Tata Power Dholera Solar PV Station
It has been suggested that this article be merged into Tata Power. (Discuss) Proposed since September 2024. |
Tata Power Dholera Solar PV Station | |
---|---|
Country | India |
Location | Dholera, Gujarat |
Coordinates | 22°08′54″N 72°14′10″E / 22.148434°N 72.236085°E |
Construction began | March 2020 |
Commission date | April 2022 |
Operator | Tata Power Renewable Energy Limited |
Solar farm | |
Type | Flat-panel PV |
Site area | 1320 acres |
Power generation | |
Nameplate capacity | 400 MW |
Tata Power Dholera Solar PV Station is a photovoltaic power station located within the Dholera Solar Park. It is owned and operated by Tata Power Renewable Energy Limited, a wholly-owned subsidiary of Tata Power.[1]
History
[edit]The 300 MW Phase 1 of the plant went online in April 2022.[2] At that time, it was the largest single-axis solar tracker system.[3]
During construction, unpredictable weather, including heavy rains, flooded the 33 KV cable trench. Despite this, the EPC team used floaters to install high-tension cables and elevated pre-cast ballasts to position power cables 500 mm above ground, bypassing the conventional underground approach.[4]
Currently, the plant is providing electricity to Gujarat Urja Vikas Nigam under a 25-year power purchase agreement.[5][6]
References
[edit]- ^ "Tata Power to develop 100 MW solar project at Dholera, Gujarat". The Hindu. 2020-10-14. ISSN 0971-751X. Retrieved 2024-09-12.
- ^ "Tata power venture: 300-MW solar project commissioned in Dholera". The Indian Express. 2022-04-05. Retrieved 2024-09-12.
- ^ www.ETEnergyworld.com. "Tata Power commissions 300 MW solar plant in Dholera, Gujarat - ET EnergyWorld". ETEnergyworld.com. Retrieved 2024-09-12.
- ^ "Tata Power Renewables commissions 300MW solar plant in Gujarat". Business Standard. 4 April 2022. Retrieved 12 September 2024.
- ^ Prasad, Rachita (2020-10-14). "Tata Power bags another 100 mw-project at Dholera Solar Park from GUVNL". The Economic Times. ISSN 0013-0389. Retrieved 2024-09-12.
- ^ "Tata Power to set up 100-MW solar power plant in Gujarat". BusinessLine. 2020-10-14. Retrieved 2024-09-12.