List of generating stations in British Columbia
This is a list of electrical generating stations in British Columbia, Canada.
Hydroelectric
[edit]List of most of the hydroelectric generating stations in British Columbia.
Hydroelectric stations owned by BC Hydro
[edit]A list of all grid-tied hydroelectric generation stations in British Columbia operated by BC Hydro[1]
*Waneta Dam has been wholly owned by BC Hydro since July 2018[6] after Fortis BC finalized an agreement with Teck to sell its 66% interest in the dam, but BC Hydro had first rights to purchase the remaining 66% from its first 1/3 ownership deal.[7]
Privately-owned hydroelectric stations
[edit]This list includes all grid-connected hydroelectric generating stations not owned by the Crown Corporation BC Hydro. This list includes stations owned and operated by Independent Power Producers as well as by private utilities such as Nelson Hydro and FortisBC. In some cases, such as Lois Lake and Powell Lake, the electricity generated may be used solely for private industry, even if it is grid-connected.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Akolkolex | 50°49′21″N 118°01′46″W / 50.82250°N 118.02944°W | 10 | 1995 | TransAlta | [8] |
Arrow Lakes/Keenleyside Dam | 49°20′22″N 117°46′19″W / 49.33944°N 117.77194°W | 185 | 2002 | Columbia Power Corporation | [9] |
Ashlu Creek | 49°54′51″N 123°19′30″W / 49.91417°N 123.32500°W | 49.9 | 2010 | Innergex Renewable Energy | [10] |
Barr Creek | Tahsis | 4.4 | 2011 | Synex International | [11] |
Big Silver Creek | 49°41′33″N 121°51′37″W / 49.69250°N 121.86028°W | 40.6 | 2016 | Innergex Renewable Energy | [12] |
Bone Creek | Valemount | 19 | 2011 | TransAlta | [13] |
Bonnington Falls | Nelson | 16 | 1905 | Nelson Hydro | [14] |
Boston Bar Hydro (Scuzzy Creek) | 49°48′41″N 121°27′30″W / 49.81139°N 121.45833°W | 9 | 1995 | Boston Bar LP | [15] |
Boulder Creek | 50°38′7″N 123°24′12″W / 50.63528°N 123.40333°W | 25.3 | 2017 | Innergex Renewable Energy | [16] |
Box Canyon | 49°33′42″N 123°23′22″W / 49.56167°N 123.38944°W | 16 | 2017 | Elemental Energy | [17] |
Brandywine Creek | 50°03′28″N 123°07′52″W / 50.05778°N 123.13111°W | 7.6 | 2003 | Eco Flow Energy | [18] |
Brilliant Dam | 49°19′29″N 117°37′12″W / 49.3246884°N 117.6200366°W | 145 | 1944 | Columbia Power Corporation | [9] |
Brilliant Expansion | 49°19′23″N 117°37′11″W / 49.3230941°N 117.6198435°W | 120 | 2009 | Columbia Power Corporation | [9] |
Brown Lake | 54°01′38″N 129°50′37″W / 54.02722°N 129.84361°W | 7.2 | 1996 | Innergex Renewable Energy | [19] |
Canoe Creek | Ucluelet | 6 | 2010 | Tla-o-qui-aht First Nations | [20] |
Castle Creek | McBride | 8 | 2010 | Castle Mountain Hydro Ltd. | [21] |
China Creek | Port Alberni | 6.3 | 2005 | Upnit Power Corporation | [22] |
Coats IPP | Gabriola Island | 0.5 | 1985 | Crofter's Gleann Enterprises Ltd. | [15] |
Corra Linn Dam | 49°28′2″N 117°28′0″W / 49.46722°N 117.46667°W | 49 | 1932 | FortisBC | [23] |
Culliton Creek | 49°52′41″N 123°9′38″W / 49.87806°N 123.16056°W | 15 | 2016 | BluEarth Renewables | [24] |
Cypress Creek | Gold River | 2.8 | 2009 | Synex Energy Resources Ltd | [25] |
Dasque Creek | Terrace | 12 | 2015 | BluEarth Renewables | [26][27] |
Doran Taylor Hydro | Port Alberni | 6 | 1996 | Summit Power | [15] |
Douglas Creek (Kwalsa Energy) | 49°46′3″N 122°9′4″W / 49.76750°N 122.15111°W | 27.6 | 2010 | Innergex Renewable Energy | [28] |
Eagle Lake Micro Hydro | West Vancouver | 0.2 | 2003 | District of West Vancouver | [29] |
East Toba | Powell River | 147 | 2010 | Innergex Renewable Energy | [30] |
East Twin | McBride | 1.6 | 1991 | Brookfield Renewable Power | [31] |
Eldorado Reservoir | Kelowna | 1.1 | 2009 | District of Lake Country | [32] |
Fire Creek (Kwalsa Energy) | 49°46′59″N 122°14′5″W / 49.78306°N 122.23472°W | 25 | 2010 | Innergex Renewable Energy | [33] |
Fitzsimmons Creek | Whistler | 7.9 | 2010 | Innergex Renewable Energy | [34] |
Furry Creek | Furry Creek | 10.4 | 2004 | BluEarth Renewables | [35] |
Forrest Kerr Generating Station | 56°43′30″N 130°40′22″W / 56.72500°N 130.67278°W | 195 | 2014 | Northwest Hydro | [36] |
Haa-ak-suuk Creek Hydro | Ucluelet | 6 | 2010 | Tla-o-qui-aht First Nations | [37] |
Hauer Creek (aka Tete) | Valemount | 2.4 | 2007 | Hauer Creek Power Inc. | [15] |
Hunter Creek | Hope | 12 | 2018 | Connor, Clark & Lunn | [38][15] |
Hystad Creek | Valemount | 6 | 2002 | Brookfield Renewable Power | [31] |
Jamie Creek | 50°49′42″N 123°3′24″W / 50.82833°N 123.05667°W | 22 | 2014 | Boralex | [39] |
Jimmie Creek (Upper Toba Valley) | 50°34′11″N 124°4′20″W / 50.56972°N 124.07222°W | 62 | 2016 | Innergex Renewable Energy | [40] |
Kemano Generating Station | 53°33′48″N 127°56′32″W / 53.563278°N 127.942167°W | 896 | 1953 | Rio Tinto Alcan | [41] |
Kokish River | Port McNeil | 45 | 2014 | Brookfield Renewable Power | [42] |
Kwoiek Creek | 50°6′16″N 121°34′25″W / 50.10444°N 121.57361°W | 49.9 | 2013 | Innergex Renewable Energy, Kanaka Bar Indian Band | [43] |
Lamont Creek (Upper Stave Energy) | 49°33′58″N 122°21′1″W / 49.56611°N 122.35028°W | 28 | 2010 | Innergex Renewable Energy | [44] |
Lois Lake | Powell River | 37.4 | 1930 | Brookfield Renewable Power | [45] |
Long Lake (Cascade Creek) | Stewart | 31 | Regional Power Inc. | [46] | |
Lorenzetta Creek | Laidlaw | 3.2 | 2016 | Zella Hydro | [47] |
Lower Bear Creek | Sechelt | 10 | 2011 | Regional Power Inc. | [48] |
Lower Bonnington | 49°27′39″N 117°29′58″W / 49.46083°N 117.49944°W | 66 | 1925 | FortisBC | [23] |
Lower Clowhom | Sechelt | 11 | 2009 | BluEarth Renewables | [49] |
Mamquam Hydro | Squamish | 58 | 1996 | Atlantic Power Corporation | [50] |
Marion 3 Creek | Port Alberni | 4.6 | 2005 | Marion Creek Hydro Inc. | [51] |
McDonald Ranch | Grasmere | 0.1 | 1993 | McDonald Ranch & Timber Co. Ltd. | [15] |
McIntosh Creek | McBride | 1.2 | 2014 | Snowshoe Power Ltd. | [15] |
McLymont Creek | Stewart | 66 | 2015 | Northwest Hydro | [52] |
McNair Creek Hydro | Port Mellon | 9.8 | 2004 | BluEarth Renewables | [53] |
Mears Creek | Gold River | 3.8 | 2004 | Synex Energy Resources Ltd | [25] |
Middle Creek | Terrace | 8 | 2015 | BluEarth Renewables | [26][27] |
Miller Creek | Pemberton | 29.5 | 2003 | Innergex Renewable Energy | [54] |
Montrose Creek | Powell River | 88 | 2010 | Innergex Renewable Energy | [55] |
Morehead Creek | Williams Lake | 0.11 | 1994 | Morehead Valley Hydro | [56] |
Northwest Stave River | Mission | 17.5 | 2013 | Innergex Renewable Energy | [57] |
Pingston Creek | Revelstoke | 45 | 2003 | Brookfield Renewable Power, TransAlta | [58] |
Powell Lake | Powell River | 46 | 1911 | Brookfield Renewable Power | [45] |
Ptarmigan Creek | McBride | 3.6 | 1993 | Robson Valley Power Corp | [15] |
Raging River 2 | Port Alice | 8 | 2002 | Raging River Power & Mining Inc. | [15] |
Rutherford Creek | Mount Currie | 49.9 | 2004 | Innergex Renewable Energy | [59] |
Sakwi Creek | Agassiz | 5.5 | 2014 | Connor, Clark & Lunn | [60] |
Seaton Creek Hydro (Homestead) | New Denver | 0.3 | 1997 | Homestead Hydro Systems | [15] |
Sechelt Creek (Salmon Inslet) | Sechelt | 16.6 | 1997 | Capstone Infrastructure | [61][62] |
Silversmith | Sandon | 0.2 | 1897 | Silversmith Power & Light | [63][15] |
Skookum Creek | Squamish | 25 | 2014 | Eco Flow Energy | [64] |
Soo River | 50°13′34″N 122°54′41″W / 50.22611°N 122.91139°W | 13.1 | 1994 | Summit Power | [15] |
South Cranberry Creek | Revelstoke | 9 | 2008 | Advanced Energy Systems Ltd. | [15] |
South Slocan | 49°27′24″N 117°31′5″W / 49.45667°N 117.51806°W | 54 | 1928 | FortisBC | [23] |
South Sutton Creek | Port Alberni | 4.9 | 2005 | South Sutton Creek Hydro Inc. | [15] |
Stokke Creek (Kwalsa Energy) | 49°42′39″N 122°2′3″W / 49.71083°N 122.03417°W | 21 | 2010 | Innergex Renewable Energy | [65] |
Tipella Creek (Kwalsa Energy) | 49°44′27″N 122°9′44″W / 49.74083°N 122.16222°W | 16.7 | 2010 | Innergex Renewable Energy | [66] |
Tretheway Creek | Harrison Lake | 21.2 | 2015 | Innergex Renewable Energy | [67] |
Tyson Creek Hydro | Sechelt | 9.3 | 2009 | BluEarth Renewables | [68] |
Upper Bear Creek | Sechelt | 10 | 2012 | Regional Power Inc. | [48] |
Upper Bonnington | 49°27′36″N 117°29′1″W / 49.46000°N 117.48361°W | 66 | 1907 | FortisBC | [23] |
Upper Clowhom | Sechelt | 11 | 2009 | BluEarth Renewables | [49] |
Upper Lillooet River | Pemberton | 81.4 | 2017 | Innergex Renewable Energy | [69] |
Upper Mamquam | Squamish | 25 | 2005 | TransAlta | [70] |
Upper Stave River (Upper Stave Energy) | 49°37′22″N 122°26′58″W / 49.62278°N 122.44944°W | 33.5 | 2010 | Innergex Renewable Energy | [71] |
Volcano Creek | Stewart | 16 | 2015 | Northwest Hydro | [72] |
Walden North | Lillooet | 16 | 1993 | Innergex Renewable Energy | [15] |
Waneta Expansion | Trail | 335 | 2015 | FortisBC | [73][15] |
Winchie Creek | Ucluelet | 4.4 | 2018 | Tla-o-qui-aht First Nations | [74] |
Woodfibre Dam | Squamish | 1.6 | 1947 | Western Pulp LP | [15] |
Zeballos Lake | Zeballos | 21.85 | 2009 | Zeballos Lake Hydro LP | [15] |
Bremner Creek | Harrison Lake | 25 | Pacific Greengen Power | [75] | |
Trio Creek | Harrison Lake | 25 | Pacific Greengen Power | [75] | |
Chickwat Creek | Sechelt Inlet | 19 | BluEarth Renewables | [76] | |
Lower Ramona | Sechelt Inlet | 7 | BluEarth Renewables | [76] | |
Upper Ramona | Sechelt Inlet | 7 | BluEarth Renewables | [76] | |
Clemina Creek Hydro | Valemount | 10.5 | Sorgent.e Hydro Canada | [75] | |
Serpentine Creek Hydro | Blue River | 10.5 | Sorgent.e Hydro Canada | [75] | |
Wedgemount Creek | Whistler | 5.4 | Wedgemount Power LP | [75] | |
Gabion River EPA | Hartley Bay | 0.95 | Gitga'at Economic Partnership | [77][75] | |
Total operating stations (MW) | 3,705.6 |
Other renewables
[edit]Biomass, biogas and waste heat
[edit]List of all biomass, biogas and waste heat power plants in British Columbia.
Name | Location | Capacity (MW) | Date | Owner | Fuel | Ref |
---|---|---|---|---|---|---|
150 Mile House | 150 Mile House | 6 | EnPower | Waste heat | [78] | |
Armstrong Wood Waste Co-Gen | Armstrong | 20 | 2002 | Riverside Forest Products | Biomass | [15] |
Burnaby Incinerator (SEEGEN) | Burnaby | 22 | 2003 | Montenay Inc. | Biomass | [79] |
Cache Creek landfill gas utilization Plant | Cache Creek | 4.5 | 2015 | Wastech Management Services | Biogas | [80][15] |
Cariboo Pulp & Paper | Quesnel | 61.3 | 2012 | West Fraser Timber | Biomass | [81][15] |
Cedar Road LFG Inc. | Nanaimo | 1.4 | 2009 | Cedar Road LFG Inc. | Biogas | [82] |
Celgar Mill | Castlegar | 52 | Mercer International | Biomass | [83][84] | |
Chetwynd Biomass | Chetwynd | 13 | 2014 | West Fraser Timber | Biomass | [81][15] |
Conifex Bioenergy | Mackenzie | 36 | 2015 | Conifex | Biomass | [85][15] |
Crowsnest Pass | Sparwood | 7.1 | 2013 | Kensington Capital Partners | Waste Heat | [86][15] |
BioNorth Energy | Fort St. James | 40 | 2018 | BioNorth Energy LP | Biomass | [87][15] |
Fraser Lake Biomass | Fraser Lake | 13 | 2014 | West Fraser Timber | Biomass | [81][15] |
Fraser Richmond Soil and Fibre | Richmond | 1.03 | 2012 | Harvest Power | Biomass | [88] |
Greater Nanaimo PCC Cogeneration | Nanaimo | 0.355 | 2019 | Regional District of Nanaimo | Biogas | [15][89] |
Harmac Biomass | Nanaimo | 55 | 2014 | Nanaimo Forest Products Ltd. | Biomass | [90] |
Hartland Landfill Project | Victoria | 1.6 | Maxim Power | Biomass | [91] | |
Howe Sound Green Energy | Port Mellon | 112 | 2010 | Howe Sound Pulp and Paper Corporation | Biomass | [92][15] |
Intercon Green Power | Prince George | 31.7 | Canfor | Biomass | [15] | |
Kamloops Green Energy | Kamloops | 76 | Domtar | Biomass | [15] | |
LP Golden Biomass | Golden | 7.5 | Louisiana-Pacific Canada Ltd. | Biomass | [15] | |
Merritt Green Energy | Merritt | 40 | 2018 | Veolia | Biomass | [87][15] |
Nanaimo Reservoir No. 1 Energy Recovery | Nanaimo | 0.1 | 2014 | City of Nanaimo | Waste kinetic energy | [15] |
Northwood Green Power | Prince George | 63 | Canfor | Biomass | [15] | |
PGP Bio Energy Project | Prince George | 60 | Canfor | Biomass | [15] | |
Powell River Generation | Powell River | 48 | 2015 | Catalyst Paper Corporation | Biomass | [15] |
Savona Generating Station | Savona | 5.9 | 2008 | EnPower | Waste heat | [78] |
Skookumchuk Power Project | Skookumchuk | 51 | Tembec | Biomass | [15] | |
Tolko Kelowna Cogeneration | Kelowna | 14.9 | 2007 | Tolko Industries | Biomass | [15] |
Vancouver Landfill Project | Delta | 7.4 | 2003 | Maxim Power | Biomass | [93] |
Williams Lake Power Plant | Williams Lake | 66 | Atlantic Power Corporation | Biomass | [94] | |
Total operating stations (MW) | 837.5 |
Solar photovoltaic
[edit]List of all solar photovoltaic power stations in British Columbia.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
SunMine | Kimberley | 1.05 | 2015 | City of Kimberley | [95] |
Tsilhqot'in Solar Farm | Hanceville | 0.99 | 2019? | Tsilhqot’in Nation | [96] |
Total operating stations (MW) | 2.04 |
Wind
[edit]List of all wind farms in British Columbia.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Bear Mountain Wind Park | Dawson Creek | 102 | 2009 | AltaGas | [97] |
Cape Scott Wind Farm | Port Hardy | 99.2 | 2013 | GDF-Suez | [98] |
Dokie Wind | Chetwynd | 144 | 2011 | Innergex Renewable Energy | [99] |
Eye of the Wind | 49°22′15″N 123°5′56″W / 49.37083°N 123.09889°W | 1.5 | 2010 | Grouse Mountain | [100] |
Meikle Wind Farm | Tumbler Ridge | 179 | 2017 | Pattern Energy/PSP Investments | [101][102][103] |
Pennask Wind Farm | 49°55′26″N 120°6′14″W / 49.92389°N 120.10389°W | 15 | 2017 | Okanagan Wind | [104] |
Quality Wind Project | Tumbler Ridge | 142.2 | 2012 | Capital Power Corporation | [105] |
Shinish Creek Wind Farm | 49°39′39″N 120°8′13″W / 49.66083°N 120.13694°W | 15 | 2017 | Okanagan Wind | [104] |
Moose Lake Wind Project | Tumbler Ridge | 15 | 2019 | Boralex | [106][107] |
Septimus Creek Wind Farm | Taylor | 15 | 2018? | Zero Emission Energy Developments Inc. | [108] |
Total operating stations (MW) | 703.9 |
Natural gas
[edit]List of all natural gas power plants in British Columbia.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Fort Nelson Generating Station | 58°43′26″N 122°42′4″W / 58.72389°N 122.70111°W | 73.0 | 1999 | BC Hydro | [109][1] |
Houweling Nurseries Cogeneration | Delta | 8.8 | 2014 | Houweling's Tomatoes | [110] |
Island Generating Station | Campbell River | 275 | 2002 | Capital Power Corporation | [111] |
McMahon Cogeneration Plant | Taylor | 105 | 1993 | Heartland Generation | [112] |
Prince Rupert Generating Station | 54°17′0″N 130°18′25″W / 54.28333°N 130.30694°W | 46.0 | 1975 | BC Hydro | [109][1] |
Burrard Generating Station (decommissioned in 2016) | 49°17′56″N 122°53′25″W / 49.29889°N 122.89028°W | 950 | 1961 | BC Hydro | |
Total operating stations (MW) | 507.8 |
Off-grid
[edit]List of all power plants in British Columbia serving loads in communities not connected to the Western Interconnection power grid.
See also
[edit]- BC Hydro
- Columbia Power Corporation
- FortisBC
- Energy in Canada
- Independent power producers in British Columbia
- List of electrical generating stations in Canada
References
[edit]- ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at au av aw ax "Quick Facts For the Year Ended March 31, 2017" (PDF). BC Hydro. Retrieved 29 April 2018.
- ^ "Vancouver Island Facilities". BC Hydro. Retrieved 2024-08-21.
- ^ BC Hydro (2009-06-17), BC Hydro plans to purchase one-third interest in Waneta Dam, archived from the original on 2011-06-11, retrieved 2010-08-25
- ^ Teck Resources Limited (2010-03-05), Teck Announces Waneta Dam Sale Closing, archived from the original on 2010-07-14, retrieved 2010-08-25
- ^ "Site C Backgrounder" (PDF). BC Hydro. 23 June 2016. Archived from the original (PDF) on 23 June 2016. Retrieved 29 April 2018.
- ^ "BC Hydro purchases remaining interest in Waneta Dam and Generating Station". www.bchydro.com. Archived from the original on 28 January 2019. Retrieved 19 April 2022.
- ^ "Fortis and Teck Announce Waneta Dam Agreement".
- ^ "Akolkolex". TransAlta Renwables. Retrieved 29 April 2018.
- ^ a b c Columbia Power Corporation, Annual Report 2009/10 (PDF), archived from the original (PDF) on 2011-07-23, retrieved 2010-08-25
- ^ "Ashlu Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Operating Assests [sic]". Synex International Inc. Archived from the original on 2017-07-19. Retrieved 29 April 2018.
- ^ "Big Silver Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Bone Creek". TransAlta Renewables. Retrieved 29 April 2018.
- ^ City of Nelson, B.C., Electrical Services, archived from the original on 2013-04-03, retrieved 2010-08-27
- ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao "Independent Power Producers Currently Supplying power to BC Hydro" (PDF). BC Hydro. Retrieved 7 December 2018.
- ^ "Boulder Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Box Canyon Hydro". Elemental Energy. Retrieved 29 April 2018.
- ^ "Brandywine". Eco Flow Energy. Retrieved 29 April 2018.
- ^ "Brown Lake". Innergex Renewable Energy Inc. Retrieved 28 April 2018.
- ^ "Canoe Creek Hydro". Canoe Creek. Retrieved 29 April 2018.
- ^ "Castle Creek Hydroelectric Project, McBride, BC, Canada - Pelton Turbines". Dependable Turbines Ltd. Archived from the original on 1 July 2017. Retrieved 29 April 2018.
- ^ Hupacasath First Nation, Upnit Power Corporation, retrieved 2018-04-28
- ^ a b c d Fortis BC, Generation, archived from the original on 2010-11-25, retrieved 2010-08-24
- ^ "Culliton Creek Hydro Project". BluEarth Renewables. Retrieved 29 April 2018.
- ^ a b Synex International, Energy Projects, retrieved 2010-08-28
- ^ a b "Hydro-electric project sold near Terrace, B.C. - Terrace Standard". Terrace Standard. 2 March 2017. Retrieved 29 April 2018.
- ^ a b "Dasque-Middle Hydro Facility". BluEarth Renewables. Retrieved 29 April 2018.
- ^ "Douglas Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ BC Hydro (2010-03-26), Eagle Lake, archived from the original on 2011-06-11, retrieved 2010-08-28
- ^ "East Toba". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ a b "Valemount Hydro Operations" (PDF). Brookfield Power. Archived from the original (PDF) on 2012-03-11.
- ^ BC Hydro (2009-03-25), Lake Country's Positive Power, archived from the original on 2011-06-11, retrieved 2010-08-28
- ^ "Fire Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Fitzsimmons Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Furry Creek Hydro Facility". BluEarth Renewables. Retrieved 29 April 2018.
- ^ "Forrest Kerr Hydroelectric Facility". AltaGas. Archived from the original on 13 September 2018. Retrieved 29 April 2018.
- ^ "Haa-ak-suuk Creek Hydro". Canoe Creek. Retrieved 29 April 2018.
- ^ "Hunter Creek Hydro Project". Connor, Clark and Lunn. Retrieved 29 April 2018.
- ^ "Jamie Creek Hydroelectric". Boralex. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
- ^ "Jimmie Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ Rio Tinto, Power Operations/Watershed Management, retrieved 2018-04-28
- ^ "Kokish Hydroelectric". Brookfield Renewable. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
- ^ "Kwoiek Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Lamont Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ a b Brookfield Energy, Powell River Energy (PDF), archived from the original (PDF) on 2012-03-11, retrieved 2010-08-26
- ^ "Long Lake". Regional Power. Retrieved 29 April 2018.[permanent dead link]
- ^ "Lorenzetta Creek". Zella Hydro. 9 November 2013. Retrieved 29 April 2018.
- ^ a b "Bear Creek". Regional Power. Retrieved 29 April 2018.[permanent dead link]
- ^ a b "Clowhom Hydro Facility". BluEarth Renewables. Retrieved 29 April 2018.
- ^ Atlantic Power Corporation, Mamquam Power Plant: Squamish, B.C., retrieved 2018-04-28
- ^ BC Hydro, Marion 3 Hydro Project, archived from the original on 2011-06-11, retrieved 2010-08-28
- ^ "McLymont Creek Hydroelectric Facility". AltaGas. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
- ^ "McNair Creek Hydro Facility". BluEarth Renewables. Retrieved 29 April 2018.
- ^ "Miller Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Montrose Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ Morehead Valley Hydro (December 2009), Morehead Valley Hydro, retrieved 2010-08-26[permanent dead link]
- ^ "Northwest Stave River". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Pingston Creek Hydro". TransAlta Renwables. Retrieved 29 April 2018.
- ^ "Rutherford Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Sakwi Creek Hydro Project". Connor, Clark & Lunn. Retrieved 29 April 2018.
- ^ Earle, Steven (October 2003), "Sechelt Creek Hydro Project", Malaspina University-College, retrieved 2010-08-27
- ^ "Sechelt". Capstone Infrastructure. Retrieved 29 April 2018.
- ^ "Silversmith Powerhouse". Balance of Power. Retrieved 29 April 2018.
- ^ "Skookum". Eco Flow Energy. Retrieved 29 April 2018.
- ^ "Stokke Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Tipella Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Tretheway Creek". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Tyson Creek Hydro Facility". BluEarth Renewables. Retrieved 29 April 2018.
- ^ "Upper Lillooet River". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Upper Mamquam". TransAlta Renewables. Retrieved 29 April 2018.
- ^ "Upper Stave River". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ "Volcano Creek Hydroelectric Facility". AltaGas. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
- ^ "Waneta Dam Expansion". FortisBC. Archived from the original on 10 July 2018. Retrieved 29 April 2018.
- ^ "Winchie Creek Hydro Grand Opening". 10 July 2018. Retrieved 1 August 2019.
- ^ a b c d e f "Independent Power Producers (IPPs) with projects currently in development" (PDF). BCHydro. Retrieved 7 December 2018.
- ^ a b c "Narrows Inlet Hydro Project". BluEarth Renewables. Retrieved 29 April 2018.
- ^ a b Pollon, Christopher (21 March 2016). "In Hartley Bay, a Four-Decade Fight to Dump Diesel Continues | The Tyee". The Tyee.
- ^ a b EnPower Inc., EnPower Open House Info (PDF), archived from the original (PDF) on 2011-07-06, retrieved 2010-08-27
- ^ Greater Vancouver Regional District (June 2007), Waste to Energy (PDF), retrieved 2010-08-27
- ^ "Wastech opens British Columbia landfill gas plant | Biomassmagazine.com". Biomass Magazine. Retrieved 29 April 2018.
- ^ a b c "Current Initiatives". West Fraser. Retrieved 29 April 2018.
- ^ Cedar Road LFG, Landfill Biogas, archived from the original on 2011-06-02, retrieved 2010-08-28
- ^ "Biomass power stations in Canada", Power Plants Around the World, retrieved 2010-08-29
- ^ Mercer International Group, Zellstoff Celgar Mill, retrieved 2010-08-29
- ^ "Conifex Power". Conifex. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
- ^ "Compressor station's excess heat generates electricity. | TransCanada Corporation Blog". TransCanada. Archived from the original on 30 April 2018. Retrieved 29 April 2018.
- ^ a b "Fort St. James, British Columbia". Veolia North America. 3 February 2015. Retrieved 29 April 2018.
- ^ "Harvest "Energy Garden"". bcbioenergy.ca. Retrieved 29 April 2018.
- ^ "Greater Nanaimo Pollution Control Centre – Co-generation System – IWCD". Retrieved 2020-09-28.
- ^ BC Hydro, Harmac Biomass, British Columbia, retrieved 2018-01-08
- ^ Maxim Power Corp., Heartland Landfill Project, British Columbia, archived from the original on 2010-11-13, retrieved 2010-08-27
- ^ "BC Hydro supports Howe Sound Pulp and Paper's energy efficiency and clean power generation plans". BCHydro. 8 September 2010. Retrieved 29 April 2018.
- ^ Maxim Power Corp., Vancouver Landfill Project, British Columbia, archived from the original on 2010-11-13, retrieved 2010-08-27
- ^ Atlantic Power Corporation, Williams Lake Power Plant : Williams Lake, B.C., archived from the original on 2012-04-03, retrieved 2011-11-12
- ^ "SunMine | Kimberley, BC". SunMine | Kimberley, BC.
- ^ "BC Hydro Greenlights Energy Purchase Agreement for Tŝilhqot'in Solar Farm" (PDF). TŜILHQOT’IN NATIONAL GOVERNMENT. Archived from the original (PDF) on 3 May 2020. Retrieved 7 December 2018.
- ^ AltaGas, Bear Mountain Wind Park, retrieved 2010-08-22
- ^ Sea Breeze Power Corp., Cape Scott Wind Farm, retrieved 2015-02-24
- ^ "Dokie 1". Innergex Renewable Energy Inc. Retrieved 29 April 2018.
- ^ Grouse Mountain Resort, The Eye of the Wind: Fast Facts, retrieved 2010-08-22
- ^ Pattern Energy Group LP, Meikle Wind Construction Brochure (PDF), retrieved 2015-07-23
- ^ "Drones film Western Canada's largest wind farm, with 60+ wind turbines - Greentech Media". www.greentechmedia.com. Retrieved 2017-10-24.
- ^ "Pattern Energy Completes Acquisition of 51% of 179 MW Meikle Wind Power Facility". www.newswire.ca. Retrieved 2018-05-23.
- ^ a b "Welcome to Okanagan Wind | Okanagan Wind". Okanagan Wind. Retrieved 29 April 2018.
- ^ Capital Power Corporation, Quality Wind, archived from the original on 2012-12-13, retrieved 2013-01-02
- ^ "Wind, hydroelectric, solar and thermal projects | Boralex". www.boralex.com. Archived from the original on 2018-04-29. Retrieved 2018-04-29.
- ^ "Moose Lake Wind Farm Commences Commercial Operation April 1, 2019". Aeolis Wind Power Corporation. 2019-07-10. Retrieved 2023-01-01.
- ^ "Septimus Creek Wind Power Project | Zero Emission Energy Developments Inc". zeroemissiondevelopments.com.
- ^ a b "Thermal Generation". BC Hydro.
- ^ "Energy project: Delta, BC". www.houwelings.com.
- ^ Capital Power (2010-08-03), Capital Power to acquire Vancouver Island power plant, Edmonton, retrieved 2010-08-22
{{citation}}
: CS1 maint: location missing publisher (link)[permanent dead link] - ^ ATCO Power, McMahon Cogeneration Plant, retrieved 2010-08-21
- ^ "Vancouver Island First Nation celebrates new BC Hydro service". www.bchydro.com. 9 July 2012.
- ^ "British Columbia Hydro and Power Authority ~ Application for the Certificate of Public Convenience and Necessity for Jade City and Good Hope Lake Electrification Project ~ Final Order - British Columbia Utilities Commission". www.ordersdecisions.bcuc.com.
- ^ "Hluey Lakes". Capstone Infrastructure. Retrieved 29 April 2018.
- ^ a b "Wood chips help power Kwadacha First Nation, cutting carbon emissions". www.bchydro.com. Archived from the original on 2018-04-29. Retrieved 2018-04-29.
- ^ Malibu Hydro, Malibu Hydro quick Facts, retrieved 2010-08-27
- ^ "BC Hydro opens biodiesel generating station in McBride". www.bchydro.com. 18 October 2010.
- ^ Atlantic Power Corporation, Moresby Lake Power Plant: Haida Gwaii, B.C., archived from the original on 2012-04-03, retrieved 2011-11-12
- ^ Boralex, Ocean Falls Hydroelectric, archived from the original on 2018-04-30, retrieved 2018-04-29
- ^ Taylor, Lara (2009-11-09), "The Atlin hydro project – embodying First Nation principles", International Water Power and Dam Construction, archived from the original on 2011-06-14, retrieved 2010-08-28
- ^ "Toad River no longer on its own for power". www.bchydro.com. Archived from the original on 2018-04-29. Retrieved 2018-04-29.