You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
Reviewer tools
|
K-500-65/3000 Steam Turbine is a steam turbine developed by the Soviet Union for usage in nuclear power plants with RBMK-1000.
History
[edit]In the 1960s, the Kharkiv turbine plant (now Turboatom) begun development of the K-500-65/3000 steam turbine. The designation behind the steam turbine was K for Kharkiv, 500 for the turbine’s nominal power output, 65 for the steam pressure in atmosphere, and 3000 for the turbine’s rotational speed in RPM.
To improve thermal efficiency and reliability of power units with K-500-65/3000 turbines, balance and operation inspections tests were carried out between 2008 and 2010. These inspections took place in the Kursk Nuclear Power Plant and Leningrad Nuclear Power Plant. In 2013, balance tests of district heating installations were also performed at Leningrad NPP, which determined the performance of the equipment.[1]
Design
[edit]The K-500-65/3000 turbine itself is single-shaft with a five-cylinder unit that includes one high-pressure unit, one high-pressure cylinder (HPC), and four low-pressure cylinders (LPC). Steam from the separator drum passes through steam filters to the two paired steam distribution valve blocks, after which it is directed into the HPC through two oppositely positioned pipes. The HPC is a two-flow design with five pressure stages in each flow. After passing through the HPC, the steam is sent for separation and reheating in four combined separator-superheaters (SSPs), and afterwards it enters the LPCs. The LPCs is also a two-flow design with five pressure stages between each flow. Finally, after the LPCs, the steam is directed into separate condensers for each cylinder. The HPC and LPC rotors are connected to each other and to the generator rotor by rigid couplings, supported by journal bearings. The turbine is also equipped with a hydraulic rotor lift system for startup mode and a turning gets located between the third and fourth LPCs.[2]
The configuration is a block-based turbine plant with two K-500-65/3000 turbines and a steam generator.[3] As part of the “double-block” configuration, a single RBMK-1000 reactor supplied steam to two such turbines, which operated indefinitely, allowing each turbine to operate separately even if the other was shut down.
Steam Parameters & Distribution
[edit]This turbine operates at a rated fresh steam flow of 510 tons per hour, with maximum fresh steam flow rate of 550 tons per hour. The pressure is 10.325 kPa, and has an initial steam temperature 280.4°C. Steam is distributed through common collector feeds via four pipelines to twin blocks of steam distribution valves. It has two combined IBS units in each block. For the management of condensation, steam is discharged at 354.6 kPa to SPP for moisture separation and overheating to 265.4°C.[3]
Other Versions
[edit]- K-500-65/3000-2
The K-500-65/3000-2 Turbine was later developed by the Kharkiv turbine plant. It did not have a condensing steam turbine without controlled steam extraction, featuring single-stage two-step steam reheating. It was installed in single-loop nuclear power plants with RBMK-1000 reactors, and was designed to convert the thermal energy of water steam into mechanical energy to rotate the TVV-500-2U3 turbo generator rotors. The turbine operates at a rotational speed of 3000 rpm, and consists of a single-shaft, five-cylinder active-type unit, comprising one high-pressure cylinder (HPC), and four low-pressure cylinders (LPC) symmetrically positioned on either side of the HPC. The LPCs have eight exhausts leading to four condensers. The HPV casing is a two-flow, double-walled construction, with five pressure stages in each flow. The flow section of the HPC is equipped with an advanced cooling system. Despite efforts to improve design and reduce the amount of materials required, the operation of the K-500-65/3000-2 turbines revealed increased density to working parameters, which led to frequent vibration issues in the bearings.[4]
References
[edit]- ^ Материалы Международной конференции по теплоэнергетике – 2015. Том 3 (PDF) (in Russian). Сибирское отделение Российской академии наук. 2015. Retrieved 26 February 2025.
- ^ "Турбина К-500-65/3000". reactors.narod.ru (in Russian). Retrieved 26 February 2025.
- ^ a b "Steam turbine unit K-500–65–3000". Other Referats. 2012. Retrieved 2025-02-25.
- ^ "Расчёт первой ступени паровой турбины ПТУ К-500-65-3000". Referat.ru (in Russian). Retrieved 26 February 2025.