Jump to content

Changchun Qiao station

Coordinates: 39°57′31″N 116°17′39″E / 39.958527°N 116.294255°E / 39.958527; 116.294255
From Wikipedia, the free encyclopedia
Changchun Qiao[1]

长春桥
Beijing Subway
Line 12 platform
General information
LocationChangchun Bridge长春桥
Landianchang North Road (蓝靛厂北路) / Landianchang South Road (蓝靛厂南路) and Yuanda Road (远大路) / Changchunqiao Road (长春桥路)
Haidian District, Beijing
China
Coordinates39°57′31″N 116°17′39″E / 39.958527°N 116.294255°E / 39.958527; 116.294255
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Line 10
     Line 12
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
OpenedDecember 30, 2012; 12 years ago (2012-12-30) (Line 10)
December 15, 2024; 32 days ago (2024-12-15) (Line 12)
Services
Preceding station Beijing Subway Following station
Chedaogou
outer loop / anticlockwise
Line 10 Huoqiying
inner loop / clockwise
Landianchang Line 12 Suzhou Qiao
towards Dongbabei
Location
Changchun Qiao[1] is located in Beijing
Changchun Qiao[1]
Changchun Qiao[1]
Location in central Beijing

Changchun Qiao station[1] (simplified Chinese: 长春桥站; traditional Chinese: 長春橋站; pinyin: Chángchūn Qiáo zhàn) is an interchange station between Line 10 and Line 12 of the Beijing Subway.[2] The Line 10 station opened on December 30, 2012.[3] The Line 12 station opened on December 15, 2024.

Location

[edit]

It is located a short distance from the Golden Resources Mall, one of the world's largest shopping malls. The station also serves the Yuanda residential area.

Station layout

[edit]

The station has underground island platforms for both Line 10 and Line 12.

Exits

[edit]

There are 6 exits, lettered A1, A2, B, C D1, and D2. Exits A1, A2, C and D2 have accessible elevators.

[edit]

References

[edit]
  1. ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2024-11-08.
  2. ^ (Chinese) 地铁车站首次下穿立交桥. 新浪. Archived from the original on 29 January 2022. Retrieved 28 January 2022.
  3. ^ (Chinese) 轨道交通四条新线12月30日开通试运营. Beijing Municipal Transportation Administration Bureau. Archived from the original on 11 May 2013. Retrieved 29 December 2012.
[edit]