Assabet River Rail Trail
The Assabet River Rail Trail (ARRT) is a partially-completed multi-use rail trail running through the cities and towns of Marlborough, Hudson, Stow, Maynard, and Acton, Massachusetts, United States. It is a conversion of the abandoned Marlborough Branch of the Fitchburg Railroad. The right-of-way parallels the Assabet River in the trail's midsection. At the north end it veers north to the South Acton MBTA train station while the south end veers south to Marlborough. When fully completed, the end-to-end length will be 12.5 miles (20.1 km). As of June 2020, the southwest 5.1-mile (8.2 km) portion of the trail from Marlborough to Hudson and the northeast 3.4-mile (5.5 km) portion running from the South Acton MBTA station to the Maynard–Stow border are completed. No current plans exist for paving the 4.0-mile (6.4 km) gap in Stow and Hudson between the two trail ends.[1]
History
[edit]The Marlborough Branch railroad was progressively lengthened so that it reached from the Acton station to Maynard by 1849, extended through Stow to Hudson in 1850, and reached its Marlborough terminus in 1855. Passenger service was discontinued in the reverse fashion, such that Marlborough's service ended in 1930, Hudson and Stow in 1939, and finally Maynard in 1958. However the Boston and Maine Railroad, later subsidized by the MBTA, used the Marlborough Branch to provide passenger service to Hudson from 1958-1965 via the Central Mass Branch.[2]: 161 The branch continued providing freight service until the final train to Hudson in 1980.[2]: 137 The last remaining rails and railroad ties in Acton and Maynard were removed in 2014.[1]
In 1851 transcendentalist Henry David Thoreau, who lived in Concord, wrote in his famous journal about a trek to Boon's Pond—today known as Lake Boon—which on the return included a walk along the railroad tracks now replaced by the trail.[3]
Status
[edit]Assabet River Rail Trail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sources: Assabet River Rail Trail (ARRT),[4] Mass Central Rail Trail maps,[5] Maynard Historical Society Archives[6] and Final Report of the Ad-hoc Bicycle and Pedestrian Committee[7] |
Plans to convert the Marlborough Branch tracks into a rail trail date back to at least 1992.[8][9] A January/February 1997 feasibility study conducted by the Commonwealth of Massachusetts supported the project's viability.[8][9] The five municipalities through which the Marlborough Branch rails ran voted to approve the project in 1998.[8][9]
In 2005 the south end of the trail, measuring 5.1 miles (8.2 km), was completed from Marlborough to a parking lot on Wilkins Street in northeast Hudson. Construction of 3.4 miles (5.5 km) of the north end of the trail – from the South Acton train station running south to central Maynard and then southwest to White Pond Road at the Maynard–Stow border – began in 2016. The groundbreaking ceremony for the north end was held on July 21, 2016.[10] The ribbon-cutting event celebrating the completion was held August 10, 2018.[1] Completion of the north end left a 4.0-mile (6.4 km) gap between the Marlborough–Hudson and Acton–Maynard portions of the trail. The east end of this gap is a dirt road known as Track Road, but no bridges over the two crossings of the Assabet River exist and some parts are on private property. Maps and updates are available on the ARRT website.[11]
There are four boat launches providing canoe and kayak access to the Assabet River on the trail: one in Hudson at Main Street Landing; one in Stow at Magazu Landing; and two in Maynard, at White Pond Road and Ice House Landing. A map of locations of these boat launches is available on the ARRT website.[12]
In the fall of 2018, a volunteer organization and project called Trail of Flowers began planting thousands of blooming bulbs and perennial flowering plants, bushes, and trees along the trail. Plantings in 2018 were limited to Maynard, but expanded to Acton in 2019, Marlborough in 2020, and will add Hudson in the future. Donations cover the cost of the bulbs and perennials, and volunteers plant them.[13]
Future connections
[edit]A separate April 1997 feasibility study conducted by the Massachusetts Central Transportation Planning Staff proposed a Central Massachusetts Rail Trail extending continuously from the town of Berlin to Alewife station and Minuteman Bikeway in Cambridge.[14] The proposed trail included the Marlborough Branch right-of-way in Hudson, meaning the Central Massachusetts Rail Trail would connect to and overlap with the then-proposed Assabet River Rail Trail.[14]
In 2010 the Massachusetts Department of Conservation and Recreation proposed a similar Mass Central Rail Trail—Wayside (MCRT) project to extend the existing portions of the MCRT in Waltham to Berlin and connect to the ARRT in Hudson.[15]: A-33
In October 2022, 7.6 miles of the Mass Central Rail Trail—Wayside in Sudbury and Hudson began construction, which will create this connection to the ARRT when completed.[16]
In 2021, an easement to extend the ARRT to Track Road in Stow was negotiated.[17] In 2023, this extension was in the design phase.[18]
References
[edit]- ^ a b c Assabet River Rail Trail
- ^ a b The Boston & Maine Railroad Historical Society, Inc. (2008). The Central Mass (Second ed.). Brimfield, MA: Marker Press. p. 1. ISBN 978-0-9662736-3-2.
- ^ Thoreau's walk to Boon's Pond (pages 452–462)[1]
- ^ "Assabet River Rail Trail Maps". Assabet River Rail Trail. Retrieved December 13, 2020.
- ^ "Mass Central Rail Trail Map". TK Maps. Retrieved December 13, 2020.
- ^ "Boston & Maine Railroad Train Wreck - 1911 Maynard, Mass". Maynard Historical Society. 1999–2013. Retrieved August 31, 2021.
- ^ "Final Report of the Ad-hoc Bicycle and Pedestrian Committee" (PDF). Town of Hudson, Massachusetts. January 23, 2023. Retrieved October 6, 2024.
- ^ a b c "Assabet River Rail Trail About Us". Assabet River Rail Trail. Retrieved June 21, 2020.
- ^ a b c "Assabet River Rail Trail Implementation Plan" (PDF). Town of Acton Website. June 2001. pp. 2–4. Retrieved June 21, 2020.
- ^ "Groundbreaking ceremony set for Assabet River Rail Trail, July 21". Wicked Local Maynard. July 19, 2016.
- ^ "Assabet River Rail Trail Status Chart". Assabet River Rail Trail. Retrieved June 21, 2020.
- ^ "Assabet River Rail Trail River Access Map". Assabet River Rail Trail. Retrieved June 21, 2020.
- ^ "Trail of Flowers". Trail of Flowers. Retrieved June 21, 2020.
- ^ a b Buckley Lewis, Cathy; Kirk, James E. (April 1997). "Central Massachusetts Rail Trail Feasibility Study" (PDF). Metropolitan Area Planning Council. Central Transportation Planning Staff. Retrieved June 21, 2020.
- ^ Massachusetts Department of Conservation and Recreation (November 2013). "Mass Central Rail Trail – Wayside Branch Expanded Environmental Notification Form" (PDF). Retrieved June 21, 2020.
- ^ "3 Major MetroWest Trail Projects Are Under Construction In 2023 - Streetsblog Massachusetts". mass.streetsblog.org. March 7, 2023. Retrieved September 7, 2023.
- ^ Antelman, Dakota (August 19, 2021). "Officials eye Assabet River Rail Trail extension near Hudson/Stow border". Community Advocate. Retrieved November 28, 2023.
- ^ "Project information". hwy.massdot.state.ma.us. Retrieved November 28, 2023.