Lianhuaqiao station
Appearance
(Redirected from Lianhuaqiao Station)
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Lianhua Bridge (West 3rd Ring Road Middle and Lianhuachi West Road (莲花池西路) / Lianhuachi East Road (莲花池东路)) Haidian District, Beijing China | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 10 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2012 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Lianhuaqiao station[1] (simplified Chinese: 莲花桥站; traditional Chinese: 蓮花橋站; pinyin: Liánhuāqiáo zhàn) is a station on Line 10 of the Beijing Subway.[2][3] This station opened on December 30, 2012.[4] It will be an interchange station between Line 10 and Line 11 (Phase 2).[5][6] The station is named after the nearby grade-separated junction called Lianhua Bridge.
Station layout
[edit]The station has an underground island platform.
Exits
[edit]There are 3 exits, lettered B, C, and D. Exit B is accessible.
Gallery
[edit]-
Station Hall
-
Platform
References
[edit]- ^ "Jpg格式线路图下载 | 北京地铁官方网站".
- ^ 地铁10号线二期I段设计方案敲定 [Metro Line 10 to finalize the design of the second phase segment I]. Beijing Municipal Commission of Housing and Urban-Rural Development (in Chinese). June 30, 2008. Archived from the original on November 1, 2014.
- ^ 分钟寺到石榴庄公交车查询 [Fenzhongsi to Shiliuzhuang Bus Inquiry]. 全国各省市公交查询 (in Chinese). Archived from the original on April 16, 2014.
- ^ 北京四地铁线30日开通 首末车时间确定 (in Chinese). QQ News. Retrieved December 26, 2012.
- ^ "3条轨道线将穿越新首钢区域". 2019-02-14.
- ^ "地铁11号线二期已启动西段东延线站位选线选址工作".
External links
[edit]- Media related to Lianhuaqiao Station at Wikimedia Commons
39°53′50″N 116°18′38″E / 39.8972°N 116.3105°E