Jump to content

File:DOE-national-transmission-needs-draft-interregional-transfer-capacity-needs-by-2035.jpg

From Wikipedia, the free encyclopedia

Original file (1,960 × 766 pixels, file size: 101 KB, MIME type: image/jpeg)

Summary

[edit]

Bar graph of interregional transfer capacity, currently installed versus that needed in order to achieve ~95% decarbonization of the electrical power sector by 2035.

From the Draft 2023 national Transmission Needs Study

Source: US Department of Energy Grid Deployment Office; https://www.energy.gov/sites/default/files/2023-05/Draft-2023-National-Transmission-Needs-Study-Fact-Sheet_April-2023.pdf

Licensing

[edit]

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current01:41, 13 November 2023Thumbnail for version as of 01:41, 13 November 20231,960 × 766 (101 KB)Anon423 (talk | contribs)Bar graph of interregional transfer capacity, currently installed versus that needed in order to achieve ~95% decarbonization of the electrical power sector by 2035. From the Draft 2023 national Transmission Needs Study Source: US Department of Energy Grid Deployment Office; https://www.energy.gov/sites/default/files/2023-05/Draft-2023-National-Transmission-Needs-Study-Fact-Sheet_April-2023.pdf
No pages on the English Wikipedia use this file (pages on other projects are not listed).