File:STS-34 Galileo processing at KSC's SAEF-2 planetary spacecraft facility (S89-42091).jpg
Appearance
Size of this preview: 600 × 600 pixels. Other resolutions: 240 × 240 pixels | 480 × 480 pixels | 768 × 768 pixels | 1,024 × 1,024 pixels | 2,048 × 2,048 pixels | 4,042 × 4,042 pixels.
Original file (4,042 × 4,042 pixels, file size: 1.64 MB, MIME type: image/jpeg)
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 06:55, 30 May 2020 | 4,042 × 4,042 (1.64 MB) | Huntster | == {{int:filedesc}} == {{Information |Description={{en|1=At the Kennedy Space Center's (KSC's) Spacecraft Assembly and Encapsulation Facility 2 (SAEF-2), the planetary spacecraft checkout facility, clean-suited technicians work on the Galileo spacecraft prior to moving it to the Vehicle Processing Facility (VPF) for mating with the inertial upper stage (IUS). Galileo is scheduled for launch aboard Atlantis, Orbiter Vehicle (OV) 104, on Space Shuttle Mission STS-34 in October 1989. It will be... |
File usage
The following page uses this file: