Jump to content

Havant railway station

Coordinates: 50°51′14″N 0°58′55″W / 50.854°N 0.982°W / 50.854; -0.982
From Wikipedia, the free encyclopedia

Havant
National Rail
Southern Class 377 at Havant railway station
General information
LocationHavant, Havant
England
Grid referenceSU717065
Managed bySouth Western Railway
Platforms2
Other information
Station codeHAV
ClassificationDfT category C2
History
Opened15 March 1847 (1847-03-15)
Key dates
1863resited
Passengers
2019/20Decrease 2.241 million
 Interchange Increase 0.345 million
2020/21Decrease 0.682 million
 Interchange Decrease 95,239
2021/22Increase 1.631 million
 Interchange Increase 0.228 million
2022/23Increase 1.848 million
 Interchange Increase 0.276 million
2023/24Increase 1.890 million
 Interchange Increase 0.343 million
Location
Map
Notes
Passenger statistics from the Office of Rail & Road
Hayling Island Branch Line
Havant
Langston
Hayling Bridge over
Langstone Harbour
North Hayling
Hayling Island
Hayling Island train at Havant in 1958

Havant railway station is a railway station in Havant, Hampshire, near Portsmouth, located on the Portsmouth Direct Line which runs between London Waterloo and Portsmouth Harbour.

Havant is served by trains operated by Southern, who provide the most trains at the station, and South Western Railway who also provide frequent trains and manage the station.[1]

Havant is the nearest station to Hayling Island and also serves the nearby town of Waterlooville. Buses depart from the nearby bus station to both these places.[2]

History

[edit]

The first station at Havant was built in 1847 by the London, Brighton & South Coast Railway (LB&SCR) 500 metres to the east - a small wayside station (called Havant Halt). It was demolished after a serious fire. A newer station was then built 200 m west to serve the then new London & South Western Railway (L&SWR) Portsmouth Direct Line. This station was demolished so that a bigger station could be built 300 m further west to serve the new Hayling Island branch line.[3] It had three platforms, one for Hayling Island[4] and two for the stopping main line services.

Prior to grouping, the "Battle of Havant" took place between the LB&SCR and the L&SWR when the two railway companies fought for the right to use LB&SCR tracks into Havant in order for the L&SWR to reach Portsmouth (see Havant New).

Havant was the terminus for the Hayling Island branch services until late in 1963. Apart from the platform there was a run round loop, a siding serving a warehouse and a water column supplied by a circular metal water tank located near the signal box. In the Spring of 1966 the Hayling Island tracks were removed. The space they occupied was later replaced with a car park and a fence on the south side of the platform.[5]

As part of the Waterloo to Portsmouth electrification the station was completely rebuilt in 1938. The number of tracks was increased from two to four, two for stopping trains and the two for non-stop, generally express trains. The northernmost of the two fast tracks (as mentioned above) was later removed, and the remaining fast (through) track was also removed in late 2006. Judging by the new track layout east of the station, this arrangement seems to be permanent.

After the engineering work of 2007 was finally completed after a lengthy delay that had lasted from the beginning of the year, the stations two platforms have become bi-directional platforms. This means that both platforms can be used for trains going in either direction. Such as when the fast Waterloo service, the xx34 is running late behind the slow Waterloo service xx40. This means that the Slower service may be placed on Platform 1, which services to London go on, and wait, while the faster service is brought onto Platform 2, and then over take the service, so that it can make up the time lost, and not lose more time while waiting to overtake the slower service up in Haslemere station.

Recent changes

[edit]
A diagram showing the layout changes of Havant station, with level crossings labelled as LC

Since July 2006, the Hayling Island platform face no longer exists and a new cycle centre has been built in place of the former platform. A new station name pole has been erected at the position also. As well as these, most of the signs within the station were changed and new seats have been installed on the platforms. This was in line with commitments made in the South Western franchise.

There has been some discussion about putting a third (terminating) platform in the gap, however this would have to be very short and narrow. There has also been discussion about reinstating the Hayling Island platform, and even the whole Hayling Island branch. Both of these proposals have now been completely abandoned.[6]

In December 2006, the fast southbound through track was removed. Both the entry and exit from the southbound platform were straightened out to allow a quicker entry and exit speed. New crossovers were put in place to allow bi-directional working on both platforms. From west to east the new layout will be: new NB->SB crossover, new SB->NB crossover, existing road bridge, platforms, new NB->SB crossover, existing SB->NB crossover, level crossing. The level crossing was also resurfaced and new crossing gates installed

Services

[edit]

Havant is a junction station and provides passengers with an interchange between the West Coastway Line and the Portsmouth Direct Line. It therefore has services to Portsmouth, London Waterloo, London Victoria via Gatwick Airport, Brighton and Southampton.

Most trains at Havant are provided by Southern, who operate five trains per hour in each direction to and from London Victoria, Brighton, Portsmouth and Southampton. South Western Railway serve the station with two trains per hour in each direction between London Waterloo and Portsmouth.

The typical off-peak service in trains per hour is:[7]

During peak hours and on Saturdays, the services between London Waterloo and Portsmouth increase to 3 tph.

On Sundays, the services to London Victoria and Southampton is reduced to 1 tph, the service to Brighton is reduced to 2 tph and the service to Portsmouth is reduced to 4 tph

Services at Havant are operated using a mixture of rolling stock including Class 377, 444 and 450 EMUs.

Preceding station National Rail National Rail Following station
Rowlands Castle   South Western Railway
Portsmouth Direct Line
Stopping Services
  Bedhampton
Petersfield   South Western Railway
Portsmouth Direct Line
Fast Services
  Fratton
Warblington   Southern
West Coastway line
Stopping services
  Hilsea
Emsworth     Bedhampton
Limited Service
Chichester   Southern
West Coastway line
Fast services
  Fratton
Emsworth   Southern
West Coastway line
Southampton services
  Cosham
Disused railways
Terminus   British Rail Southern Region
  Langston

Former services

[edit]

Until May 2022, Great Western Railway operated limited services between Brighton, Portsmouth Harbour and Bristol Temple Meads that called at Havant.[8][9][10]

Further reading

[edit]
  • Cousins, Frank; rogers, Rogers (October 2017). A Brief History of the Railway in Havant & The Arrival of the Railway in Emsworth (PDF). Havant History Booklet. Vol. 3. Waterlooville: HSDC. Archived (PDF) from the original on 10 January 2021. Retrieved 10 January 2020.

References

[edit]
  1. ^ Table 123, 156, 157, 165, 186, 188 National Rail timetable, May 2020
  2. ^ https://tiscon-maps-stagecoachbus.s3.amazonaws.com/ZoneMaps/South/HavantAreaMapSep19.pdf[permanent dead link] [bare URL PDF]
  3. ^ Memories of the Hayling Island Branch:Produced by Ian Heys for "Branch Line Videos", Catalogue Number 418-514424
  4. ^ "Branch Line to Hayling" Mitchell,V./Smith,K (In association with Bell,A): Midhurst, Middleton Press, 18984 ISBN 978-0-906520-12-3.
  5. ^ "Catching the train to Hayling Island: a history" Newell, L: Havant, Havant Borough Council, 2005.
  6. ^ Re-open Havant/ Hayling Island Railway Line BBC News 23 February 2006
  7. ^ Table 123, 156, 157, 165, 186, 188 National Rail timetable, May 2020
  8. ^ Great Western Railway to terminate Brighton services Rail issue 952 9 March 2022 page 22
  9. ^ Great Western Railway set to axe Brighton service The Argus 21 April 2022
  10. ^ Great Western Railway services calling at Havant on 13 May 2022 Realtime Trains
[edit]

Media related to Havant railway station at Wikimedia Commons

50°51′14″N 0°58′55″W / 50.854°N 0.982°W / 50.854; -0.982