km/h |
Line 4 of the Changchun Rail Transit (Chinese: 长春轨道交通4号线; pinyin: Chángchūn Guǐdào Jiāotōng Sì Hào Xiàn) is a grade separated light rapid transit line in Changchun, running from north to south. Although it uses extended low floor LRVs, the line operates more like a metro, being entirely separate from traffic, similar to the Seville Metro in Spain and U6 of the Vienna U-Bahn.
Line 4 was opened on 30 June 2011. It is currently 20.8 km (12.9 mi) long with 21 stations.[1][2][3]
Opening timeline
[edit]Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Dongdaqiao Bridge — Tiangong Road | 30 June 2011 | 13.0 km (8.1 mi) | 11 | Initial section |
Changchun Railway Station (North) — Dongdaqiao Bridge | 7 May 2012 | 3.3 km (2.1 mi) | 3 | Northern extension |
Gongping Road | 17 December 2012 | Infill station | 1 | |
Tiangong Road — Tianxin Road | 6 June 2023 | 4.5 km (2.8 mi)[1] | 5 | Southern extension |
Dongxin Road | 31 December 2023[4] | Infill station | 1 |
Stations
[edit]Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Changchun Railway Station (North) | 长春站北 | CJ ~ JH CB ~ BA CCT 1 |
0.00 | 0.00 | Kuancheng |
Beiyatai Street | 北亚泰大街 | 1.25 | 1.25 | ||
Puppet Regime Palace Museum | 伪满皇宫 | 3 | 1.60 | 2.85 | |
Dongdaqiao Bridge | 东大桥 | 5 | 0.60 | 3.45 | Nanguan |
Dongxin Road | 东新路 | 1.25 | 4.70 | Erdao | |
Jilin Avenue | 吉林大路 | 2 | 1.25 | 5.95 | |
Gongping Road | 公平路 | 1.00 | 6.95 | ||
Haikou Road | 海口路 | 0.95 | 7.90 | ||
Pudong Road | 浦东路 | 0.75 | 8.65 | ||
Weihai Road | 威海路 | 7 | 0.70 | 9.35 | |
Beihai Road | 北海路 | 0.95 | 10.30 | ||
Vocational Institute of Technology | 职业学院 | 3 | 1.05 | 11.35 | |
Shirong Road | 世荣路 | 0.80 | 12.15 | Nanguan | |
South Ring Road | 南环城路 | 0.90 | 13.05 | ||
Yisheng Street | 宜盛街 | 1.15 | 14.20 | ||
Tiangong Road | 天工路 | 1.30 | 15.50 | ||
Fuzhi Avenue | 福祉大路 | 6 | |||
Tianqing Road | 天青路 | ||||
Tianpu Road | 天普路 | ||||
Qianshilipu | 前十里堡 | ||||
Tianxin Road | 天新路 | ||||
See also
[edit]References
[edit]- ^ a b c "定啦!长春轨道交通4号线南线6月6日8时58分开通运营". 2023-06-05. Archived from the original on 2023-06-05.
- ^ 轻轨4号线3日起试运营 全程16.33公里. 新浪吉林 (in Chinese). 2013-02-05. Archived from the original on 2019-10-07. Retrieved 2019-10-07.
- ^ 长春轻轨4号线 9月末或10月初开始售票运行. 中国吉林网 (in Chinese). Archived from the original on 2012-12-26. Retrieved 2012-10-04.
- ^ "好消息!长春轻轨4号线东新路站12月31日开通". 腾讯网. 2023-12-30. Retrieved 2023-12-31.