Jump to content

Kazhakoottam flyover

From Wikipedia, the free encyclopedia

Kazhakoottam flyover
കഴക്കൂട്ടം മേൽപ്പാലം
Kazhakoottam Flyover.jpg
Route information
Maintained by NHAI
Length2.4 km (1.5 mi)
Existed3 December 2022 (2022-12-03)–present
Major junctions
South endTechno Park, phase 3
North endKazhakoottam
Location
CountryIndia
Major citiesThiruvananthapuram
Highway system

Kazhakoottam flyover is a flyover, that is a part of the NH 66 in Kerala, India.[1] The 2.7 km long four line flyover is the longest elevated highway in Kerala.[2] The flyover runs above the Kazhakootam junction, where the original national highway intersects with the bypass road.[3] Vehicles travelling from Kollam can enter the elevated highway near the CSI Mission Hospital in Kazhakootam.[4]

Overview

[edit]

The flyover is 22 metres wide and contains 61 pillars and 420 girders. Its development began in December 2018 at a cost of Rs 195.5 crore and the construction was supposed to be finished in two years.[5] It starts from CSI Mission Hospital at Kazhakkoottam to Techno Park phase-III. The construction of the flyover started with the announcement that it would be open to public in two years. But it got delayed due to many reasons including the Covid lockdown.[6] Originally, the flyover was scheduled to open on 1 November 2022. It was later moved to 15 November and again to 29 November. The inauguration date was again postponed to 2 December and the venue was decided. However the inauguration was cancelled due to the unavailability of Union minister Nitin Gadkari. As the protests intensified, the National Highways Authority of India opened the flyover unofficially to public on 3 December and official inauguration was postponed to 15 December.[7]

References

[edit]
  1. ^ "Inauguration of elevated highway at Kazhakoottam might take longer - The New Indian Express". www.newindianexpress.com. Retrieved 4 June 2023.
  2. ^ Daily, Keralakaumudi. "Kerala's longest 4-lane flyover at Kazhakootam opened unofficially". Keralakaumudi Daily. Retrieved 4 June 2023.
  3. ^ "Kazhakuttam flyover to be opened on November 15". The Hindu. 21 October 2022. ISSN 0971-751X. Retrieved 4 June 2023.
  4. ^ "Mukkola-Karode bypass to be opened in August - The New Indian Express". www.newindianexpress.com. Retrieved 4 June 2023.
  5. ^ "Kazhakkoottam elevated highway opened to public". The Times of India. 4 December 2022. ISSN 0971-8257. Retrieved 4 June 2023.
  6. ^ "Kazhakuttam elevated highway thrown open for traffic, without inauguration". The Hindu. 3 December 2022. ISSN 0971-751X. Retrieved 4 June 2023.
  7. ^ "Kazhakootam elevated highway opens for traffic without official inauguration". English.Mathrubhumi. 3 December 2022. Retrieved 4 June 2023.