Mallige line

From Wikipedia, the free encyclopedia

Mallige line
Overview
Native nameMallige mārga
OwnerIndian Railways
Termini
Stations15
Service
TypeCommuter rail
Operator(s)Bengaluru Suburban Rail Company Limited
Depot(s)Soladevanahalli
History
Planned openingMarch 2027; 2 years' time (March 2027)[1]
Technical
Line length28.72 km (17.85 mi)
Number of tracksDouble-track
CharacterElevated and at-grade
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV 50 Hz AC overhead catenary

The Mallige line is an under-construction Bengaluru Suburban rail line between Benniganahalli to Chikkabanavara. The 27 km (17 mi) long broad-gauge line was approved in 2019 with its construction works commencing in 2022. The line which is also referred as 'corridor-2' is being built in two packages C2A and C2B respectively. The C1A package consists eight stations, while the C1B has four. The line is named after the flower Mallige (Jasmine) in Kannada.

History

[edit]

The route between Benniganahalli and Chikkabanavara was part of the longer line (83 km (52 mi)) of TumakuruYeshavanthapur–Benniganahalli proposed under 'Call To Action' report of 2010.[2] Later in 2019, the line saw reduction in length with termination in Chikkabanavara, in Northwest of Bengaluru.[3]

On 7 October 2020, government of India approved the four corridors of Bengaluru suburban rail project including the KSR Bengaluru – Devanahalli line and its Airport branch.[4] The line was then named after the regional flower's Kannada name Mallige.[5]

It was also the first line of the four where construction works began.[6] In 2024, minister for railways in Karnataka, V Somanna stated that the Mallige line along with Kanaka (line 4) were prioritised.[7]

In september 2024, the construction progress on the line stood at 28% with 22% of the financial expenditure. The line was then targeted for completion in June 2026.[8] However, the deadline was later pushed to March 2027.[1]

Construction

[edit]
History
Section Opening Terminals Length Stations
C2A March 2027 Benniaganahalli Mathikere 16 km (9.9 mi) 8
C2B March 2027 Yeshavanthapur Chikkabanavara 12 km (7.5 mi) 4

Stations

[edit]
Mallige Line
# Station Name Opening Connections / Transits / Terminals Station Layout Platform Level Type
English Kannada
1 Benniganahalli ಬೆನ್ನಿಗಾನಹಳ್ಳಿ 2028 Purple Line
 Parijaata  (Under-construction)
TBD Side
2 Kasthurinagara ಕಸ್ತೂರಿ ನಗರ Green Line
3 Sevanagara ಸೇವಾನಗರ
4 Banaswadi ಬಾಣಸವಾಡಿ
5 Kaverinagara ಕಾವೇರಿನಗರ
6 Nagawara ನಾಗವಾರ
7 Kanakangara ಕನಕಾಂಗರ
8 Hebbala ಹೆಬ್ಬಾಳ Blue Line
Orange Line
Red Line
9 Lottegollahalli ಲೊಟ್ಟೆಗೊಲ್ಲಹಳ್ಳಿ
10 Mathikere ಮತ್ತಿಕೆರೆ
11 Yeshavanthapura ಯಶವಂತಪುರ Green Line
 Sampige  (Planned)
12 Jalahalli ಜಾಲಹಳ್ಳಿ
13 shettyhalli ಶೆಟ್ಟಿಹಳ್ಳಿ
14 Maidarahallli ಮೈದರಹಳ್ಳಿ
15 Chikkabanavara ಚಿಕ್ಕಬಾಣಾವರ

See also

[edit]

References

[edit]
  1. ^ a b "Railways to construct new terminal at Devanahalli; Bengaluru suburban rail corridor deadline pushed to 2027". The Indian Express. 17 January 2025. Retrieved 17 January 2025.
  2. ^ "Bengaluru Commuter Rail - Call To Action - Reprint 2 | PDF | Rail Transport | Sustainable Transport". Scribd. Retrieved 15 January 2025.
  3. ^ "railnews.in". www.railnews.in. Retrieved 16 January 2025.
  4. ^ "Centre approves Bengaluru suburban rail project". Deccan Herald. Retrieved 16 January 2025.
  5. ^ Philip, Christin Mathew (6 March 2021). "Bengaluru suburban rail corridors likely to be named after flowers". The Times of India. Retrieved 10 July 2021.
  6. ^ "Bengaluru: Byappanahalli-Chikkabanavara suburban rail corridor work to commence in a month; work order issued to L&T". The Times of India. 2 September 2022. ISSN 0971-8257. Retrieved 17 January 2025.
  7. ^ "Bengaluru Suburban Railway Project: 'Corridors 2 and 4 are priority now,' says minister V Somanna amid talks on axing Corridor 3". The Indian Express. 28 November 2024. Retrieved 15 January 2025.
  8. ^ Vivan, Sridhar. "Suburban rail project: All things considered". Bangalore Mirror. Retrieved 16 January 2025.
[edit]