Jump to content

Met 3

Coordinates: 25°46′17″N 80°11′19″W / 25.771364°N 80.188608°W / 25.771364; -80.188608
From Wikipedia, the free encyclopedia
Met 3
Whole Foods at base in early 2016
Map
General information
StatusComplete [1]
TypeResidential
Location250 Southeast 3rd Avenue, Miami, Florida, United States
Coordinates25°46′17″N 80°11′19″W / 25.771364°N 80.188608°W / 25.771364; -80.188608
Construction startedDecember 2011
CompletedJanuary 14, 2015
Height
Roof~349 ft (106 m)
Technical details
Floor count32
Design and construction
DeveloperMDM Development Group

Met 3 is part of Metropolitan Miami, a complex of four skyscrapers in the central business district of Downtown Miami, Florida, United States. Met 3 was proposed as the tallest of the four towers, was originally under construction during the 2000s real estate bubble and planned for completion in 2011. However, the project was put on hold.[2] By 2011 construction had never gotten past site preparation, until the new design finally began construction in December 2011.

If completed as originally proposed, the 828 feet Met 3 would have been the tallest building in Miami and the state of Florida. It would have contained 76 floors, which would have also made it the tallest building in the United States south of New York City in terms of floor count. In total height, it would have also been the tallest residential building south of New York, consisting of residential condominium units, passing the Four Seasons Hotel Miami, which holds that distinction currently.

History

[edit]

The Metropolitan Miami project gained attention due to NBA star Shaquille O'Neal's involvement in the project. He formed the O'Neal Group, a building-development company. The Metropolitan Miami project is the group's first.

In 2008 supermarket chain Whole Foods joined the lease for a location on the ground level of Met 3. The bottom of Met 3, including Whole Foods, and the separate Met Square shopping center, are set to begin construction in the summer of 2011. The Met 3 base is supposed to be built such that the Met 3 tower could later be built on top.[3]

Groundbreaking began on Met 3 in December 2011 with Whole Foods still committed to the project despite multiple delays.

[edit]

See also

[edit]

References

[edit]
  1. ^ "Monarc at Met 3, Miami | 196560". Emporis. Archived from the original on November 4, 2012. Retrieved 2022-05-03.{{cite web}}: CS1 maint: unfit URL (link)
  2. ^ "Monarc at Met 3, Miami | 196560". Emporis. Archived from the original on June 4, 2011. Retrieved 2022-05-03.{{cite web}}: CS1 maint: unfit URL (link)
  3. ^ "The Market Report". www.biscaynetimes.com. Archived from the original on 2011-07-26.