Jump to content

List of rail transit stations in the Klang Valley area

From Wikipedia, the free encyclopedia

The Klang Valley, Malaysia, is served by the Klang Valley Integrated Transit System, consisting of various rail transit services. As of 2024, the system encompasses 528.4 kilometres (328.3 mi) of grade-separated railway with 197 operational stations.[Note 1]

The following are lists of rail transit stations in the Klang Valley, sorted in to alphabetical order and also according to their respective routes.

List of stations in alphabetical order

[edit]

Stations with two or more station codes indicate an interchange station, offering same-building transfers between rail lines. However, not all lines have linked paid areas within their interchange stations as different rail operators have different ticketing systems, requiring passengers to tap out of one system and tap in again when transferring between lines.

Stations with the same name but listed separately serve the same area, however, essentially operate as different stations due to not being in the same station building.

Station Station Code Photo Line(s) Operator Type Local authority Opened Remarks
Abdullah Hukum  KD01 
 KJ17 
Abdullah Hukum 2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
KTM
Rapid Rail
Commuter rail
LRT
Kuala Lumpur 1 September 1998 (LRT)
28 October 2018 (KTM Komuter)
Alam Megah  KJ35  Alam Megah 5 Kelana Jaya Line Rapid Rail LRT Shah Alam 30 June 2016
Alam Sutera  SP21  Alam Sutera 4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 31 October 2015
Ampang  AG18  Ampang 3 Ampang Line Rapid Rail LRT Ampang Jaya 16 December 1996
Ampang Park (LRT)  KJ9  Ampang Park 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999 Walking distance to  PY20  Ampang Park (MRT)
Ampang Park (MRT)  PY20  12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023 Walking distance to  KJ9  Ampang Park (LRT)
Angkasapuri  KD02  Angkasapuri 2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 14 August 1995
Ara Damansara  KJ26  Ara Damansara 5 Kelana Jaya Line Rapid Rail LRT Petaling Jaya 30 June 2016
Asia Jaya  KJ21  Asia Jaya 5 Kelana Jaya Line Rapid Rail LRT Petaling Jaya 1 September 1998
Awan Besar  SP19  Awan Besar 4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 31 October 2015
Bandaraya  AG6 
 SP6 
Bandaraya 3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 16 December 1996 Walking distance to  KA03  Bank Negara
Bandar Puteri  SP27  Bandar Puteri 4 Sri Petaling Line Rapid Rail LRT Subang Jaya 31 March 2016
Bandar Tasik Selatan  KB04 
 KT2 
 SP15 
Bandar Tasik Selatan 1 Batu Caves-Pulau Sebang Line
4 Sri Petaling Line
7 KLIA Transit
KTM
Rapid Rail
ERL
Airport rail link
Commuter rail
LRT
Kuala Lumpur 10 November 1995 (KTM Komuter)
11 July 1998 (LRT)
20 June 2002 (ERL)
There is no paid-area-to-paid-area integration. Walkways connect the three stations.
Bandar Tun Hussein Onn  KG29  Bandar Tun Hussein Onn 9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Bandar Tun Razak  SP14  Bandar Tun Razak 4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 11 July 1998
Bandar Utama  KG09  Bandar Utama 9 Kajang Line Rapid Rail MRT Petaling Jaya 16 December 2016
Bangi  KB09  Bangi 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kajang 1995
Bangsar (Bank Rakyat-Bangsar)  KJ16  Bangsar 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
Bank Negara  KA03  Bank Negara 1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTM Commuter rail Kuala Lumpur 14 August 1995 Walking distance to  AG6  SP6  Bandaraya
Batang Benar  KB10  Batang Benar 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 1995
Batang Kali  KA12  Batang Kali 2 Tanjung Malim-Port Klang Line KTM Commuter rail Hulu Selangor 21 April 2007
Batu 11 Cheras  KG30  Batu 11 Cheras 9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Batu Caves  KC05  Batu Caves 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Selayang April 2010
Batu Kentonmen  KC02  Batu Kentonmen 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur April 2010
Batu Tiga  KD10  Batu Tiga 2 Tanjung Malim-Port Klang Line KTM Commuter rail Shah Alam 1995
Bukit Badak  KD13  Bukit Badak 2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Bukit Bintang (MRT) (Pavilion-Bukit Bintang)  KG18A  Bukit Bintang MRT 9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017 Walking distance to  MR6  Bukit Bintang (Monorail)
Bukit Bintang Monorail  MR6  Bukit Bintang Monorail 8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003 Walking distance to  KG18A  Bukit Bintang (MRT)
Bukit Dukung  KG31  Bukit Dukung 9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Bukit Jalil  SP17  Bukit Jalil 4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 11 July 1998
Bukit Nanas  MR8  Bukit Nanas 8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003 Walking distance to  KJ12  Dang Wangi
Cahaya  AG17  Cahaya 3 Ampang Line Rapid Rail LRT Ampang Jaya 16 December 1996
Cempaka  AG16  Cempaka 3 Ampang Line Rapid Rail LRT Ampang Jaya 16 December 1996
Chan Sow Lin  AG11 
 SP11 
 PY24 
Chan Sow Lin 3 Ampang Line
4 Sri Petaling Line
12 Putrajaya Line
Rapid Rail LRT
MRT
Kuala Lumpur 16 December 1996
(LRT)
16 March 2023
(MRT)
Cheras  SP12  Cheras 4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 11 July 1998
Chow Kit  MR10  Chow Kit 8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
Cochrane  KG21  Cochrane 9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017
Conlay (Conlay-Kompleks Kraf)  PY22  Conlay 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Cyberjaya City Centre (Cyberjaya City Centre-Limkokwing)  PY40  Cyberjaya City Centre 12 Putrajaya Line Rapid Rail MRT Sepang 16 March 2023
Cyberjaya Utara (Cyberjaya Utara-Finexus)  PY39  Cyberjaya Utara 12 Putrajaya Line Rapid Rail MRT Sepang 16 March 2023
Damai  KJ8  Damai 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999
Damansara Damai  PY05  Damansara Damai 12 Putrajaya Line Rapid Rail MRT Petaling Jaya 16 June 2022
Dang Wangi  KJ12  Dang Wangi 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999 Walking distance to  MR8  Bukit Nanas
Dato' Keramat  KJ7  Dato' Keramat 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999
Glenmarie (CGC-Glenmarie)  KJ27  Glenmarie 5 Kelana Jaya Line Rapid Rail LRT Petaling Jaya 30 June 2016
Gombak  KJ1  Gombak 5 Kelana Jaya Line Rapid Rail LRT Selayang 1 June 1999
Hang Tuah (BBCC-Hang Tuah)  AG9 
 SP9 
 MR4 
Hang Tuah 3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
Rapid Rail LRT
Monorail
Kuala Lumpur 16 December 1996 (LRT)
31 August 2003 (Monorail)
Hospital Kuala Lumpur  PY18  Hospital Kuala Lumpur 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Imbi  MR5  Imbi 8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
IOI Puchong Jaya  SP24  IOI Puchong Jaya 4 Sri Petaling Line Rapid Rail LRT Subang Jaya 31 March 2016
Jalan Ipoh  PY15  Jalan Ipoh 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Jalan Kastam  KD18  Jalan Kastam 2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Jalan Templer  KD05  Jalan Templer 2 Tanjung Malim-Port Klang Line KTM Commuter rail Petaling Jaya 14 August 1995
Jelatek  KJ6  Jelatek 5 Kelana Jaya Line Rapid Rail LRT Ampang Jaya 1 June 1999
Jinjang  PY11  Jinjang 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 June 2022
Kajang  KB06 
 KG35 
Kajang 1 Batu Caves-Pulau Sebang Line
9 Kajang Line
KTM
Rapid Rail
Commuter rail
MRT
Kajang 10 November 1995 (KTM Komuter)
17 July 2017 (MRT)
Kajang 2  KB07  Kajang 2 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kajang 13 March 2023
Kampung Baru  KJ11  Kampung Baru 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999
Kampung Batu  KC03 
 PY13 
Kampung Batu 1 Batu Caves-Pulau Sebang Line
12 Putrajaya Line
KTM
Rapid Rail
Commuter rail
MRT
Kuala Lumpur April 2010 (KTM Komuter)
16 June 2022 (MRT)
Kampung Dato Harun  KD06  Kampung Dato Harun 2 Tanjung Malim-Port Klang Line KTM Commuter rail Petaling Jaya 14 August 1995
Kampung Raja Uda  KD17  Kampung Raja Uda 2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Kampung Selamat  PY03  Kampung Selamat 12 Putrajaya Line Rapid Rail MRT Petaling Jaya 16 December 2016
Kelana Jaya  KJ24  Kelana Jaya 5 Kelana Jaya Line Rapid Rail LRT Petaling Jaya 1 September 1998
Kentonmen  PY14  Kentomen 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Kepong  KA06  Kepong 2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 1995
Kepong Baru  PY10  Kepong Baru 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 June 2022
Kepong Sentral  KA07  Kepong Sentral 2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 1 July 2006 Connecting station with  PY08  Sri Damansara Timur
Kerinchi  KJ18  Kerinchi 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
Kinrara BK5  SP22  Kinrara BK5 4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 31 October 2015
Klang  KD14  Klang 2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
KLCC  KJ10  KLCC 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999 Suria KLCC
KLIA T1  KE23 
 KT5 
KLIA 6 KLIA Ekspres
7 KLIA Transit
ERL Airport rail link Sepang 14 April 2002 (KLIA Ekspres)
20 June 2002 (KLIA Transit)
KLIA T2  KE3 
 KT6 
KLIA 2 6 KLIA Ekspres
7 KLIA Transit
ERL Airport rail link Sepang 1 May 2014
Kota Damansara (Kota Damansara-Thomson Hospital)  KG06  Kota Damansara 9 Kajang Line Rapid Rail MRT Petaling Jaya 16 December 2016
Kuala Kubu Bharu  KA14  Kuala Kubu Bharu 2 Tanjung Malim-Port Klang Line KTM Commuter rail Hulu Selangor 5 January 2008
Kuala Lumpur  KA02  Kuala Lumpur 1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTM Commuter rail Kuala Lumpur 14 August 1995
Kuala Lumpur Sentral (KL Sentral)  KA01 
 KS01 
 KJ15 
 KE1 
 KT1 
KL Sentral 1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
10 KL Sentral-Terminal Skypark Line
KTM
Rapid Rail
ERL
Airport rail link
Commuter rail
LRT
Kuala Lumpur 2001 (Kelana Jaya Line, Batu Caves-Pulau Sebang Line, Tanjung Malim-Port Klang Line)
14 April 2002 (KLIA Ekspres)
20 June 2002 (KLIA Transit)
1 May 2018 (KL Sentral-Skypark Line)
There is no paid-area-to-paid-area integration between the different operators in KL Sentral. Walkways to  MR1  KL Sentral Monorail and  KG15  Muzium Negara
The LRT part of this station is known as KL Sentral-redONE
Kuala Lumpur Sentral (KL Sentral) Monorail  MR1  KL Sentral Monorail 8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003 Walkways to  KA01  KS01  KJ15  KE1  KT1  KL Sentral and  KG15  Muzium Negara
Kuang  KA09  Kuang 2 Tanjung Malim-Port Klang Line KTM Commuter rail Selayang 1995
Kuchai  PY27  Kuchai 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Kwasa Damansara  KG04 
 PY01 
Kwasa Damansara 9 Kajang Line
12 Putrajaya Line
Rapid Rail MRT Shah Alam 16 December 2016 (Kajang Line)
16 June 2022 (Putrajaya Line)
Kwasa Sentral  KG05  Kwasa Sentral 9 Kajang Line Rapid Rail MRT Shah Alam 16 December 2016
Labu  KB12  Labu 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 1995
Lembah Subang  KJ25  Lembah Subang 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 30 June 2016
Maharajalela  MR3  Maharajalela 8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
Maluri (AEON-Maluri)  AG13 
 KG22 
Maluri 3 Ampang Line
9 Kajang Line
Rapid Rail LRT
MRT
Kuala Lumpur 16 December 1996 (LRT)
17 July 2017 (MRT)
The MRT station is also known as AEON-Maluri
Masjid Jamek  AG7 
 SP7 
 KJ13 
Masjid Jamek 3 Ampang Line
4 Sri Petaling Line
5 Kelana Jaya Line
Rapid Rail LRT Kuala Lumpur 16 December 1996
(Ampang & Sri Petaling Lines)
1 June 1999
(Kelana Jaya Line)
Medan Tuanku  MR9  Medan Tuanku 8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
Mentari  SB2  Mentari B1 BRT Sunway Line Rapid Bus BRT Petaling Jaya 2 June 2015
Merdeka  KG17  Merdeka 9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017 Integrated (paid-area-to-paid-area) link to  AG8  SP8  Plaza Rakyat
Metro Prima  PY09  Metro Prima 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 June 2022
Mid Valley  KB01  Mid Valley 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur 23 August 2004
Miharja  AG12  Miharja 3 Ampang Line Rapid Rail LRT Kuala Lumpur 16 December 1996
Muhibbah  SP20  Muhibbah 4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 31 October 2015
Mutiara Damansara  KG08  Mutiara Damansara 9 Kajang Line Rapid Rail MRT Petaling Jaya 16 December 2016
Muzium Negara  KG15  Muzium Negara 9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017 Walkways to  KA01  KS01  KJ15  KE1  KT1  KL Sentral and  MR1  KL Sentral Monorail
Nilai  KB11  Nilai 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 1995
Padang Jawa  KD12  Padang Jawa 2 Tanjung Malim-Port Klang Line KTM Commuter rail Shah Alam 1995
Pandan Indah  AG15  Pandan Indah 3 Ampang Line Rapid Rail LRT Ampang Jaya 16 December 1996
Pandan Jaya  AG14  Pandan Jaya 3 Ampang Line Rapid Rail LRT Ampang Jaya 16 December 1996
Pantai Dalam  KD03  Pantai Dalam 2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 14 August 1995
Pasar Seni  KJ14 
 KG16 
Pasar Seni 5 Kelana Jaya Line
9 Kajang Line
Rapid Rail LRT
MRT
Kuala Lumpur 1 September 1998 (LRT)
17 July 2017 (MRT)
Walking distance to  KA02  Kuala Lumpur Station
Persiaran KLCC  PY21  Persiaran KLCC 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Petaling  KD04  Petaling 2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 14 August 1995
Port Klang (Pelabuhan Klang)  KD19  Port Klang 2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Phileo Damansara  KG12  Phileo Damansara 9 Kajang Line Rapid Rail MRT Kuala Lumpur 16 December 2016
Plaza Rakyat  AG8 
 SP8 
Plaza Rakyat 3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 16 December 1996 Integrated (paid-area-to-paid-area) link to  KG17  Merdeka
Puchong Perdana  SP28  4 Sri Petaling Line Rapid Rail LRT Subang Jaya 30 June 2016
Puchong Prima  SP29  Puchong Prima 4 Sri Petaling Line Rapid Rail LRT Subang Jaya 30 June 2016
Pudu  AG10 
 SP10 
Pudu 3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 16 December 1996
Pulau Sebang/Tampin  KB18  Pulau Sebang/Tampin 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Alor Gajah 10 October 2015
Pusat Bandar Damansara (Pavilion-Pusat Bandar Damansara)  KG13  PBD 9 Kajang Line Rapid Rail MRT Kuala Lumpur 16 December 2016
Pusat Bandar Puchong  SP25  Pusat Bandar Puchong 4 Sri Petaling Line Rapid Rail LRT Subang Jaya 31 March 2016
Putra  KA04  Putra 1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTM Commuter rail Kuala Lumpur 1995
Putra Heights  SP31 
 KJ37 
Putra Heights 4 Sri Petaling Line
5 Kelana Jaya Line
Rapid Rail LRT Subang Jaya 30 June 2016
Putra Permai  PY37  Putra Permai 12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
Putrajaya Sentral  KT3 
 PY41 
Putrajaya Sentral 7 KLIA Transit
12 Putrajaya Line
ERL
Rapid Rail
Airport rail link
MRT
Putrajaya 20 June 2002
(ERL)
16 March 2023
(MRT)
The KLIA Transit part of this station is known as Putrajaya & Cyberjaya
PWTC  AG4 
 SP4 
PWTC 3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 11 July 1998
Raja Chulan  MR7  Raja Chulan 8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
Raja Uda (Raja Uda-UTM)  PY19  Raja Uda 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Rasa  KA13  Rasa 2 Tanjung Malim-Port Klang Line KTM Commuter rail Hulu Selangor 21 April 2007
Rawang  KA10  Rawang 2 Tanjung Malim-Port Klang Line KTM Commuter rail Selayang 1995
Rembau  KB17  Rembau 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Rembau 10 October 2015
Salak Selatan (KTM)  KB03  Salak Selatan KTM 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur 1995
Salak Selatan (LRT)  SP13  Salak Selatan LRT 4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 11 July 1998
Salak Tinggi  KT4  Salak Tinggi 7 KLIA Transit ERL Airport rail link Sepang 20 June 2002
Segambut  KA05  Segambut 2 Tanjung Malim-Port Klang Line KTM Commuter rail Kuala Lumpur 1995
Semantan  KG14  Semantan 9 Kajang Line Rapid Rail MRT Kuala Lumpur 16 December 2016
Senawang  KB15  Senawang 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 14 May 2011
Sentul (KTM)  KC01  Sentul 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur 1995
Sentul (LRT)  AG2 
 SP2 
Sentul 3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 11 July 1998
Sentul Barat  PY16  Sentul Barat 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Sentul Timur  AG1 
 SP1 
Sentul Timur 3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 11 July 1998
Seputeh  KB02  Seputeh 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur 1995
Serdang  KB05  Serdang 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Subang Jaya 1995
Serdang Jaya  PY33  Serdang Jaya 12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
Serdang Raya Selatan  PY32  Serdang Raya Selatan 12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
Serdang Raya Utara  PY31  Serdang Raya Utara 12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
Seremban  KB14  Seremban 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 1995
Serendah  KA11  Serendah 2 Tanjung Malim-Port Klang Line KTM Commuter rail Hulu Selangor 21 April 2007
Seri Setia  KD07  Seri Setia 2 Tanjung Malim-Port Klang Line KTM Commuter rail Petaling Jaya 14 August 1995
Setia Jaya (Sunway-Setia Jaya)  KD08 
 SB1 
Setia Jaya 2 Tanjung Malim-Port Klang Line
B1 BRT Sunway Line
KTM
Rapid Bus
Commuter rail
BRT
Petaling Jaya 14 August 1995
(KTM Komuter)
2 June 2015
(BRT)
The BRT part of the station is known as Sunway-Setia Jaya.
Setiawangsa  KJ5  Setiawangsa 5 Kelana Jaya Line Rapid Rail LRT Ampang Jaya 1 June 1999
Shah Alam  KD11  Shah Alam 2 Tanjung Malim-Port Klang Line KTM Commuter rail Shah Alam 14 August 1995
South Quay-USJ 1  SB6  Sunway Lagoon B1 BRT Sunway Line Rapid Bus BRT Subang Jaya 2 June 2015
Sri Damansara Barat  PY06  Sri Damansara Barat 12 Putrajaya Line Rapid Rail MRT Petaling Jaya 16 June 2022
Sri Damansara Sentral  PY07  Sri Damansara Sentral 12 Putrajaya Line Rapid Rail MRT Petaling Jaya 16 June 2022
Sri Damansara Timur  PY08  Sri Damansara Timur 12 Putrajaya Line Rapid Rail MRT Petaling Jaya 16 June 2022 Connecting station with  KA07  Kepong Sentral
Sri Delima  PY12  Sri Delima 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 June 2022
Sri Rampai  KJ4  Sri Rampai 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 24 December 2010
Sri Raya  KG28  Sri Raya 9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Sri Petaling  SP18  Sri Petaling 4 Sri Petaling Line Rapid Rail LRT Kuala Lumpur 11 July 1998
SS15  KJ29  SS15 5 Kelana Jaya Line Rapid Rail LRT Subang Jaya 30 June 2016
SS18  KJ30  SS18 5 Kelana Jaya Line Rapid Rail LRT Subang Jaya 30 June 2016
Stadium Kajang  KG34  Stadium Kajang 9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Subang Alam  KJ36  Subang Alam 5 Kelana Jaya Line Rapid Rail LRT Shah Alam 30 June 2016
Subang Jaya  KD09 
 KS02 
 KJ28 
Subang Jaya 2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
10 KL Sentral-Terminal Skypark Line
KTM
Rapid Rail
Commuter rail
LRT
Airport rail link
Subang Jaya 14 August 1995 (Tanjung Malim-Port Klang Line)
30 June 2016 (LRT)
1 May 2001 (KL Sentral-Skypark Line)
Sultan Ismail  AG5 
 SP5 
Sultan Ismail 3 Ampang Line
4 Sri Petaling Line
Rapid Rail LRT Kuala Lumpur 16 December 1996
Sungai Besi  SP16 
 PY29 
Sungai Besi 4 Sri Petaling Line
12 Putrajaya Line
Rapid Rail LRT
MRT
Kuala Lumpur 11 July 1998
(LRT)
16 March 2023
(MRT)
Sungai Buloh  KA08 
 PY04 
Sungai Buloh 2 Tanjung Malim-Port Klang Line
12 Putrajaya Line
KTM
Rapid Rail
Commuter rail
MRT
Selayang 1995
(KTM Komuter)
16 December 2016
(MRT)
Sungai Gadut  KB16  Sungai Gadut 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 14 May 2011
Sungai Jernih  KG33  Sungai Jernih 9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
SunMed  SB4  SunMed B1 BRT Sunway Line Rapid Bus BRT Subang Jaya 2 June 2015
SunU-Monash  SB5  SunU-Monash B1 BRT Sunway Line Rapid Bus BRT Subang Jaya 2 June 2015
Sunway Lagoon  SB3  Sunway Lagoon B1 BRT Sunway Line Rapid Bus BRT Subang Jaya 2 June 2015
Surian  KG07  Surian 9 Kajang Line Rapid Rail MRT Petaling Jaya 16 December 2016
Taipan  KJ32  Taipan 5 Kelana Jaya Line Rapid Rail LRT Subang Jaya 30 June 2016
Taman Bahagia  KJ23  Taman Bahagia 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
Taman Connaught  KG26  Taman Connaught 9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017
Taman Equine  PY36  Taman Equine 12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
Taman Jaya  KJ20  Taman Jaya 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
Taman Melati  KJ2  Taman Melati 5 Kelana Jaya Line Rapid Rail LRT Selayang 1 June 1999
Taman Midah  KG24  Taman Midah 9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017
Taman Mutiara  KG25  Taman Mutiara 9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017
Taman Naga Emas  PY28  Taman Naga Emas 12 Putrajaya Line Rapid Rail MRT Kuala Lumpur 16 March 2023
Taman Paramount  KJ22  Taman Paramount 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
Taman Perindustrian Puchong  SP26  Taman Perindustrian Puchong 4 Sri Petaling Line Rapid Rail LRT Subang Jaya 31 March 2016
Taman Pertama  KG23  Taman Pertama 9 Kajang Line Rapid Rail MRT Kuala Lumpur 17 July 2017
Taman Suntex  KG27  Taman Suntex 9 Kajang Line Rapid Rail MRT Kajang 17 July 2017
Taman Tun Dr Ismail (Taman Tun Dr Ismail-Deloitte)  KG10  Taman Tun Dr Ismail 9 Kajang Line Rapid Rail MRT Kuala Lumpur 16 December 2016
Taman Wahyu  KC04  Taman Wahyu 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur April 2010
Tanjung Malim  KA15  Tanjung Malim 2 Tanjung Malim-Port Klang Line KTM Commuter rail Tanjung Malim 1 June 2008
Teluk Gadong  KD16  Teluk Gadong 2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Teluk Pulai  KD15  Teluk Pulai 2 Tanjung Malim-Port Klang Line KTM Commuter rail Klang 1995
Terminal Skypark  KS03  Terminal Skypark 10 KL Sentral-Terminal Skypark Line KTM Airport rail link Subang Jaya 1 May 2018
Tiroi  KB13  Tiroi 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Seremban 1995
Titiwangsa  AG3 
 SP3 
 MR11 
 PY17 
Titiwangsa 3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
Rapid Rail LRT
Monorail
MRT
Kuala Lumpur 11 July 1998
(LRT)
31 August 2003
(Monorail)
16 March 2023
(MRT)
Tun Razak Exchange (Tun Razak Exchange-Samsung Galaxy)  KG20 
 PY23 
Tun Razak Exchange 9 Kajang Line
12 Putrajaya Line
Rapid Rail MRT Kuala Lumpur 17 July 2017
(Kajang Line)
16 March 2023
(Putrajaya Line)
Tun Sambanthan  MR2  Tun Sambanthan 8 KL Monorail Rapid Rail Monorail Kuala Lumpur 31 August 2003
Universiti  KJ19  Universiti 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 September 1998
UKM  KB08  UKM 1 Batu Caves-Pulau Sebang Line KTM Commuter rail Kuala Lumpur 1995
UPM  PY34  UPM 12 Putrajaya Line Rapid Rail MRT Subang Jaya 16 March 2023
USJ 7  KJ31 
 SB7 
USJ7 5 Kelana Jaya Line
B1 BRT Sunway Line
Rapid Rail
Rapid Bus
LRT
BRT
Subang Jaya 30 June 2016
(LRT)
2 June 2015
(BRT)
USJ 21  KJ34  USJ 21 5 Kelana Jaya Line Rapid Rail LRT Subang Jaya 30 June 2016
Wangsa Maju  KJ3  Wangsa Maju 5 Kelana Jaya Line Rapid Rail LRT Kuala Lumpur 1 June 1999
Wawasan  KJ33  Wawasan 5 Kelana Jaya Line Rapid Rail LRT Subang Jaya 30 June 2016
16 Sierra  PY38  16 Sierra 12 Putrajaya Line Rapid Rail MRT Sepang 16 March 2023

List of stations according to lines

[edit]
Map
Railway lines around Klang Valley
Lines Type Termini Number of Stations Length (km) Owner Operator Status
1 Batu Caves-Pulau Sebang Line Commuter rail Batu Caves 27 135.6 KTM KTM Operational
Pulau Sebang/Tampin
2 Tanjung Malim-Port Klang Line Commuter rail Tanjung Malim 34 127.5 KTM KTM Operational
Port Klang
3 Ampang Line LRT Sentul Timur 18 15 Prasarana Malaysia Rapid Rail Operational
Ampang
4 Sri Petaling Line LRT Sentul Timur 29 37.6 Prasarana Malaysia Rapid Rail Operational
Putra Heights
5 Kelana Jaya Line LRT Gombak 37 46.4 Prasarana Malaysia Rapid Rail Operational
Putra Heights
6 KLIA Ekspres Express Airport rail link KL Sentral 3 59.1 Express Rail Link (ERL) ERL Operational
KLIA T2
7 KLIA Transit Airport rail link KL Sentral 6 Express Rail Link (ERL) ERL Operational
KLIA T2
8 KL Monorail Monorail KL Sentral 11 8.6 Prasarana Malaysia Rapid Rail Operational
Titiwangsa
9 Kajang Line MRT Kwasa Damansara 29 46 MRT Corp Rapid Rail Operational
Kajang
10 KL Sentral-Terminal Skypark Line Limited express airport rail link KL Sentral 3 24.5 KTM KTM Suspended[1]
Terminal Skypark
11 Shah Alam Line LRT Bandar Utama 25 37 Prasarana Malaysia Rapid Rail Under construction (Opening in 2025)
Johan Setia
12 Putrajaya Line MRT Kwasa Damansara 36 57.7 MRT Corp Rapid Rail Operational
Putrajaya Sentral
13 Circle Line MRT Loop line 31 51 MRT Corp Rapid Rail Pre-construction[2]
B1 BRT Sunway Line Bus rapid transit (BRT) Sunway-Setia Jaya 7 5.6 Prasarana Malaysia Rapid Bus Operational
USJ 7
Total
197[Note 1] 613.8

Legend
Integrated ticketing link Interchange station (paid link)

Klrt-unpaid link Connecting station (unpaid link)

Airport interchange Connected with airport

Express train Connected with intercity rail service

Bus interchange Connected with long-distance bus terminal

Rail line denoted in Italics - Under construction

Station name denoted in Italics - Provisioned/future station

Commuter rail lines

[edit]

The KTM Komuter has two main lines, namely the 1 Batu Caves-Pulau Sebang Line and the 2 Tanjung Malim-Port Klang Line.[3] These two lines begin separately, but share a common route between Putra and KL Sentral stations, before splitting again and heading towards their respective termini. This effectively makes Putra, Bank Negara, Kuala Lumpur and KL Sentral interchange stations between the two lines. The station codes are given based on the portion of the lines the stations are on. (Station code legend: K-Komuter, A-Tanjung Malim route, B-Pulau Sebang/Tampin route, C-Batu Caves route, D-Port Klang route)

Station Code Station Name Interchanges/Connections Opening District/City State/Territory
1 - KTM Batu Caves-Pulau Sebang Line
 KC05  Batu Caves 29 July 2010 Gombak  Selangor
 KC04  Taman Wahyu  Kuala Lumpur  Federal Territories
 KC03  Kampung Batu Klrt-unpaid link 12 Putrajaya Line
 KC02  Batu Kentonmen
 KC01  Sentul 1995
 KA04  Putra Integrated ticketing link 2 Tanjung Malim-Port Klang Line

Klrt-unpaid link (PWTC)
3 Ampang Line
4 Sri Petaling Line

 KA03  Bank Negara Integrated ticketing link 2 Tanjung Malim-Port Klang Line

Klrt-unpaid link (Bandaraya)
3 Ampang Line
4 Sri Petaling Line

 KA02  Kuala Lumpur Integrated ticketing link 2 Tanjung Malim-Port Klang Line

Klrt-unpaid link
5 Kelana Jaya Line (Pasar Seni)
9 Kajang Line (Pasar Seni)
Express train KTM ETS

 KA01  KL Sentral Integrated ticketing link 2 Tanjung Malim-Port Klang Line

Klrt-unpaid link
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 2]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS

16 April 2001
 KB01  Mid Valley Klrt-unpaid link (Abdullah Hukum)[Note 3]
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
23 August 2004
 KB02  Seputeh 1995
 KB03  Salak Selatan
 KB04  Bandar Tasik Selatan Klrt-unpaid link
4 Sri Petaling Line
7 KLIA Transit
Express train KTM ETS
Bus interchange Southern Integrated Terminal (TBS)
 KB05  Serdang Subang Jaya  Selangor
 KB06  Kajang Klrt-unpaid link
9 Kajang Line
Express train KTM ETS
Hulu Langat
 KB07  Kajang 2 13 March 2023
 KB08  UKM 1995
 KB09  Bangi
 KB10  Batang Benar Seremban  Negeri Sembilan
 KB11  Nilai
 KB12  Labu
 KB13  Tiroi
 KB14  Seremban Express train KTM ETS
 KB15  Senawang 14 May 2011
 KB16  Sungai Gadut
 KB17  Rembau 30 August 2013 Rembau
 KB18  Pulau Sebang/Tampin Express train KTM ETS 10 October 2015 Alor Gajah  Malacca
2 - KTM Tanjung Malim-Port Klang Line
 KA15  Tanjung Malim Express train KTM ETS 1 June 2009 Muallim  Perak
 KA14  Kuala Kubu Bharu Express train KTM ETS 5 January 2008 Hulu Selangor  Selangor
 KA13  Rasa 21 April 2007
 KA12  Batang Kali Express train KTM ETS
 KA11  Serendah
 KA10  Rawang Express train KTM ETS 1995 Gombak
 KA09  Kuang
 KA08  Sungai Buloh Klrt-unpaid link
12 Putrajaya Line
Express train KTM ETS
Petaling Jaya
 KA07  Kepong Sentral Klrt-unpaid link
12 Putrajaya Line (Sri Damansara Timur)
Express train KTM ETS
1 July 2006
 KA06  Kepong 1995  Kuala Lumpur  Federal Territories
Segambut 2 November 2025
 KA05  Segambut 1995
Jalan Kuching Klrt-unpaid link 13 Circle Line 2028 - 2030
 KA04  Putra Integrated ticketing link 1 Batu Caves-Pulau Sebang Line

Klrt-unpaid link (PWTC)
3 Ampang Line
4 Sri Petaling Line

1995
 KA03  Bank Negara Integrated ticketing link 1 Batu Caves-Pulau Sebang Line

Klrt-unpaid link (Bandaraya)
3 Ampang Line
4 Sri Petaling Line

 KA02  Kuala Lumpur Integrated ticketing link 1 Batu Caves-Pulau Sebang Line

Klrt-unpaid link
5 Kelana Jaya Line (Pasar Seni)
9 Kajang Line (Pasar Seni)
Express train KTM ETS

 KA01  KL Sentral Integrated ticketing link 1 Batu Caves-Pulau Sebang Line


Klrt-unpaid link
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 2]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS

16 April 2001
 KD01  Abdullah Hukum Klrt-unpaid link
5 Kelana Jaya Line
1 Batu Caves-Pulau Sebang Line (Mid Valley)[Note 3]
28 October 2018
 KD02  Angkasapuri 1995
 KD03  Pantai Dalam Klrt-unpaid link 13 Circle Line
 KD04  Petaling Petaling Jaya  Selangor
 KD05  Jalan Templer
 KD06  Kampung Dato Harun
 KD07  Seri Setia
 KD08  Setia Jaya Klrt-unpaid link B1 BRT Sunway Line (Sunway-Setia Jaya)
 KD09  Subang Jaya Klrt-unpaid link
5 Kelana Jaya Line
10 KL Sentral-Terminal Skypark Line
Subang Jaya
 KD10  Batu Tiga Shah Alam
 KD11  Shah Alam
 KD12  Padang Jawa
 KD13  Bukit Badak Klang
 KD14  Klang
 KD15  Teluk Pulai
 KD16  Teluk Gadong
 KD17  Kampung Raja Uda
 KD18  Jalan Kastam
 KD19  Port Klang

Light rapid transit (LRT) lines

[edit]

There are three LRT lines currently operating in the Klang Valley, namely the 3 Ampang Line, 4 Sri Petaling Line, and 5 Kelana Jaya Line.[4] The upcoming 11 Shah Alam Line, proposed in 2015 and currently under construction, is slated to open August 2025.[5][6][7]

The Ampang and Sri Petaling Lines operate as a single LRT system. They share a common route from Sentul Timur station to Chan Sow Lin station, therefore, all stations on this route act as interchange stations between both the lines. After Chan Sow Lin, the lines split toward their respective termini. The Kelana Jaya Line starts at Gombak in the north, passing through the city centre, and terminating at Putra Heights station which is also the southern terminus of the Sri Petaling Line, serving as an interchange between the two lines.

The Shah Alam Line, upon completion, will be the first rail transit line in the Klang Valley Integrated Transit System to be situated completely outside the borders of Kuala Lumpur.

Station Code Station Name Interchanges/Connections Opening District/City State/Territory
3 - LRT Ampang Line
 AG1  Sentul Timur Integrated ticketing link 4 Sri Petaling Line 6 December 1998  Kuala Lumpur  Federal Territories
 AG2  Sentul Integrated ticketing link 4 Sri Petaling Line
 AG3  Titiwangsa Integrated ticketing link
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
13 Circle Line
 AG4  PWTC Integrated ticketing link 4 Sri Petaling Line

Klrt-unpaid link (Putra)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 AG5  Sultan Ismail Integrated ticketing link 4 Sri Petaling Line

Klrt-unpaid link 8 KL Monorail (Medan Tuanku)

16 December 1996
 AG6  Bandaraya Integrated ticketing link 4 Sri Petaling Line

Klrt-unpaid link (Bank Negara)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 AG7  Masjid Jamek Integrated ticketing link
4 Sri Petaling Line
5 Kelana Jaya Line
 AG8  Plaza Rakyat Integrated ticketing link
4 Sri Petaling Line
9 Kajang Line (Merdeka)
 AG9  BBCC–Hang Tuah Integrated ticketing link
4 Sri Petaling Line
8 KL Monorail
 AG10  Pudu Integrated ticketing link 4 Sri Petaling Line
 AG11  Chan Sow Lin Integrated ticketing link
4 Sri Petaling Line
12 Putrajaya Line
 AG12  Miharja
 AG13  Maluri Integrated ticketing link 9 Kajang Line
 AG14  Pandan Jaya Ampang  Selangor
 AG15  Pandan Indah Integrated ticketing link 13 Circle Line
 AG16  Cempaka
 AG17  Cahaya
 AG18  Ampang
4 - LRT Sri Petaling Line
 SP1  Sentul Timur Integrated ticketing link 3 Ampang Line 6 December 1998  Kuala Lumpur  Federal Territories
 SP2  Sentul Integrated ticketing link 3 Ampang Line
 SP3  Titiwangsa Integrated ticketing link
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
13 Circle Line
 SP4  PWTC Integrated ticketing link 3 Ampang Line

Klrt-unpaid link (Putra)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 SP5  Sultan Ismail Integrated ticketing link 3 Ampang Line

Klrt-unpaid link 8 KL Monorail (Medan Tuanku)

 SP6  Bandaraya Integrated ticketing link 3 Ampang Line

Klrt-unpaid link (Bank Negara)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

16 December 1996
 SP7  Masjid Jamek Integrated ticketing link
3 Ampang Line
5 Kelana Jaya Line
 SP8  Plaza Rakyat Integrated ticketing link
3 Ampang Line
9 Kajang Line (Merdeka)
 SP9  BBCC–Hang Tuah Integrated ticketing link
3 Ampang Line
8 KL Monorail
 SP10  Pudu Integrated ticketing link 3 Ampang Line
 SP11  Chan Sow Lin Integrated ticketing link
3 Ampang Line
12 Putrajaya Line
 SP12  Cheras 11 July 1996
 SP13  Salak Selatan Integrated ticketing link 13 Circle Line
 SP14  Bandar Tun Razak
 SP15  Bandar Tasik Selatan Klrt-unpaid link
1 Batu Caves-Pulau Sebang Line
7 KLIA Transit
Express train KTM ETS
Bus interchange Southern Integrated Terminal (TBS)
 SP16  Sungai Besi Integrated ticketing link 12 Putrajaya Line
 SP17  Bukit Jalil
 SP18  Sri Petaling
 SP19  Awan Besar 31 October 2015
 SP20  Muhibbah
 SP21  Alam Sutera
 SP22  Kinrara BK5 Subang Jaya  Selangor
 SP24  IOI Puchong Jaya 31 March 2016
 SP25  Pusat Bandar Puchong
 SP26  Taman Perindustrian Puchong
 SP27  Bandar Puteri
 SP28  Puchong Perdana 30 June 2016
 SP29  Puchong Prima
 SP31  Putra Heights Integrated ticketing link 5 Kelana Jaya Line
5 - LRT Kelana Jaya Line
 KJ1  Gombak Express train  ECR  East Coast Rail Link (ECR)
Bus interchange Eastern Integrated Terminal (TBT)
1 June 1999 Gombak  Selangor
 KJ2  Taman Melati  Kuala Lumpur  Federal Territories
 KJ3  Wangsa Maju
 KJ4  Sri Rampai 24 December 2010
 KJ5  Setiawangsa Integrated ticketing link 13 Circle Line 1 June 1999 Ampang  Selangor
 KJ6  Jelatek
 KJ7  Dato' Keramat  Kuala Lumpur  Federal Territories
 KJ8  Damai
 KJ9  Ampang Park Klrt-unpaid link 12 Putrajaya Line
 KJ10  KLCC
 KJ11  Kampung Baru
 KJ12  Dang Wangi Klrt-unpaid link 8 KL Monorail (Bukit Nanas)
 KJ13  Masjid Jamek Integrated ticketing link
3 Ampang Line
4 Sri Petaling Line
 KJ14  Pasar Seni Integrated ticketing link 9 Kajang Line

Klrt-unpaid link (Kuala Lumpur)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
Express train KTM ETS

1 September 1998
 KJ15  KL Sentral–redONE Klrt-unpaid link
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 2]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS
16 April 2001
 KJ16  Bank Rakyat–Bangsar 1 September 1998
 KJ17  Abdullah Hukum Klrt-unpaid link
2 Tanjung Malim-Port Klang Line
1 Batu Caves-Pulau Sebang Line (Mid Valley)[Note 3]
 KJ18  Kerinchi
 KJ19  Universiti Klrt-unpaid link 13 Circle Line
 KJ20  Taman Jaya Petaling Jaya  Selangor
 KJ21  Asia Jaya
 KJ22  Taman Paramount
 KJ23  Taman Bahagia
 KJ24  Kelana Jaya
 KJ25  Lembah Subang 30 June 2015
 KJ26  Ara Damansara
 KJ27  CGC-Glenmarie Integrated ticketing link 11 Shah Alam Line Shah Alam
 KJ28  Subang Jaya Klrt-unpaid link
2 Tanjung Malim-Port Klang Line
10 KL Sentral-Terminal Skypark Line
Subang Jaya
 KJ29  SS15
 KJ30  SS18
 KJ31  USJ 7 Integrated ticketing link B1 BRT Sunway Line
 KJ32  Taipan
 KJ33  Wawasan
 KJ34  USJ 21
 KJ35  Alam Megah Shah Alam
 KJ36  Subang Alam
 KJ37  Putra Heights Integrated ticketing link 4 Sri Petaling Line Subang Jaya
11 - LRT Shah Alam Line (opening August 2025)
 SA01  Bandar Utama Integrated ticketing link 9 Kajang Line August 2025 Petaling Jaya  Selangor
 SA02  Kayu Ara
 SA03  BU11
 SA04  Tropicana
 SA05  Damansara Idaman
 SA06  SS7
 SA07  Glenmarie Integrated ticketing link 5 Kelana Jaya Line Shah Alam
 SA08  Temasya
 SA09  Kerjaya
 SA10  Stadium Shah Alam
 SA12  Dato' Menteri
 SA13  Raja Muda
 SA14  UiTM Shah Alam
 SA15  Seksyen 7 Shah Alam
 SA16  Bukit Raja Selatan Klang
 SA17  Bandar Baru Klang
 SA18  Pasar Besar Klang
 SA19  Jalan Meru
 SA20  Pasar Jawa
 SA21  Taman Selatan
 SA22  Seri Andalas
 SA23  Klang Jaya
 SA24  Bandar Bukit Tinggi
 SA25  Bandar Botanik
 SA26  Johan Setia

Bus rapid transit (BRT) Lines

[edit]

The B1 BRT Sunway Line is a bus rapid transit line in Bandar Sunway, Selangor. The BRT line is a public-private partnership project between Prasarana Malaysia and Sunway Group to provide an integrated transit service for the residents and commuters of Bandar Sunway and USJ.[8]

A second BRT line known as the B2 BRT Federal Line was proposed but has been scrapped indefinitely by the government.

Station Code Station Name Interchanges/Connections Opening District/City State/Territory
B1 - BRT Sunway Line
 SB1  Sunway-Setia Jaya Klrt-unpaid link 2 Tanjung Malim-Port Klang Line (Setia Jaya) 2 June 2015 Petaling Jaya  Selangor
 SB2  Mentari
 SB3  Sunway Lagoon Subang Jaya
 SB4  SunMed
 SB5  SunU-Monash
 SB6  South Quay-USJ 1
 SB7  USJ 7 Integrated ticketing link 5 Kelana Jaya Line
[edit]

There are two main airport rail link systems. One is operated by Express Rail Link (ERL) and another one by Keretapi Tanah Melayu (KTM).

The ERL system consists of two lines, namely the 6 KLIA Ekspres and the 7 KLIA Transit.[9] The KLIA Ekspres is a non-stop service between KL Sentral and the Kuala Lumpur International Airport (KLIA), and does not stop at any station in between (hence the name "express"). The KLIA Transit services all stations between KL Sentral and KLIA (hence the name "transit").

The 10 KL Sentral-Terminal Skypark Line, operated by KTM as part of its KTM Komuter service, serves the Sultan Abdul Aziz Shah Airport (also known as Subang Airport), spanning 26 km from KL Sentral to Terminal Skypark station. The line shares a common route with the Tanjung Malim-Port Klang Line, but only stops at one station in between, Subang Jaya.[10]

Station Code Station Name Interchanges/Connections Opening District/City State/Territory
6 - ERL KLIA Ekspres
7 - ERL KLIA Transit
 KE1  KT1  KL Sentral Klrt-unpaid link
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
8 KL Monorail[Note 2]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS
14 April 2002 (KLIA Ekspres)
20 June 2002 (KLIA Transit)
 Kuala Lumpur  Federal Territories
 KT2  Bandar Tasik Selatan Klrt-unpaid link
1 Batu Caves-Pulau Sebang Line
4 Sri Petaling Line
Express train KTM ETS
Bus interchange Southern Integrated Terminal (TBS)
 KT3  Putrajaya & Cyberjaya Klrt-unpaid link
12 Putrajaya Line (Putrajaya Sentral)
 Putrajaya
 KT4  Salak Tinggi Sepang  Selangor
 KE2  KT5  KLIA T1 Airport interchange Kuala Lumpur International Airport
 KE3  KT6  KLIA T2 1 May 2014
10 - KTM KL Sentral-Terminal Skypark Line
 KS01  KL Sentral Klrt-unpaid link
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 2]
9 Kajang Line (Muzium Negara)
Express train KTM ETS
1 May 2018  Kuala Lumpur  Federal Territories
 KS02  Subang Jaya Klrt-unpaid link
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
Subang Jaya  Selangor
 KS03  Terminal Skypark Airport interchange Sultan Abdul Aziz Shah Airport Shah Alam

Monorail lines

[edit]

The 8 KL Monorail is situated entirely within Kuala Lumpur city centre and serves the various shopping and entertainment centres throughout the city centre.

The 14 Putrajaya Monorail is a proposed transit line that was meant to serve the administrative capital of Putrajaya. The line's construction began in 2004 but was halted due to the city's low population. As of 2024, the Government of Malaysia has no plans to revive the stalled monorail project.


Station Code Station Name Interchanges/Connections Opening District/City State/Territory
8 - KL Monorail
 MR1  KL Sentral Klrt-unpaid link
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS
31 August 2003  Kuala Lumpur  Federal Territories
 MR2  Tun Sambanthan
 MR3  Maharajalela
 MR4  BBCC–Hang Tuah Integrated ticketing link
3 Ampang Line
4 Sri Petaling Line
 MR5  Imbi
 MR6  Bukit Bintang Klrt-unpaid link 9 Kajang Line
 MR7  Raja Chulan
 MR8  Bukit Nanas Klrt-unpaid link 5 Kelana Jaya Line (Dang Wangi)
 MR9  Medan Tuanku Klrt-unpaid link (Sultan Ismail)
3 Ampang Line
4 Sri Petaling Line
 MR10  Chow Kit
 MR11  Titiwangsa Integrated ticketing link
3 Ampang Line
4 Sri Petaling Line
12 Putrajaya Line
13 Circle Line

Mass rapid transit (MRT) lines

[edit]

There are two MRT lines currently operating in the Klang Valley, namely the 9 Kajang Line and the 12 Putrajaya Line.

Both MRT lines begin at their shared northern terminus, Kwasa Damansara station, which provides a cross-platform interchange between the two lines. The Kajang Line proceeds southward, while the Putrajaya Line travels north-eastward and then south towards the city centre, where the two lines interchange again at Tun Razak Exchange station, before proceeding towards their respective termini.

A third MRT line, the proposed 13 Circle Line, is currently undergoing a pre-construction phase. The line will form a loop around the city centre.

Code Station Name Interchanges/Connections District/City State/Territory
9 - MRT Kajang Line
 KG04  Kwasa Damansara Integrated ticketing link 12 Putrajaya Line
Bus interchange Northern Integrated Terminal (TBU)
16 December 2016 Shah Alam  Selangor
 KG05  Kwasa Sentral
 KG06  Kota Damansara-Thomson Hospital Petaling Jaya
 KG07  Surian
 KG08  Mutiara Damansara
 KG09  Bandar Utama Integrated ticketing link 11 Shah Alam Line
 KG10  Taman Tun Dr Ismail–Deloitte (TTDI)  Kuala Lumpur  Federal Territories
 KG12  Phileo Damansara
 KG12A  Bukit Kiara Selatan Integrated ticketing link 13 Circle Line March 2027
 KG13  Pavilion Damansara Heights–Pusat Bandar Damansara 16 December 2016
 KG14  Semantan
 KG15  Muzium Negara Klrt-unpaid link (KL Sentral)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 2]
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS
17 July 2017
 KG16  Pasar Seni Integrated ticketing link 5 Kelana Jaya Line

Klrt-unpaid link (Kuala Lumpur)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
Express train KTM ETS
 KG17  Merdeka Integrated ticketing link (Plaza Rakyat)
3 Ampang Line
4 Sri Petaling Line
 KG18A  Pavilion Kuala Lumpur–Bukit Bintang Klrt-unpaid link 8 KL Monorail
 KG20  Tun Razak Exchange–Samsung Galaxy (TRX) Integrated ticketing link 12 Putrajaya Line
 KG21  Cochrane
 KG22  AEON–Maluri Integrated ticketing link 3 Ampang Line
 KG23  Taman Pertama
 KG24  Taman Midah Integrated ticketing link 13 Circle Line
 KG25  Taman Mutiara
 KG26  Taman Connaught
 KG27  Taman Suntex Hulu Langat  Selangor
 KG28  Sri Raya
 KG29  Bandar Tun Hussein Onn
 KG30  Batu 11 Cheras
 KG31  Bukit Dukung
 KG33  Sungai Jernih
 KG34  Stadium Kajang
 KG35  Kajang Klrt-unpaid link
1 Batu Caves-Pulau Sebang Line
Express train KTM ETS
12 - MRT Putrajaya Line[11]
 PY01  Kwasa Damansara Integrated ticketing link 9 Kajang Line
Bus interchange Northern Integrated Terminal (TBU)
16 June 2022 Shah Alam  Selangor
 PY03  Kampung Selamat Petaling Jaya
 PY04  Sungai Buloh Klrt-unpaid link
2 Tanjung Malim-Port Klang Line
Express train KTM ETS
 PY05  Damansara Damai
 PY06  Sri Damansara Barat
 PY07  Sri Damansara Sentral
 PY08  Sri Damansara Timur Klrt-unpaid link (Kepong Sentral)
2 Tanjung Malim-Port Klang Line
Express train KTM ETS
 PY09  Metro Prima  Kuala Lumpur  Federal Territories
 PY10  Kepong Baru
 PY11  Jinjang
 PY12  Sri Delima
 PY13  Kampung Batu Klrt-unpaid link 1 Batu Caves-Pulau Sebang Line
 PY14  Kentonmen 16 March 2023
 PY15  Jalan Ipoh
 PY16  Sentul Barat
 PY17  Titiwangsa Integrated ticketing link
3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
13 Circle Line
 PY18  Hospital Kuala Lumpur
 PY19  Raja Uda–UTM
 PY20  Ampang Park Klrt-unpaid link 5 Kelana Jaya Line
 PY21  Persiaran KLCC
 PY22  Conlay–Kompleks Kraf
 PY23  Tun Razak Exchange–Samsung Galaxy (TRX) Integrated ticketing link 9 Kajang Line
 PY24  Chan Sow Lin Integrated ticketing link
3 Ampang Line
4 Sri Petaling Line
 PY27  Kuchai Integrated ticketing link 13 Circle Line
 PY28  Taman Naga Emas
 PY29  Sungai Besi Integrated ticketing link 4 Sri Petaling Line
 PY31  Serdang Raya Utara Subang Jaya  Selangor
 PY32  Serdang Raya Selatan
 PY33  Serdang Jaya
 PY34  UPM
 PY36  Taman Equine
 PY37  Putra Permai
 PY38  16 Sierra Sepang
 PY39  Cyberjaya Utara–Finexus
 PY40  Cyberjaya City Centre–Limkokwing
 PY41  Putrajaya Sentral Klrt-unpaid link
7 KLIA Transit (Putrajaya & Cyberjaya)
 Putrajaya  Federal Territories
13 - MRT Circle Line (Opening 2028-2030)[12]
 CC01  Bukit Kiara Selatan Integrated ticketing link 9 Kajang Line 2028 - 2030  Kuala Lumpur  Federal Territories
 CC02  Bukit Kiara
 CC03  Sri Hartamas
 CC04  Mont Kiara
 CC05  Bukit Segambut
 CC06  Taman Sri Sinar
 CC07  Dutamas
 CC08  Jalan Kuching Klrt-unpaid link 2 Tanjung Malim-Port Klang Line
 CC09  Titiwangsa Integrated ticketing link
3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
 CC10  Kampung Puah
 CC11  Jalan Langkawi
 CC12  Danau Kota
 CC13  Setapak
 CC14  Rejang
 CC15  Setiawangsa Integrated ticketing link 5 Kelana Jaya Line Ampang  Selangor
 CC16  AU2
 CC17  Taman Hillview
 CC18  Tasik Ampang
 CC19  Kampung Pandan
 CC20  Pandan Indah Integrated ticketing link 3 Ampang Line
 CC21  Taman Kencana
 CC22  Taman Cheras  Kuala Lumpur  Federal Territories
 CC23  Taman Midah Integrated ticketing link 9 Kajang Line
 CC24  Jalan Yaacob Latif
 CC25  Sri Permaisuri
 CC26  Salak Selatan Integrated ticketing link 4 Sri Petaling Line
 CC07  Salak Jaya
 CC28  Kuchai Integrated ticketing link 12 Putrajaya Line
 CC29  Jalan Klang Lama
 CC30  Pantai Dalam Klrt-unpaid link 2 Tanjung Malim-Port Klang Line
 CC31  Pantai Permai
 CC32  Universiti Klrt-unpaid link 5 Kelana Jaya Line
 CC33  UM

Klang Valley Integrated Transit Map

[edit]

The official Klang Valley Integrated Transit Map, released by Rapid KL, illustrates the connectivity between the different lines through interchanges and connecting stations. The map consists of all operational lines in the Klang Valley Integrated Transit system, as well as the upcoming Shah Alam Line. The map also features stations with parking facilities.

The transit map does not include the proposed Circle Line.

  • Latest version: [1]

Notes

[edit]
  1. ^ a b Counting interchange stations (paid area integration) and connecting stations (non-paid area integration) within same station building only once.
  2. ^ a b c d e f KL Monorail's KL Sentral station is across the busy Jalan Tun Sambanthan, and it is connected with the overhead bridge that integrates the station with the new retails shopping complex, NU Sentral, and other lines in KL Sentral main hub.
  3. ^ a b c Connection between Abdullah Hukum station and Mid Valley station is possible via a pedestrian bridge across the Klang River, through KL Eco City Mall.

References

[edit]
  1. ^ "Skypark-KL Sentral rail link to be temporarily halted starting Feb 15". The Star. Retrieved 12 July 2023.
  2. ^ "MASS RAPID TRANSIT LALUAN 3: LALUAN LINGKARAN - SIA & EIA Activities". The Star. Retrieved 20 September 2021.
  3. ^ "KTM BERHAD". www.ktmb.com.my. Archived from the original on 3 April 2017. Retrieved 2 April 2017.
  4. ^ "MyRapid". www.myrapid.com.my. Retrieved 2 April 2017.
  5. ^ "Alignment & Stations | LRT3". www.lrt3.com.my. Retrieved 2 April 2017.
  6. ^ Tan, Danny. "LRT3 Shah Alam Line to start operations in Q3 2025 – delay from March target, physical work 95% complete". Paul Tan's Automotive News. Retrieved 29 July 2024.
  7. ^ "LRT3 to begin taking passengers by 3Q next year, says Loke". New Straits Times. Retrieved 29 July 2024.
  8. ^ "MyRapid". www.myrapid.com.my. Retrieved 2 April 2017.
  9. ^ Bhd, Express Rail Link Sdn. "KLIA Ekspres Schedule". www.kliaekspres.com. Retrieved 2 April 2017.
  10. ^ "Subang SkyPark Terminal Extension Project | Official Suruhanjaya Pengangkutan Awam Darat (S.P.A.D.) Website". www.spad.gov.my. Retrieved 2 April 2017.
  11. ^ "Archived copy". Archived from the original on 17 April 2016. Retrieved 9 November 2017.{{cite web}}: CS1 maint: archived copy as title (link)
  12. ^ "MRT Circle Line (LATEST)". edgeprop.my. Retrieved 15 March 2022.