According to Igor Miroshnichenko, General Director of OJSC Vostochnaya Verf, by 2010, Vostochnaya Verf in terms of production volume reached 80-85% of the production level before restructuring.[1]
By the end of 2013, the full computerization of the enterprise was completed. The enterprise's capacities allow building ships and ships with a displacement of up to 2.5 thousand tons.[4]
In 2015, Oleg Sidenko was appointed Acting Director General of Vostochnaya Verf.[5]
Construction of the Project 03182Mikhail Barskovsmall sea tanker was laid down on 27 October 2015, developed at Zelenodolsk Design Bureau as a multipurpose vessel of reinforced ice class for transporting liquid and dry cargo, performing rescue operations with the ability to receive helicopters, including unmanned aerial vehicles, continues. building No. 9001.[6]
As of January 2016, at Vostochnaya Verf for the Federal Border Service of the FSB of Russia, PSKR Project 22460 Dozornyy was being built.
On 6 February 2018, a small sea tanker of Project 03182, serial number 9002, was laid down on the slipway.[7]
On October 13, 2022, Vostochnaya Verf filed an application with the Primorsky Krai Arbitration Court with a request to declare it bankrupt. According to the results of 2021, the company received a large loss and cannot pay for its obligations.[8]