Jump to content

District Court Pune metro station

Coordinates: 18°31′37″N 73°51′29″E / 18.52689°N 73.85802°E / 18.52689; 73.85802
From Wikipedia, the free encyclopedia
(Redirected from Civil Court metro station)

Civil Court
logo of Pune Metro Pune Metro station
Civil Court metro station under construction
General information
LocationShivajinagar, Pune, Maharashtra 411001
Coordinates18°31′37″N 73°51′29″E / 18.52689°N 73.85802°E / 18.52689; 73.85802
Owned byMaharashtra Metro Rail Corporation Limited (MAHA-METRO)
Operated byPune Metro
Line(s)Purple Line Aqua Line
PlatformsSide platform
Platform-1 → Ramwadi
Platform-2 → Vanaz
Island platform
Platform-3 → Swargate
Platform-4 → PCMC Bhavan
Tracks4
Construction
Structure typeUnderground, Elevated, Double track
Platform levels4
AccessibleYes Disabled access
Other information
Station codeCVC
History
Opened1 August 2023; 17 months ago (2023-08-01)
Electrified25 kV 50 Hz AC overhead catenary
Services
Preceding station logo of Pune Metro Pune Metro Following station
PMC Bhavan
towards Vanaz
Aqua Line Mangalwar Peth
towards Ramwadi
Shivaji Nagar
towards PCMC Bhavan
Purple Line Kasba Peth
towards Swargate
Location
Map

District Court Pune (formerly known as "Civil Court Metro Station") is a metro station that facilitates cross-platform interchange between the Aqua Line and the Purple Line in Pune, India. The station was opened on 1st August 2023 as an extension of Pune Metro Phase I.[1] This station will also serve as a future interchange for Line 3 of the Pune Metro.[2] The platform on the Purple Line is one of the deepest in India at a depth of 33m (108 ft.). The architectural design of the station's roof permits natural sunlight to penetrate directly to the underground platforms.[3]

Station layout

[edit]

Aqua Line - Station Layout

District Court Pune track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Ramwadi
Next Station: Mangalwar Peth
Platform 2
Westbound
Towards ← Vanaz
Next Station: PMC Bhavan
Side platform | Doors will open on the left Disabled access
L3

Purple Line - Station Layout

District Court Pune track layout
P4
P3
Station with two tracks and one Island platform
G Street level Exit/ Entrance
M Mezzanine Fare control, station agent, Ticket/token, shops
P Platform 3
Southbound
Towards → Swargate
Next Station: Kasba Peth
Island platform | Doors will open on the right Disabled access
Platform 4
Westbound
Towards ← PCMC Bhavan
Next Station: Shivaji Nagar

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "PM to flag off metro trains marking inauguration of completed sections of Pune Metro". pib.gov.in. 30 July 2023. Retrieved 3 August 2023.
  2. ^ Gadkari, Siddharth (27 July 2023). "It's official, PM to open Pune Metro service on two sections on Aug 1". Hindustan Times. Retrieved 3 August 2023.
  3. ^ "Civil Court interchange, where elevated & underground lines meet". The Times of India. 11 August 2023. ISSN 0971-8257. Retrieved 12 August 2023.
[edit]