Jump to content

Jiangtiao line

From Wikipedia, the free encyclopedia
Jiangtiao line
CRRC Changchun CCD5051 electric multiple unit used by Jiangtiao Line
Overview
Native name重庆市郊铁路江跳线
StatusOperational
LocaleChongqing, China
Termini
Stations7
Service
TypeRapid transit
SystemChongqing Rail Transit
Chongqing Suburban Railway
Operator(s)Chongqing Jiangtiao Line Rail Transit Operation Management Co., Ltd.
History
Opened6 August 2022; 2 years ago (2022-08-06)[1]
Technical
Line length28.22 km (17.54 miles)[2] (Tiaodeng – Shengquansi)
4.6 km (2.9 miles)[3] (Shengquansi – Dingshan, under planning)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead line with Multiple systems
  • 25 kV AC (Jiulongyuan – Shengquansi)
  • 1.5 KV DC (Tiaodeng – Shilinsi)
Operating speed120 km/h (75 mph) (Peak)
Route map

Yuegangbeilu
Shizishan depot
Yuegang Avenue
Chunxuan Avenue
Central Park West
Lujiagou
Ganyue Avenue
Yuhegou
The EXPO Garden Center
3
Danhe
Huxiajie
Chongguang
Hemulu
Renhe
Dazhulin depot
Xingfu Square
Ranjiaba
Dalongshan
Dashiba
Zhongshutuo
Hongyancun
Xietaizi
Shiqiaopu
Shixinlu
Bashan
Fengxilu
Chongqing W
Railway Station
Huayan Temple
Huachenglu
Banshan
Zhongliangshan
Jinjianlu
Jin'aoshan
Huayan Center
Zhongliangshan depot
Jiangtiao line
Tiaodeng
Shilinsi
DC 1.5 kV
AC 25 kV
Jiulongyuan
Shuangfu
Xiangtang
Shuangfu Depot
Jiangjin High-speed Railway
Shengquansi
Jijiang
Dingshan
=
Virtual interchange: transport
card only, re-entry required.

Jiangtiao line of Chongqing Suburban Railway is a suburban rapid transit line in Chongqing, China.[4] The initial section of Jiangtiao line from Tiaodeng to Shengquansi opened on 6 August 2022.[1]

This line had been known as the extension of Line 5 during its construction. Nevertheless, by the time it started operation, the color, train numbers and station codes of this line had all been separated from Line 5. Since November 30th, 2023, through operation between Line 5 and this line came into service.[5]

Jiangtiao line is also the first rapid transit line in China that supports auto-switching between AC and DC sections without dropping pantographs down. Switch actions are performed at a dead section east of Zhongliangshan Tunnel.[6]

Sections

[edit]

Tiaodeng – Shengquansi

[edit]

The initial section from Tiaodeng to Shengquansi began construction in 2015.[3] The initial section is about 28.22 km (17.54 mi) in length, including 5.8 km (3.6 mi) underground section and 22.42 km (13.93 mi) elevated or at-grade.[2] The section opened on 6 August 2022.[1]

Shengquansi – Dingshan

[edit]

The remaining section from Shengquansi to Dingshan is currently under construction. Construction started on 28 December 2022. The section will be 4.524 km (2.811 mi) in length with 2 stations.[7]

Opening timeline

[edit]
Segment Commencement Length Station(s) Name
TiaodengShengquansi 6 August 2022 28.22 km (17.54 mi)[1] 7 Initial section

Stations

[edit]
Legend

  - In operation
  - Under planning

Service
routes
Station
No.
Station name[8] Connections Distance
km
Power
supply
Location
English Chinese
Through-service to/from Shiqiaopu via Line 5
江跳/01 Tiaodeng 跳磴      Line 5      Line 18 - 0 1500 V DC Dadukou
江跳/02 Shilinsi 石林寺 0.97 0.97
江跳/03 Jiulongyuan 九龙园 7.36 8.33 25 kV AC Jiulongpo
江跳/04 Shuangfu 双福 4.32 12.65 Jiangjin
江跳/05 Xiangtang 享堂 5.32 17.97
江跳/06 Jiangjin High-Speed Railway 江津高铁 Jiangjin North railway station Jiangjinbei 4.37 22.34
江跳/07 Shengquansi 圣泉寺 3.99 26.33
江跳/08 Jijiang 几江
江跳/09 Dingshan 鼎山

References

[edit]
  1. ^ a b c d "单程28分钟 江跳线6日正式通车". 2022-08-04. Archived from the original on 2022-08-06.
  2. ^ a b "重庆轨道交通4号线二期、18号线、5号线跳蹬至江津段、市域快线璧山至铜梁线PPP项目". Archived from the original on 2022-06-09. 线路全长约28.22 km,其中:高架线及地面线22.42 km,地下5.8 km,设车站7座
  3. ^ a b "江跳段力争2022年春节前建成通车". 2020-12-18. Archived from the original on 2021-09-26.
  4. ^ "重庆轨道交通延长线江跳线开建 将采用新型快速车辆". 2020-10-27. Archived from the original on 2021-09-26.
  5. ^ "重庆两条轨道交通线今日全线贯通运营  5号线穿过嘉陵江,10号线覆盖南坪商圈  江跳线与5号线实现贯通运营,江津可直达石桥铺". 重庆日报. 2023-11-30.
  6. ^ Yang Yongqin; Liao Xuemei (2022-08-03). "关注首条市域(郊)铁路——江跳线特别报道:江跳线"黑科技"大揭秘". Chongqin Daily. p. 6. Retrieved 2022-08-06.
  7. ^ "江跳线过江段正式开工 几江半岛半小时直通重庆中心城区". 2022-12-28. Archived from the original on 2023-01-24.
  8. ^ "重庆轨道交通线网图". Archived from the original on 2022-06-09.