Jump to content

Doolittle Maintenance and Storage Facility

Coordinates: 37°43′42″N 122°11′59″W / 37.72833°N 122.19972°W / 37.72833; -122.19972
From Wikipedia, the free encyclopedia
(Redirected from Doolittle (BART station))
Doolittle
Doolittle Maintenance and Storage Facility in 2018
General information
LocationHegenberger Drive at Doolittle Drive
Oakland, California
Coordinates37°43′42″N 122°11′59″W / 37.72833°N 122.19972°W / 37.72833; -122.19972
Platforms2 side platforms (proposed)
Other information
StatusMaintenance and storage center
Infill station proposed
Proposed services
Preceding station Bay Area Rapid Transit Following station
Oakland International Airport
Terminus
Oakland Airport Connector
Proposed station
Coliseum
Terminus
Location
Map

The Doolittle Maintenance and Storage Facility (also known as the Wheelhouse) is the operations management center for the BART Oakland Airport Connector. The building is used for storage and maintenance of the Cable Liner cars, and is also the powerhouse for the system's 12-foot (3.7 m) drive wheels. It was initially planned to also be a passenger station; that was cut due to lack of funding but may be added as an infill station in the future. Vehicles stop at the structure in both directions to switch cable loops, but do not allow passengers to disembark.

History

[edit]
Trackway at the MSF, with planned platform site at left

The Final Environmental Impact Report for the Oakland Airport Connector automated guideway transit (people mover) system, released in 2002, called for two intermediate stations on the line at Doolittle Drive and Edgewater Drive. Those stations were intended to support the City of Oakland's plans to improve development along Hegenberger Road – an area largely occupied by airport hotels and industrial businesses.[1] A November 2006 addendum removed the proposed Edgewater Drive station after transit-oriented development plans fell through, and relocated the Maintenance and Storage Facility (MSF) on a short spur adjacent to the Doolittle Drive station to reduce costs.[1]

By the time construction began in 2013, several additional design changes were made: the MSF was reduced in size and relocated to between the tracks, and the station at Doolittle Drive was deferred until funding was available.[2] A former union house was demolished to provide space for the MSF.[1] The Oakland Airport Connector opened on November 22, 2014, with only the two terminal stations.[3] If funding is secured, an infill station can be added at Doolittle Drive by constructing platforms, a below-track mezzanine, and stairs and elevators for access.[4]

References

[edit]
  1. ^ a b c "Draft BART-Oakland International Airport Connector Final Environmental Impact Report/Final Environmental Impact Statement Addendum" (PDF). San Francisco Bay Area Rapid Transit District. November 2006.
  2. ^ "BART to OAK Fact Sheet" (PDF). San Francisco Bay Area Rapid Transit District. 2014.
  3. ^ "New BART service to Oakland International Airport now open" (Press release). San Francisco Bay Area Rapid Transit District. November 21, 2014.
  4. ^ "BART to OAK Service Frequently Asked Questions" (PDF). San Francisco Bay Area Rapid Transit District. May 2016.
[edit]

Media related to Doolittle Maintenance and Storage Facility at Wikimedia Commons