Jiaxing Tram
You can help expand this article with text translated from the corresponding article in Chinese. (July 2021) Click [show] for important translation instructions.
|
Jiaxing Tram | |
---|---|
Overview | |
Area served | Jiaxing, Zhejiang, China |
Transit type | Tram |
Number of lines | 1 |
Number of stations | 12 |
Operation | |
Began operation | June 25, 2021 |
Operator(s) | Shanghai Keolis |
Number of vehicles | 20 |
Technical | |
System length | 11.2 km (7.0 mi) |
Jiaxing Tram (Chinese: 嘉兴有轨电车) is a tram system in Jiaxing, Zhejiang Province, China. There are seven lines planned for construction, which will span a length of about 98 kilometres (61 mi).[1]
History
[edit]Jiaxing first disclosed the rail plan in 2015.[2] On 16 September 2019, the Jiaxing Municipal People's Government approved the construction plan of the tram for 2019–2023.[3] The plan was also approved by the Zhejiang Provincial Development and Reform Commission on 9 December 2019, and the preliminary design of the first phase of the project was approved on 17 April 2020 by the same commission.[4]
On 28 December 2019, the tram started construction at the hub of the Jiaxing railway station,[5] and construction of the whole line of the first phase began in May 2020.[6]
On 5 November 2020, the first box substation of the first phase was moved to basis, and the leveling, installation, and connection of the equipment was completed.[7] On the 14th of the same month, the first set of turnouts began to be laid.[8] On the 17th, the platform design plan was released.[9] On the afternoon of 11 December, the beam and slab erection of the first bridge of the T1 line was completed. This marked that the rail laying construction of the first phase had entered a comprehensive stage.[10] In the same month, the Operations Control Center (OCC) completed the structural capping.[11] In January 2021, the subgrade pile foundation of the first phase was completed.[12]
The first phase, a 10.6 kilometres (6.6 mi) long stretch from Jiaxing South railway station to Fanggong Road Binhe Road stop (Chinese: 纺工路滨河路站), opened on 25 June 2021.[13] From opening until 7 October 2021, passengers could travel for free.[14] It extended for 1 station (0.6 kilometres (0.37 mi)) to Jiaxing railway station on 15 January 2022.[15]
References
[edit]- ^ "怎么规划?工期多长?十问嘉兴有轨电车线" (in Chinese). 8 September 2019. Archived from the original on 6 March 2022. Retrieved 6 March 2022.
- ^ "线网规划方案来了,轨道交通还会远吗? - 嘉兴在线" (in Chinese). 12 June 2015. Archived from the original on 6 October 2017.
- ^ "嘉兴市现代有轨电车线网规划获批复通过". Changping Information Network (in Chinese). 29 March 2020.[permanent dead link ]
- ^ "嘉兴有轨电车T1、T2一期工程初步设计获省发改委批复". Zhejiang Online (in Chinese). 18 April 2020.[permanent dead link ]
- ^ "最新线路图曝光!沪嘉城际最新消息来了". mp.weixin.qq.com (in Chinese). 28 December 2019.
- ^ "关注!嘉兴有轨电车一期开工,施工期间如何通行,交通引导措施怎么看?". Jiaxing Online (in Chinese). 15 May 2020. Archived from the original on 26 December 2021. Retrieved 1 May 2022.
- ^ "嘉兴有轨电车又有新进度". Jiaxing Daily (in Chinese). 7 November 2020.
- ^ "首组道岔开始铺设!嘉兴有轨电车项目快速推进". mp.weixin.qq.com (in Chinese). 14 November 2020.
- ^ "嘉兴有轨电车站台,长这样!方案设计图要不要看". mp.weixin.qq.com (in Chinese). 17 November 2020.
- ^ "计划明年2月完成铺轨!嘉兴有轨电车一期工程的最新进展都在这里..." mp.weixin.qq.com (in Chinese).
- ^ "来了,来了,他们来了!嘉兴有轨电车项目又迎来一批重量级参观团队". mp.weixin.qq.com (in Chinese). 21 December 2020.
- ^ "决战一季度 誓夺开门红!刚刚,嘉兴市有轨电车一期工程吹响冲锋号角". mp.weixin.qq.com (in Chinese). 11 January 2021.
- ^ "浙江首条有轨电车一期工程示范段今天开通 出站徒步10分钟可到南湖纪念馆" (in Chinese). Xinmin.cn. 25 June 2021. Retrieved 26 June 2021.
- ^ "嘉兴市有轨电车一期工程示范段开通公告" (in Chinese). QQ. 24 June 2021. Retrieved 26 June 2021.
- ^ "有轨电车嘉兴火车站开通载客公告". 14 January 2022.