Jump to content

Cibitung–Cilincing Toll Road

From Wikipedia, the free encyclopedia
Cibitung-Cilincing Toll Road
Map
Route information
Maintained by PT Cibitung Tanjung Priok Port Tollways (CTP)
Length34 km (21 mi)
Existed2021–present
Major junctions
Southeast endCibitung
Major intersections
Northwest endCilincing
Location
CountryIndonesia
Provinces
Major cities
Highway system

Cibitung-Cilincing Toll Road is a 34-kilometre-long (21 mi) toll road which extends from Cibitung, West Java, to Cilincing, Jakarta in Indonesia. This is one of the toll roads which are part of the Jakarta Outer Ring Road 2.[1] This toll road is expected to reduce the burden of freight and vehicle transportation on the Jakarta–Cikampek Toll Road that crosses the Cawang area.[2][3]

History

[edit]

The toll road consists of four sections. Construction of this toll road has been delayed by eight years due to land acquisition problems. The toll road was expected to be operational by 2019.[4][5] The first section of the toll road has been operating since 31 July 2021,[6] followed by the inaugurations of sections 2 and 3 on 20 September 2022.[7]

Sections

[edit]

Section

Route

Length

Inauguration Date

Section 1 Cibitung–Telaga Asih 2.96 km (1.84 mi) 31 July 2021
Section 2 Telaga Asih–Tambelang 9.41 km (5.85 mi) 20 September 2022
Section 3 Tambelang–Mekarjaya 13.09 km (8.13 mi)
Section 4 Mekarjaya–Cilincing 8.56 km (5.32 mi) 1 April 2023

Exits

[edit]
Marunda Toll Gate
ProvinceLocationkmmiExitNameDestinationsNotes
West JavaWest Cikarang, Bekasi Regency7647 Cimanggis–Cibitung Toll Road (Under construction)
764776Cibitung Interchange
794979Telaga Asih Toll Gate
  • Cibitung
  • Telaga Asih
North Tambun, Bekasi Regency895589Gabus Toll Gate
  • North Tambun
  • Tambelang
Small vehicles only
Tarumajaya, Bekasi Regency10364103Tarumajaya Toll Gate
  • Tarumajaya
  • Babelan
  • Marunda
10565Marunda Toll Gate
DKI JakartaCilincing, North Jakarta11068110Semper Interchange
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

[edit]

References

[edit]
  1. ^ "Waskita Pastikan Tol Cibitung-Cilincing Beroperasi Tahun Depan". Kompas. Retrieved October 2, 2018.
  2. ^ "Economy in brief: Cibitung-Cilincing toll-road project to start 2016". The Jakarta Post. Retrieved October 2, 2018.
  3. ^ "Pelindo II to Buy 45% of Cibitung-Cilincing Toll Road". Jakarta Globe. Retrieved October 2, 2018.
  4. ^ "Waskita Karya Kempit 55% Saham Jalan Tol Cibitung-Cilincing". CNN Indonesia. Retrieved October 2, 2018.
  5. ^ "Agar Arus Logistik Lancar, Truk Butuh jalan Tol Baru". Industri.Bisnis.Com. Retrieved October 2, 2018.
  6. ^ "BEROPERASI & BELUM BERTARIF, SEKSI 1 TOL CIBITUNG - CILINCING RUAS CIBITUNG - TELAGA ASIH". bpjt.pu.go.id (in Indonesian). Badan Pengatur Jalan Tol. 31 July 2022. Retrieved 13 October 2022.
  7. ^ "Tingkatkan Mobilitas Logistik, Presiden Jokowi Resmikan Jalan Tol Cibitung-Cilincing dan Tol Serpong-Balaraja Seksi 1" [Improving Logistics Mobility, President Jokowi Inaugurates Cibitung-Cilincing Toll Road and Serpong-Balaraja Toll Road Section 1]. bpjt.pu.go.id (in Indonesian). Badan Pengatur Jalan Tol. 21 September 2022. Retrieved 28 September 2022.
[edit]