Jump to content

Belden Bly Bridge

Coordinates: 42°27′3.0″N 70°58′44.5″W / 42.450833°N 70.979028°W / 42.450833; -70.979028
From Wikipedia, the free encyclopedia
Belden G. Bly Bridge

Fox Hill Bridge
Coordinates42°27′3.0″N 70°58′44.5″W / 42.450833°N 70.979028°W / 42.450833; -70.979028
CarriesSalem Turnpike / Western Ave. / MA State Route 107
CrossesSaugus River
Characteristics
DesignCantilever bridge, Scherzer Rolling Lift (1912-2013)
Cable-Lift Draw Bridge (2013-present)
History
Fabrication byMassachusetts Department of Public Works
Construction end1912
ClosedNovember 9, 2013
Location
Map

Belden G. Bly Bridge originally known as the Fox Hill Bridge was built in 1912 and renamed in 1985 in honor of former member of the Massachusetts House of Representatives Belden Bly. At the time of its demolition, the bridge was the oldest cantilever bridge in the United States still in use as well as the oldest Scherzer Rolling Lift under the supervision of the Massachusetts Department of Public Works. Streetcar tracks originally ran across the bridge.[1]

This bridge closed for several months for repairs on 15 December 2008. The MBTA bus routes 424, 450, 455 and 459 had their routes detoured through Austin Square in West Lynn through Ballard Street in Saugus.

While the bridge was scheduled to be closed for replacement starting in early 2013, problems with the temporary cable-lift draw bridge delayed the project significantly. (On June 3, 2013, a hinge failed on the temporary draw span during what was supposed to have been final testing.) The temporary bridge was finally opened on Nov. 9, 2013, and the 1912 span closed permanently.

Construction began on the replacement bridge (also to be named the Belden G. Bly Bridge) in 2020. The replacement bridge will be of a single leaf bascule bridge design.[2] As of January 2023, the temporary bridge is expected to remain in use until March 2025, at which time the replacement bridge is expected to be completed.[3]

[edit]

References

[edit]
  1. ^ Rapoport, Irwin. "Demolition Crews Proceed Carefully to Avoid Premature Collapse of Old Span". ConstructionEquipmentGuide.com. Retrieved 11 December 2023.
  2. ^ "Information about project #604952". hwy.massdot.state.ma.us. MA DOT. Retrieved 16 May 2024.
  3. ^ McKenna, Charlie (13 January 2023). "Temporary Route 107 bridge to remain in use until 2025". The Daily Item. itemlive. Retrieved 17 January 2023.