Tata Power Dholera Solar PV Station
Map
CountryIndia
LocationDholera, Gujarat
Coordinates22°08′54″N 72°14′10″E / 22.148434°N 72.236085°E / 22.148434; 72.236085
Construction beganMarch 2020
Commission dateApril 2022
OperatorTata Power Renewable Energy Limited
Solar farm
TypeFlat-panel PV
Site area1320 acres
Power generation
Nameplate capacity400 MW

Tata Power Dholera Solar PV Station is a photovoltaic power station located within the Dholera Solar Park. It is owned and operated by Tata Power Renewable Energy Limited, a wholly-owned subsidiary of Tata Power.[1]

History

[edit]

The 300 MW Phase 1 of the plant went online in April 2022.[2] At that time, it was the largest single-axis solar tracker system.[3]

During construction, unpredictable weather, including heavy rains, flooded the 33 KV cable trench. Despite this, the EPC team used floaters to install high-tension cables and elevated pre-cast ballasts to position power cables 500 mm above ground, bypassing the conventional underground approach.[4]

Currently, the plant is providing electricity to Gujarat Urja Vikas Nigam under a 25-year power purchase agreement.[5][6]

References

[edit]
  1. ^ "Tata Power to develop 100 MW solar project at Dholera, Gujarat". The Hindu. 2020-10-14. ISSN 0971-751X. Retrieved 2024-09-12.
  2. ^ "Tata power venture: 300-MW solar project commissioned in Dholera". The Indian Express. 2022-04-05. Retrieved 2024-09-12.
  3. ^ www.ETEnergyworld.com. "Tata Power commissions 300 MW solar plant in Dholera, Gujarat - ET EnergyWorld". ETEnergyworld.com. Retrieved 2024-09-12.
  4. ^ "Tata Power Renewables commissions 300MW solar plant in Gujarat". Business Standard. 4 April 2022. Retrieved 12 September 2024.
  5. ^ Prasad, Rachita (2020-10-14). "Tata Power bags another 100 mw-project at Dholera Solar Park from GUVNL". The Economic Times. ISSN 0013-0389. Retrieved 2024-09-12.
  6. ^ "Tata Power to set up 100-MW solar power plant in Gujarat". BusinessLine. 2020-10-14. Retrieved 2024-09-12.