Draft:I-395 Signature Bridge (The Fountain)
Submission declined on 21 February 2025 by AlphaBetaGamma (talk). This submission reads more like an essay than an encyclopedia article. Submissions should summarise information in secondary, reliable sources and not contain opinions or original research. Please write about the topic from a neutral point of view in an encyclopedic manner.
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
| ![]() |
Comment: "This article will..." Please delete that, we really don't include mentions like that. ABG (Talk/Report any mistakes here) 03:01, 21 February 2025 (UTC)
This article will be about the ongoing project of the I-395 Signature Bridge, also referred to as "The Fountain".
The article will introduce the project and its location in downtown Miami. It will mention the architect Donald MacDonald, and his firm's collaboration with the Florida Department of Transportation in constructing the project. The introductory description will also mention the start and proposed end date, key features of the project, such as its arches, and perhaps some recognition that the project has already received. Include photo of location for clarity.
Creation
[edit]Talks about Donald Macdonald architecture firm, why the project was made, and how the design was made. Include images of proposed renderings.
Construction
[edit]Planning
[edit]Overall construction process thus far, why the construction has faced barriers and will be taking longer to complete, and how the construction process has been planned to progress year-by-year. Include images from construction.
Traffic Concerns
[edit]The project's effects on traffic and the overall downtown Miami scene. Refer to how it has affected daily commute and find some news reports related to how the construction cite is effecting day-to-day life. Possibly include image of traffic/detoured highway interchanges.
Initial sources provided below.
References
[edit]- ^ Connecting Miami I-395/SR 836/I-95 Design Build Project. (2025, January 30). I-395/SR 836/I-95 Design Build Project. https://i395-miami.com
- ^ FHWA - Center for Innovative Finance Support - Project Profiles. (2017). Dot.gov. https://www.fhwa.dot.gov/ipd/project_profiles/fl_i395_sr83611_i95.aspx
- ^ SR-836/I-395/I-95 Financial Projects Number(s). (n.d.). Retrieved February 14, 2025, from https://www.fdotmiamidade.com/userfiles/files/Signatue%20Bridge%20Renderings_AWdMJV.pdf
- ^ Salamak, Marek, and Klaudiusz Fross. “Bridges in Urban Planning and Architectural Culture.” Procedia Engineering, vol. 161, 2016, pp. 207–212, https://doi.org/10.1016/j.proeng.2016.08.530.