Jump to content

Geary Bus Rapid Transit

From Wikipedia, the free encyclopedia
Geary Bus Rapid Transit
Red transit-only lane on Geary near Masonic Av, October 2018
Overview
OwnerSan Francisco Municipal Transportation Agency
LocaleSan Francisco, California, United States
Stations26
Service
TypeBus rapid transit
SystemSan Francisco Municipal Railway
ServicesMuni: 38, 38R, 38AX, 38BX
History
OpenedFebruary 2021 (2021-02)
Route diagram

Salesforce Transit Center
Fremont Street
1st Street/Battery Street
2nd Street
Montgomery Street
Bay Area Rapid Transit
Kearny Street
Stockton Street
T Third Street
Powell Street
Leavenworth Street
Van Ness Avenue
Van Ness Bus Rapid Transit
O'Farrell Street
Laguna Street
Fillmore Street
Divisadero Street
Masonic Avenue
Arguello Boulevard
6th Avenue
Park Presidio Boulevard
20th Avenue
25th Avenue
33rd Avenue
dedicated lanes
street running
36th Avenue
39th Avenue
Point Lobos Avenue
42nd Avenue
44th Avenue
45th Avenue
46th Avenue
48th Avenue

The Geary Bus Rapid Transit project added bus rapid transit features to San Francisco Municipal Railway bus lines along Geary Boulevard. The corridor serves routes 38, 38R, 38AX, 38BX which combined to serve 52,900 daily riders in 2019, the most of any corridor in the city. The project added transit-only lanes, painted red, along many sections of Geary between the Salesforce Transit Center and 33rd Avenue. After the project’s completion, over 75% of Geary corridor now has transit lanes.[1]

The original plan called for consolidating some stops in a center-running configuration, as was done for the Van Ness Bus Rapid Transit project, but in early 2021, as part of emergency changes related to the COVID-19 pandemic, SFMTA added side-running bus lanes along Geary. Based on the success of these "temporary emergency transit lanes" in increasing bus speeds with minimal impacts to car traffic, SFMTA made the side-running bus lanes permanent. Side-running transit lanes are less efficient than center-running configurations, and so this decision has been criticized as a downgrade from the original plan.[2][3][4]

Project details

[edit]

Geary BRT provides transit service improvements primarily through the use of bus lanes. The project plans for red-painted bus priority lanes on most of the route of the 38-Geary along Geary Boulevard. These lanes run along the side of the street adjacent to the curb or parking spaces on the section of the corridor east of Stanyan Street, which includes neighborhoods such as the Tenderloin and Japantown. The bus lanes run in the center of the street west of Stanyan to around 27th Avenue in the Richmond District and Laurel Heights. The bus lanes then switch to side running from 27th Avenue to 34th Avenue.

The project will also implement transit improvements such as bulb-outs for bus stops and traffic signal updates. The combination of bus lanes and other improvements is expected to reduce travel times on the 38-Geary by 10-20% when traveling the entire route from 48th Avenue to the Salesforce Transit Center.[5] This translates to a travel time reduction of roughly 10 minutes on a trip that takes around one hour. The travel time reduction is expected to be 15-30% between Van Ness Avenue and 25th Avenue.[5]

In addition to transit service upgrades, the project is intended to improve pedestrian safety on the corridor. For example, the project includes several upgraded pedestrian crossings adjacent to Japantown.[6] Additionally, the project will narrow parts of Geary Boulevard to two lanes of automobile traffic down from three lanes.[7]

History

[edit]

Previous use as a streetcar corridor

[edit]

In the early 1900s, the Geary Boulevard corridor was served by streetcar routes such as the A Geary-10th Avenue, B Geary, and C Geary-California lines. These streetcar lines were all eliminated by 1956 as buses replaced streetcars in San Francisco.[8] Subsequently, replacement rail service on Geary was proposed multiple times, such as in the original plans for the Bay Area Rapid Transit system.

Geary corridor planning

[edit]

In 1989, the city of San Francisco approved Proposition B, a ballot measure that approved a half-cent sales tax for transportation. The expenditure plan that was included in the proposition prioritized the planning and implementation of transit expansion along four transit corridors including Geary Boulevard.[9] Subsequently, the San Francisco County Transportation Authority (SFCTA) conducted a study, titled the Four Corridor Plan, to determine the details of the transportation improvements along the corridors included in the Proposition B plan.[10] The study called for a subway-surface rail line along Geary.

Refocused to bus rapid transit

[edit]
Construction work in 2020

With the Proposition B tax expiring in 2010, the voters of San Francisco approved Proposition K in 2003 that extended the tax and established a new expenditure plan. The new plan funded the Geary Bus Rapid Transit project and mandated the implementation of a bus rapid transit network, with the first two lines consisting of Geary BRT and Van Ness Bus Rapid Transit. Proposition K mandates that Geary BRT be built to "rail-ready standards" to accommodate a planned future conversion to light rail.[11]

Subsequently, in 2007 the SFCTA published a feasibility report for the project.[12] Starting in 2008, the SFCTA started an environmental impact review process. In 2017, the SFCTA approved the final environmental impact report for the project after thirteen years of studying the feasibility and impacts for the proposed bus infrastructure.[13] With that milestone, the project was handed off to the San Francisco Municipal Transportation Agency for design and implementation.

Construction was broken up into two separate, complementary projects.

The first phase of work, called the Geary Rapid Project, would install red bus lanes, upgrade traffic signals, add new crosswalks, and build bus bulbs from Market Street west to Stanyan Street. The Environmental Impact Statement for the first phase was approved by the federal Department of Transportation on June 1, 2018.[14] The final design of the first phase, after several revisions based on community input, was approved by the SFMTA board in August 2018.[7][15] Construction on the project started in early 2019 and concluded in fall 2021.[16]

The second phase, called the Geary Boulevard Improvement Project, picked up at the end of the first phase at Stanyan Street and would take the improvements further west to 34th Avenue. One of the major differences from the first phase would be the addition of "center-running" transit lanes (similar to those built for the Van Ness Bus Rapid Transit project) in the middle of the street between Arguello Boulevard and 28th Avenue.

At the start of the COVID-19 pandemic, the second phase was in the detailed design phase. That work was put on pause, as SFMTA focused on installing Temporary Emergency Transit Lanes (TETL) on several transit corridors. The TETL project installed side-running transit-only lanes on Geary over much of the footprint of the second phase: between Stanyan Street and 15th Avenue, and between 24th Avenue and 33rd Avenue. The project also installed several "transit head start" signals and wooden bus bulbs.[17] SFMTA found that the temporary side-running lanes kept bus travel times from increasing as auto congestion returned.[18] The SFMTA considered these results to be satisfying enough to retain the side-running transit lanes permanently instead of constructing a center-running corridor as originally planned. The second phase of the project will now focus on making the temporary improvements permanent.[19]

See also

[edit]

References

[edit]
  1. ^ "Geary Boulevard Transit Lanes" (PDF). July 20, 2021.
  2. ^ Lazarus, Anthony (June 4, 2021). "SF's 20-Year Drive for a Faster Geary Bus Heads to the Curb". Medium. Retrieved April 9, 2024.
  3. ^ Rudick, Roger (August 16, 2023). "Commentary: It's Hard to Celebrate the Pyrrhic Victory on Geary". Streetsblog SF. Retrieved April 9, 2024.
  4. ^ Schneider, Benjamin (May 27, 2021). "Geary BRT Changes Lanes". SF Weekly. Retrieved April 9, 2024.
  5. ^ a b San Francisco County Transportation Authority (June 2018). Geary Corridor Bus Rapid Transit Project Final Environmental Impact Statement (EIS) (PDF) (Report). Retrieved July 5, 2018.
  6. ^ Rudick, Roger (April 10, 2018). "Update on 38 Geary Bus". Streetsblog SF. Retrieved July 5, 2018.
  7. ^ a b Sisto, Carrie (August 2, 2018). "Tonight: SFMTA to preview final plans for first phase of 38-Geary makeover". Hoodline. Retrieved August 14, 2018.
  8. ^ "What Might Have Been: Geary". September 22, 2008. Retrieved May 8, 2018.
  9. ^ "San Francisco Voter Information Pamphlet" (PDF). November 7, 1989. Archived from the original (PDF) on June 17, 2019. Retrieved May 8, 2018.
  10. ^ San Francisco County Transportation Authority (June 1995). "Four Corridor Plan". Retrieved May 8, 2018.
  11. ^ "San Francisco Voter Information Pamphlet" (PDF). November 4, 2003. Archived from the original (PDF) on June 17, 2019. Retrieved May 8, 2018.
  12. ^ San Francisco County Transportation Authority (June 2007). "Geary Corridor Bus Rapid Transit Study, Feasibility Study Final Report" (PDF). Retrieved May 8, 2018.
  13. ^ Rodriguez, Joe Fitzgerald (5 January 2017). "Transit officials approve key milestone for Geary bus project". San Francisco Examiner. Retrieved 1 August 2017.
  14. ^ Fitzgerald Rodriguez, Joe (June 21, 2018). "Geary Bus Rapid Transit gets environmental 'green light to advance' from Feds". San Francisco Examiner.
  15. ^ Swan, Rachel (August 22, 2018). "Muni approves bus lanes on Geary as critics see red over private shuttle use". San Francisco Chronicle. Retrieved August 22, 2018.
  16. ^ "Geary Rapid Project". San Francisco Municipal Transportation Agency. 13 May 2013. Retrieved 2022-01-13.
  17. ^ "38 Geary Temporary Emergency Transit Lanes". San Francisco Municipal Transportation Agency. 24 August 2020.
  18. ^ "Muni Emergency Measures Point to Longer Term Transit Goals" (Press release). San Francisco Municipal Transportation Agency. April 19, 2021.
  19. ^ "Geary Boulevard Improvement Project". San Francisco Municipal Transportation Agency. 7 December 2017. Retrieved 2022-01-13.
[edit]