Line 8 (Shenzhen Metro)
Appearance
(Redirected from Line 8, Shenzhen Metro)
Line 8 of the Shenzhen Metro (also known as the Yantian line) is an East-West line with 11 stations from Liantang to Xiaomeisha. It opened on 28 October 2020 between Liantang and Yantian Road, with a length of 12.367 km (7.7 mi) and a total of 7 stations.[2] Line 8 is the first line to serve Yantian District. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station.
Phase 2 opened on 27 December 2023, which extended the line from Yantian Road to Xiaomeisha.[3]
Timeline
[edit]Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Liantang — Yantian Road | 28 October 2020 | 12.367 km (7.68 mi) | 7 | Phase 1 |
Yantian Road — Xiaomeisha | 27 December 2023 | 7.96 km (4.95 mi) | 4 | Phase 2 |
Service routes
[edit]- Chiwan — Xiaomeisha (trains are through service with Line 2 after Liantang)
Stations
[edit]Service routes |
Station name | Connections | Nearby bus stops | Distance | Location | |||
---|---|---|---|---|---|---|---|---|
English | Chinese | |||||||
Trains continue to Chiwan station via Line 2 | ||||||||
● | Liantang | 莲塘 | 2 (through service) | 27 57 113 381 B621 B625 M207 M468 | 0 | 0 | Luohu | |
● | Wutong Mountain South | 梧桐山南 | 27 57 69 85 111 113 308 M103 M133 M191 M199 M205 M207 M364 M437 M468 M520 M555 | 1.46 | 1.46 | |||
● | Shatoujiao | 沙头角 | 68 85 308 B619 M199 M205 M437 M520 | 4.32 | 5.78 | Yantian | ||
● | Haishan | 海山 | 68 85 308 358 308-Fast(358快线)E26 M191 M196 M199 M205 M288 M362 M437 M444 M520 | 1.57 | 7.35 | |||
● | Yantian Port West | 盐田港西 | 68 308 358 308-Fast(358快线)E26 M191 M196 M199 M205 M288 M362 M437 M444 M520 | 1.24 | 8.59 | |||
● | Shenwai Senior Campus | 深外高中 | B925 C4 M348 M444 M465 | 2.68 | 11.27 | |||
● | Yantian Road | 盐田路 | 68 85 358 B676 B925 B927 M205 M205X(M205大站快车)M348 M380 M444 Dameisha-holiday-express-1(大梅沙假日专线1) | 1.41 | 12.68 | |||
● | Hong'anwei | 洪安围 | 1.10 | 13.78 | ||||
● | Yantianxu | 盐田墟 | 1.14 | 14.92 | ||||
● | Dameisha | 大梅沙 | 3.58 | 18.50 | ||||
● | Xiaomeisha | 小梅沙 | 2.14 | 20.64 | ||||
Phase 3
[edit]Phase 3 is under construction. It will extend the line from Xiaomeisha to Xichong and will open in 2025.
Station name | Connections | Location | |
---|---|---|---|
English | Chinese | ||
Xichong | 溪涌 | 32 (through service) | Dapeng New District |
Rolling stock
[edit]Type | Date of manufacture | Series | Sets | Serial number | Assembly | Notes |
---|---|---|---|---|---|---|
Type A | 2019–2020 | Type A stock | 24 | 258–281[801-824] | Tc+Mp+M+M+Mp+Tc | Manufactured by CRRC Zhuzhou Electric Locomotive Works |
Notes
[edit]References
[edit]- ^ "深圳地铁8号线将于2020年10月28日正式投入运营". 2019-08-13.
- ^ a b "深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代". 2019-08-01.
- ^ "深圳地铁8号线二期开通日期". citys114. 2023-03-13. Retrieved 2023-04-23.